Automatic Fire Sprinkler System Permit in Rio Rancho, New Mexico

Required for new automatic fire sprinkler system installation or modification in Rio Rancho. Plans are reviewed by the Rio Rancho Fire Rescue Fire Marshal's Office Plans Review Division against NFPA 13 using the Automatic Sprinkler System Checklist (Revised 01/15/2024). The sprinkler trade work itself is permitted through the City's Commercial Plumbing Permit fee schedule, in addition to the Building Permit for the overall construction project.

Verified 2026-07-22 · Source

When you need this permit

  • Sprinkler plans must satisfy the 40-item Automatic Sprinkler System Checklist (Rio Rancho Fire Rescue Fire Marshal's Office Plans Review Division, Revised 01/15/2024, citing NFPA 13 §23.1.3 throughout), including NICET III/FPE-certified designer certificate/credentials and signature, owner/occupant/contractor name and address, construction type, occupancy group, square footage, and the specific edition year of NFPA 13 the system is designed to
  • Plans must show a graphic scale and point of compass, occupancy class of each room/area, city water main size and test results with system elevation relative to the test hydrant, fire department connection size/location/piping arrangement, and backflow preventer manufacturer/size/type
  • Plans must show all control valves, check valves, drain pipes, and test connections; a full-height cross section or schematic diagram; sprinkler make/type/model/K-factor and identification number; and hydraulic reference points and calculations matching the hydraulic calculation sheets, with total water demand and pressure noted at a common reference point
  • Where sprinkler equipment is an addition to an existing system, enough of the existing system must be shown on the plans to make all conditions clear
  • Fire protection sprinkler trade work is permitted via the City's Commercial Plumbing Permit fee schedule, itemized under "Sprinkler System, Fire Protection"
  • A Building Permit (valuation-based, application fee 65% of the Building Permit Fee) is also required for the overall construction project the sprinkler system serves

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Commercial Plumbing Permit — Sprinkler System, Fire ProtectionCommercial Plumbing Permit application form, City of Rio Rancho (rrnm.gov/DocumentCenter/View/76102)
$33.00 each
Base Permit Fee (plumbing)Commercial Plumbing Permit application form, City of Rio Rancho
$33.00
Administrative FeeCommercial Plumbing Permit application form, City of Rio Rancho
$23.00 on all permits
Overtime InspectionCommercial Plumbing Permit application form, City of Rio Rancho
$47.00/hr (2 hour minimum)
Building Permit & Plan Review Application Fee (overall project)Commercial Building Permit & Plan Review Application, City of Rio Rancho — applies to the overall construction project the sprinkler system serves, separate from the plumbing trade-permit fee above
65% of the Building Permit Fee (non-refundable)

Review timeline

Plan review
Not published — contact the department

How long did your Automatic Fire Sprinkler System Permit permit actually take in Rio Rancho?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire Marshal's Office Plan Review

    Fire Marshal's Office Plans Review Division checks submitted hydraulic plans against the 40-item Automatic Sprinkler System Checklist (NFPA 13) before permit issuance

  2. 2

    Rough-In Inspection (Sprinkler Piping)

    Piping, valves, hangers/bracing, and fire department connection installation verified against the approved NFPA 13 plans before concealment, consistent with this file's plumbing-permit entry's standard rough-in process

  3. 3

    Final / Acceptance Test

    Hydrostatic and flush testing, fire department connection, and any waterflow/tamper switch tie-in to the fire alarm system verified before the sprinkler system is placed in service; specific field-scheduling process is coordinated directly through the Fire Marshal's Office Plans Review Division (505.891.5924) and is not separately published on rrnm.gov

See the full Rio Rancho inspection guide — scheduling & re-inspection fees →

Tips

  • The Automatic Sprinkler System Checklist is a 40-item NFPA 13 plan-review checklist — engage a NICET III-certified fire protection designer before submittal to avoid rejected plans.
  • Fire sprinkler installation is billed as plumbing trade work (a $33.00 "Sprinkler System, Fire Protection" line item on the Commercial Plumbing Permit) in addition to the overall Building Permit fee (65% application fee) for the project the system serves.
  • The companion Fire Alarm Checklist asks whether a project is sprinklered or non-sprinklered (item 7) — coordinate sprinkler and fire alarm plan submittals together when a project has both systems.
  • No review timeline for sprinkler plan review is published; call the Fire Marshal's Office Plans Review Division at (505) 891-5924 directly for a project-specific estimate.

