Residential Plumbing Permit in Farmington, New Mexico

Required for plumbing installations, alterations, and repairs on residential properties in Farmington, governed by the 2021 New Mexico Plumbing Code (2021 UPC as amended, 14.8.2 NMAC).

Verified 2026-07-02 · Source

When you need this permit

  • Permit required for plumbing equipment installation, sewer line work, and water line work
  • Must comply with the 2021 New Mexico Plumbing Code (2021 UPC as amended) — 14.8.2 NMAC
  • New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to obtain a plumbing permit for their own primary residence, provided the homeowner performs the major portion of the work
  • Applications and payment made in person only at the Building Inspection Division office

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan reviewTypical estimate — confirm current times with the Farmington building department
~1–5 business days

How long did your Residential Plumbing Permit permit actually take in Farmington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    Final inspection required for all permits, including plumbing.

See the full Farmington inspection guide — scheduling & re-inspection fees →

Tips

  • Sewer line and water line work each require their own permit per the City's published list of work requiring permits.
  • Farmington uses the 2021 New Mexico Plumbing Code (based on the 2021 Uniform Plumbing Code), not the International Plumbing Code.
  • New Mexico's homeowner plumbing permit exemption applies only to the owner's own primary residence.

Frequently asked questions

The City's published list of work requiring permits does not separately break out water heater replacement, but plumbing equipment work generally requires a permit. Contact the Building Inspection Division at (505) 599-1304 to confirm before starting work.

Plan review for a residential plumbing permit in Farmington typically runs 1–5 business days. This is an estimate, not a published figure — confirm current review times with City of Farmington Community Development Department — Building Inspection Division at (505) 599-1304.

You'll need: Plumbing Permit Application. See the required-documents checklist on this page for details on each.

Farmington requires 1 inspection(s) for a residential plumbing permit, in order: Final Inspection. Schedule each through City of Farmington Community Development Department — Building Inspection Division ((505) 599-1304).

Apply through City of Farmington Community Development Department — Building Inspection Division at 805 Municipal Drive, Annex Building, 2nd Floor, Farmington, NM 87401. Phone: (505) 599-1304, email: buildingdept@farmingtonnm.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. No online permitting or online payment is available; applications and payment (check, money order, cashier's check, or credit card — Discover not accepted) must be made in person at the Annex Building.. Official information: https://www.farmingtonnm.gov/887/Building-Inspection.

Farmington, New Mexico has adopted: 2021 New Mexico Commercial Building Code (2021 IBC as amended) — 14.7.2 NMAC; 2021 New Mexico Residential Building Code (2021 IRC as amended) — 14.7.3 NMAC; 2021 New Mexico Existing Building Code (2021 IEBC as amended) — 14.7.7 NMAC; 2021 New Mexico Earthen Building Materials Code — 14.7.4 NMAC; 2009 New Mexico Non-Load Bearing Baled Straw Construction Building Code — 14.7.5 NMAC; 2021 New Mexico Residential Energy Conservation Code (2021 IECC as amended) — 14.7.6 NMAC; 2021 New Mexico Historic Earthen Buildings Code — 14.7.8 NMAC; 2021 New Mexico Commercial Energy Conservation Code — 14.7.9 NMAC; 2021 New Mexico Plumbing Code (2021 UPC as amended) — 14.8.2 NMAC; 2012 New Mexico Swimming Pool, Spa and Hot Tub Code Phase III (2012 USPSHTC as amended) — 14.8.3 NMAC; 2021 New Mexico Mechanical Code (2021 UMC as amended) — 14.9.2 NMAC; 2012 New Mexico Solar Energy Code (2012 USEC as amended) — 14.9.6 NMAC; 2020 New Mexico Electrical Code (2020 NEC as amended), effective March 28, 2023 — 14.10.4 NMAC; 2012 New Mexico Electrical Safety Code (2012 NESC as amended) — 14.10.5 NMAC; 2021 International Fire Code — adopted by the City of Farmington; 14.5.1 NMAC General Provisions, 14.5.2 NMAC Permits, and 14.5.3 NMAC Inspections (Construction Industries Division rules) — adopted and amended by Chapter 7 of the City of Farmington Code of Ordinances. Local amendments apply — see the Farmington overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.