Skip to main content
PermitBase

Edgewood building permits

Department contacts, adopted codes, permit types, fees, and gotchas for Edgewood, New Mexico.

Last verified 2026-07-18 · Source · Embed this page’s badge · Version history

Building department

Address
171-A State Rd. 344, Edgewood, NM 87015-3610
Phone
(505) 286-4518
Office hours
Not published on the Town's Planning & Zoning page as of 2026-07-18 — call (505) 286-4518 to confirm current hours.

Inspection guide

See how inspections work in Edgewood — sequence, scheduling & re-inspection fees.

Codes adopted

New Mexico sets construction codes statewide by rule, not through home-rule discretion. Under the Construction Industries Licensing Act (NMSA 1978 §§ 60-13-1 et seq.), the state's Construction Industries Commission and Division (CID, within the Regulation & Licensing Department) adopt the technical construction codes codified at New Mexico Administrative Code (NMAC) Title 14 — including the state's own Building, Residential, Existing Building, Mechanical, Fuel Gas, Plumbing, Solar Energy, and Swimming Pool codes, and the National Electrical Code (14.10.4 NMAC currently adopts the 2020 NEC; the CID Commission periodically updates individual code chapters, so confirm the current edition with the applicable authority). Per NMSA 1978 § 60-13-44(E), these state codes "constitute a minimum requirement" binding every political subdivision in New Mexico — no city or county may adopt anything less stringent, though a jurisdiction may adopt stricter local amendments. Enforcement authority runs through whichever entity is the project's Authority Having Jurisdiction (AHJ, defined at NMAC 14.5.1.7.B): under NMSA 1978 § 60-13-41(D)-(F), a municipality or county that employs its own full-time certified building official may self-administer permitting, plan review, and inspection locally (Albuquerque, Santa Fe, Las Cruces, Rio Rancho, Farmington, and Roswell all operate this way); jurisdictions without a certified building official default to direct enforcement by a CID field office (e.g., Hobbs, Alamogordo). Some jurisdictions run a hybrid — locally certified for some trades while CID directly enforces others (Roswell's electrical permitting, for example, reverted to direct CID administration as of January 1, 2026). Always confirm with the specific jurisdiction whether it or the state CID is the acting AHJ for a given trade before submitting plans.

  • 2015 International Fire Code (IFC) — the only building-related code the Town of Edgewood's own Planning & Zoning page lists as directly 'adopted by Town of Edgewood' in its Quick Links (edgewood-nm.gov/planning-zoning).
  • Edgewood is NOT a New Mexico Construction Industries Division (CID) Local Enforcement Agency (LEA) — unlike Albuquerque, Santa Fe, Las Cruces, and Rio Rancho, it has no building department of its own, so all structural/trade codes are enforced directly by the state CID under the statewide New Mexico Administrative Code (NMAC) Title 14 baseline, not a town-adopted amendment set. Per NM RLD/CID's Rules, Laws and Building Codes page (current as of the 2025-11-19 fee-page update) and CID's October 2024 Building Permit Guide for Residential Construction, CID currently enforces: 2021 New Mexico Commercial Building Code (NMAC 14.7.2) / 2021 International Building Code; 2021 New Mexico Residential Building Code (NMAC 14.7.3) / 2021 International Residential Code; 2021 New Mexico Earthen Building Materials Construction Code, Phase III (NMAC 14.7.4); 2009 New Mexico Non-Load-Bearing Baled Straw Construction Building Code, Phase III (NMAC 14.7.5); 2021 New Mexico Residential Energy Conservation Code (NMAC 14.7.6, effective 7/30/2024); 2021 New Mexico Existing Building Code (NMAC 14.7.7); 2021 New Mexico Historic Earthen Buildings code (NMAC 14.7.8); 2021 New Mexico Commercial Energy Code (NMAC 14.7.9); 2021 New Mexico Plumbing Code (NMAC 14.8.2) / 2021 Uniform Plumbing Code (IAPMO); 2012 New Mexico Swimming Pool, Spa, and Hot Tub Code (NMAC 14.8.3); New Mexico Medical Gas Code (NMAC 14.8.4); 2021 New Mexico Mechanical Code (NMAC 14.9.2) / 2021 Uniform Mechanical Code (IAPMO); 2012 New Mexico Solar Energy Code (NMAC 14.9.6); 2017 ICC/ANSI A117.1 Accessibility Code; 2020 New Mexico Electrical Code (NMAC 14.10.4) / 2020 National Electrical Code; and 2012 New Mexico Electrical Safety Code (NMAC 14.10.5).