Frequently asked questions

Rio Rancho requires an automatic fire sprinkler system permit for: Sprinkler plans must satisfy the 40-item Automatic Sprinkler System Checklist (Rio Rancho Fire Rescue Fire Marshal's Office Plans Review Division, Revised 01/15/2024, citing NFPA 13 §23.1.3 throughout), including NICET III/FPE-certified designer certificate/credentials and signature, owner/occupant/contractor name and address, construction type, occupancy group, square footage, and the specific edition year of NFPA 13 the system is designed to; Plans must show a graphic scale and point of compass, occupancy class of each room/area, city water main size and test results with system elevation relative to the test hydrant, fire department connection size/location/piping arrangement, and backflow preventer manufacturer/size/type; Plans must show all control valves, check valves, drain pipes, and test connections; a full-height cross section or schematic diagram; sprinkler make/type/model/K-factor and identification number; and hydraulic reference points and calculations matching the hydraulic calculation sheets, with total water demand and pressure noted at a common reference point; Where sprinkler equipment is an addition to an existing system, enough of the existing system must be shown on the plans to make all conditions clear; Fire protection sprinkler trade work is permitted via the City's Commercial Plumbing Permit fee schedule, itemized under "Sprinkler System, Fire Protection"; A Building Permit (valuation-based, application fee 65% of the Building Permit Fee) is also required for the overall construction project the sprinkler system serves. If your project isn't listed, confirm with City of Rio Rancho Development Services — Building Inspection Division at (505) 891-5005 before starting work.

The plumbing trade-permit fee is $33.00 base + $33.00 per "Sprinkler System, Fire Protection" line item + $23.00 administrative fee. A separate Building Permit fee (65% application fee, based on project valuation) applies to the overall construction project. No separate Fire Marshal's Office plan-review fee was found published. Source: City of Rio Rancho Commercial Plumbing Permit application form.

Rio Rancho does not publish a plan-review timeline for this permit. Contact City of Rio Rancho Development Services — Building Inspection Division at (505) 891-5005 for current turnaround.

You'll need: Automatic Sprinkler System Checklist; Hydraulically-Calculated Sprinkler System Plans; Commercial Plumbing Permit Application; Commercial Building Permit & Plan Review Application. See the required-documents checklist on this page for details on each.

Rio Rancho requires 3 inspection(s) for an automatic fire sprinkler system permit, in order: Fire Marshal's Office Plan Review, Rough-In Inspection (Sprinkler Piping), Final / Acceptance Test. Schedule each through City of Rio Rancho Development Services — Building Inspection Division ((505) 891-5005).

Apply through City of Rio Rancho Development Services — Building Inspection Division at 3200 Civic Center Circle NE, Suite 130, Rio Rancho, NM 87144. Phone: (505) 891-5005, email: Permits@rrnm.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.rrnm.gov/77/Building-Division.

Rio Rancho, New Mexico has adopted: 2021 International Building Code (IBC) — with New Mexico state amendments; 2021 International Residential Code (IRC) — with New Mexico state amendments; 2021 Uniform Mechanical Code (UMC) — with New Mexico state amendments; 2021 Uniform Plumbing Code (UPC) — with New Mexico state amendments; 2020 National Electrical Code (NEC) — with New Mexico state amendments; 2021 International Energy Conservation Code (IECC); 2021 International Existing Building Code (IEBC) — with New Mexico state amendments; 2017 ICC/ANSI A117.1 Accessibility Code; 2021 International Fire Code (IFC); 2012 Swimming Pool, Spa, and Hot Tub Code; Current New Mexico Administrative Code (NMAC) Title 14 construction code chapters, as adopted and amended by the Construction Industries Division; City of Rio Rancho Code of Ordinances, Title XV Land Use: Chapter 151 (Building Regulations), Chapter 152 (Flood and Erosion Control), Chapter 153 (Storm Drainage Requirements), Chapter 154 (Planning and Zoning). Local amendments apply — see the Rio Rancho overview page for the full list.

Fire sprinkler plans go through the Fire Marshal's Office Plans Review Division (NFPA 13 Automatic Sprinkler System Checklist), and the trade work itself is permitted under the Commercial Plumbing Permit's "Sprinkler System, Fire Protection" fee line ($33.00 each), in addition to the Building Permit for the overall project. Source: Rio Rancho Fire Rescue Automatic Sprinkler System Checklist and Commercial Plumbing Permit application form.

Sources & verification

Verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rio Rancho building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.