Skip to main content
PermitBase

Edgewood building inspections

Inspection sequence, scheduling, and re-inspection fees for building permits in Edgewood, New Mexico.

Reviewed 2026-07-18 · Source

How to schedule

Inspections are requested through the building department below.

Address
171-A State Rd. 344, Edgewood, NM 87015-3610
Phone
(505) 286-4518
Office hours
Not published on the Town's Planning & Zoning page as of 2026-07-18 — call (505) 286-4518 to confirm current hours.

Inspection sequence

Applies to: Commercial Building Permit (State of NM Construction Industries Division — New Construction, Additions & Remodels/Tenant Improvements)

  1. 1

    Foundation Inspection

    After excavations for footings are complete and any required reinforcing steel is in place; for concrete foundations, required forms in place prior to inspection. All foundation materials must be on the job, except ready-mixed concrete per nationally recognized standards.

  2. 2

    Concrete Slab / Under-Floor Inspection

    After all in-slab or under-floor building service equipment, conduit, piping accessories, and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor.

  3. 3

    Frame Inspection

    After the roof, all framing, fire blocking, and bracing are in place and all pipes, chimneys, and vents are complete and the rough electrical, plumbing, and heating wires, pipes, and ducts are approved.

  4. 4

    Weather-Resistive Barrier Inspection

    After installation of the appropriate weather-resistive barrier and before such barrier is covered.

  5. 5

    Final Inspection

    After finish grading and the building is completed and ready for occupancy; final electrical, plumbing, and mechanical inspections must be conducted first. The CID Construction Inspector issues the Certificate of Occupancy to the contractor after approving the final general construction inspection. The prime contractor is responsible for coordinating all inspections; CID may also make or require other inspections ('Other Inspections') to ascertain code compliance. Inspection requests: CID.Inspection@state.nm.us, 505-222-9813, or 877-243-0979.

Applies to: State Building Permit (NM Construction Industries Division)

  1. 1

    Foundation Inspection

    After excavation for footings is complete and required reinforcing steel is in place; concrete forms must be in place before inspection.

  2. 2

    Concrete Slab / Under-Floor Inspection

    After in-slab or under-floor service equipment, conduit, and piping are in place, before concrete is placed or floor sheathing is installed.

  3. 3

    Frame Inspection

    After the roof, framing, fire blocking, and bracing are in place and the rough electrical, plumbing, and heating work is complete and approved.

  4. 4

    Weather-Resistive Barrier Inspection

    After installation of the weather-resistive barrier and before it is covered.

  5. 5

    Final Inspection

    After finish grading, with the building complete and ready for occupancy; final electrical, plumbing, and mechanical inspections must pass first. CID issues the Certificate of Occupancy after this inspection.

Applies to: Fire Sprinkler & Fire Alarm System Permit (Santa Fe County Fire Department — Fire Prevention/Risk Reduction Division)

  1. 1

    Rough-in Inspection (Sprinkler)

    Required before concealment of sprinkler piping; the SFCFD-stamped plan set must be on site or the inspection will not be performed.

  2. 2

    Final Inspection (Sprinkler)

    Installation company representative must be present; requires a signed Contractor's Material & Test Certificate for Above Ground Piping.

  3. 3

    Final Inspection (Fire Alarm / Alternative Suppression Systems)

    Installation company representative must be present; fire alarm final additionally requires a 'System of Record Completion' from the alarm company plus an emailed monitoring-service report.

Re-inspection fees

Electrical Permit (NM Construction Industries Division — Electrical Bureau)Reinspection Fee · CID Fees page, Electrical Bureau schedule, updated 2025-11-19.
$80
EV Charger / EVSE Permit (NM Construction Industries Division — Electrical Bureau)Reinspection Fee · CID Fees page, Electrical Bureau schedule, updated 2025-11-19
$80
Mechanical/Plumbing Permit (NM Construction Industries Division — Mechanical Plumbing Bureau)Each Re-Inspection (2nd re-inspection $120.00) · CID Fees page, Mechanical Plumbing Bureau schedule, updated 2025-11-19.
$80.00

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-18.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Edgewood building permits

Get alerts for Edgewood

We'll email you when Edgewood's fees, documents, or codes change — not often.