EV Charging Station Permit (Electrical Permit) in Rio Rancho, New Mexico

Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE within the City of Rio Rancho, permitted as electrical work under the City's standard Electrical Permit Application. The City's itemized Electrical Permit fee schedule (the same detailed, KVA-tiered form this file's electrical-permit and solar-pv-permit entries cite) has no line item for EV chargers, EVSE, or vehicle charging stations — unlike solar PV, which gets its own dedicated tiered fee category.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for the new/upgraded circuit and EVSE connection, submitted on the City's standard Electrical Permit Application
  • Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System) as adopted by the City
  • A $23.00 Administrative Fee applies on all electrical permits regardless of category, per the Electrical Permit Application form
  • If a service upgrade is needed to support the charger, that scope is billed under the form's amperage-tiered Residential Service categories (e.g. $60-$398 depending on service size)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Base Permit Fee (electrical) — closest confirmed baseline for a category with no dedicated EV/EVSE lineElectrical Permit application form, City of Rio Rancho (rrnm.gov/DocumentCenter/View/76076) — this file's research found no dedicated EV charger/EVSE/vehicle-charging line item on the form's itemized fee list (which does separately itemize Residential Service by amperage, Pool/Spa, Evaporative Cooler/A/C/Sign/Temporary Power, Low Voltage systems, and Solar PV by KVA tier). The $33.00 Base Permit Fee plus the $23.00 Administrative Fee is the confirmed floor; the City may in practice classify a standalone EV charger circuit under the form's 'Evaporative Cooler / Refrigeration A/C / Combo HVAC Unit / Electric Sign / Temporary Power' miscellaneous-equipment-connection line ($33.00 each) by analogy, but this file did not find that categorization stated explicitly and does not assert it as confirmed.
$33.00
Administrative FeeElectrical Permit application form, City of Rio Rancho — applies to every electrical permit regardless of category
$23.00 on all permits

Review timeline

Plan review
Not published — contact the department

How long did your EV Charging Station Permit (Electrical Permit) permit actually take in Rio Rancho?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Final

    EVSE breaker sizing, GFCI protection (where applicable), working clearances, and charger mounting verified against NEC Article 625

See the full Rio Rancho inspection guide — scheduling & re-inspection fees →

Tips

  • Rio Rancho's itemized Electrical Permit fee schedule has no dedicated EV charger/EVSE line item, unlike solar PV which gets its own KVA-tiered category — confirm with the Building Division which existing line item will be used to bill a standalone EV charger circuit before applying.
  • The $23.00 Administrative Fee applies on top of whatever base category fee is charged, per the Electrical Permit Application form.
  • If the charger install requires a residential service upgrade, expect the amperage-tiered Residential Service fees ($60.00 at 100 Amp up to $398.00 over 400 Amp) documented in this file's electrical-permit entry to apply instead of a flat circuit fee.

Frequently asked questions

Rio Rancho requires an ev charging station permit (electrical permit) for: Electrical permit required for the new/upgraded circuit and EVSE connection, submitted on the City's standard Electrical Permit Application; Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System) as adopted by the City; A $23.00 Administrative Fee applies on all electrical permits regardless of category, per the Electrical Permit Application form; If a service upgrade is needed to support the charger, that scope is billed under the form's amperage-tiered Residential Service categories (e.g. $60-$398 depending on service size). If your project isn't listed, confirm with City of Rio Rancho Development Services — Building Inspection Division at (505) 891-5005 before starting work.

In Rio Rancho, the published Base Permit Fee (electrical) — closest confirmed baseline for a category with no dedicated EV/EVSE line is: $33.00. Additional published fees: Administrative Fee — $23.00 on all permits. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Rio Rancho does not publish a plan-review timeline for this permit. Contact City of Rio Rancho Development Services — Building Inspection Division at (505) 891-5005 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Rio Rancho requires 1 inspection(s) for an ev charging station permit (electrical permit), in order: Electrical Final. Schedule each through City of Rio Rancho Development Services — Building Inspection Division ((505) 891-5005).

Apply through City of Rio Rancho Development Services — Building Inspection Division at 3200 Civic Center Circle NE, Suite 130, Rio Rancho, NM 87144. Phone: (505) 891-5005, email: Permits@rrnm.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.rrnm.gov/77/Building-Division.

Rio Rancho, New Mexico has adopted: 2021 International Building Code (IBC) — with New Mexico state amendments; 2021 International Residential Code (IRC) — with New Mexico state amendments; 2021 Uniform Mechanical Code (UMC) — with New Mexico state amendments; 2021 Uniform Plumbing Code (UPC) — with New Mexico state amendments; 2020 National Electrical Code (NEC) — with New Mexico state amendments; 2021 International Energy Conservation Code (IECC); 2021 International Existing Building Code (IEBC) — with New Mexico state amendments; 2017 ICC/ANSI A117.1 Accessibility Code; 2021 International Fire Code (IFC); 2012 Swimming Pool, Spa, and Hot Tub Code; Current New Mexico Administrative Code (NMAC) Title 14 construction code chapters, as adopted and amended by the Construction Industries Division; City of Rio Rancho Code of Ordinances, Title XV Land Use: Chapter 151 (Building Regulations), Chapter 152 (Flood and Erosion Control), Chapter 153 (Storm Drainage Requirements), Chapter 154 (Planning and Zoning). Local amendments apply — see the Rio Rancho overview page for the full list.

Yes, an Electrical Permit through the City's standard Electrical Permit Application. The form has no dedicated EV charger/EVSE fee line item — the $33.00 Base Permit Fee plus $23.00 Administrative Fee is the confirmed floor; confirm with the Building Division exactly which category will apply to a standalone EV charger circuit.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rio Rancho building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.