Permit types & fees

Tips & gotchas

  • Edgewood is a genuine two-tier permitting jurisdiction: the Town of Edgewood Planning & Zoning Official Administrator handles zoning/floodplain compliance (the Development Permit) FIRST, and the actual building/electrical/mechanical/plumbing permits are then issued by the STATE — the New Mexico Construction Industries Division (CID) — because Edgewood has never been designated a CID Local Enforcement Agency (LEA) the way Albuquerque, Santa Fe, Las Cruces, and Rio Rancho have. Do not confuse the Town's process with a full local building department.
  • The Town's own Development Permit review timeline IS published and verified: 10 working days for residential reviews, 3 weeks for commercial reviews (Zoning Ordinance 2024-017 §8.C). The subsequent CID State Building Permit has no published numeric turnaround anywhere — CID quotes fees and timing per project by phone.
  • Re-chased 2026-07-23: the Development Permit's $100.00 administrative fee is set by the 'DEVELOPMENT REVIEW' line of Resolution No. 2019-01 (Town of Edgewood Planning & Zoning Administrative Fee Schedule, adopted 01/09/2019) — this is the 'Governing body resolution' Zoning Ordinance 2024-017 §39 defers to, and it is confirmed still in force as of 2026-07-23 (a proposed 15%-increase replacement, Resolution 2026-xxO, was discussed at the Town Commission's Apr 14 and Apr 28, 2026 meetings but never adopted, and does not appear on the Jul 14, 2026 agenda). The Manufactured Home placement permit's own fee is NOT itemized separately in that same schedule and remains unconfirmed — call Planning & Zoning at (505) 286-4518.
  • CID's General Building Permit fee is valuation-based (NMAC 14.5.5.10) with no fixed public table; CID's Electrical Bureau and Mechanical Plumbing Bureau fees ARE itemized and published (e.g., a 100 Amp residential electrical service is $45; a water heater permit is $37.50 administrative fee + $4.00 per unit).
  • Development Permits/Development Review approvals in Edgewood are restricted to stick-built (IRC-compliant) buildings or RLD-approved manufactured/mobile homes — shipping containers, sheds, carports, trailers, semi-trailers, and RVs outside an approved RV park are categorically excluded, for both residential (§8.E) and commercial (§8.F) structures.
  • Manufactured Home placement is a genuinely separate Town permit from the general Development Permit (Zoning Ordinance 2024-017 §8.A), and is itself only the first of two steps — RLD's Manufactured Housing Division still issues a separate foundation permit afterward.
  • Santa Fe County's own Building and Development Services Division explicitly excludes 'the incorporated areas of the cities of Santa Fe, Edgewood, and Espanola' from its Sustainable Land Development Code and county-issued development permits — confirming the County plays no role in Edgewood's permitting despite this dataset's Santa Fe County grouping.
  • No CID office is named specifically for Edgewood; given the town's location split across Santa Fe, Bernalillo, and Sandoval Counties, either the Santa Fe office (505-476-4700) or the Albuquerque office (505-222-9800) may handle a given project — call ahead to confirm.

Related guides

Comparable nearby cities

Santa Fe
Both in Santa Fe County6 shared permit types~39 mi away
Compare fees →
Bernalillo
5 shared permit types~23 mi away
Compare fees →