State Building Permit (NM Construction Industries Division) in Edgewood, New Mexico

The actual building permit for new construction, additions, alterations, repairs, or demolition within the Town of Edgewood, issued by the New Mexico Regulation & Licensing Department's Construction Industries Division (CID) rather than by the Town, because Edgewood has not been designated a CID Local Enforcement Agency (LEA). Applicants must first obtain the Town's Development Permit zoning/flood-plain sign-off (see the development-permit entry above) before CID will accept the State Building Permit application.

Verified 2026-07-18 · Source

When you need this permit

  • Town of Edgewood zoning and flood-plain compliance sign-off (Development Permit) obtained BEFORE applying to CID, per Zoning Ordinance 2024-017 §8.A and CID's own Building Permit Guide ('You must obtain zoning approval and signature on the APPLICATION for STATE BUILDING PERMIT before applying to this office for the building permit')
  • Complete the APPLICATION for STATE BUILDING PERMIT, listing property owner, contractor (license number if applicable), architect (if applicable), project address, legal description, scope of work, and total square footage
  • Two complete sets of plans (minimum 1/4"=1'-0", on at least 11"x17" paper): Site Plan, Foundation Plan, Floor Plan, Floor & Roof Framing Plans, construction Details (wall sections, footing/foundation, energy-code compliance), and a total square footage breakdown (heated/garage/carport/porch/patio)
  • A signed contract between owner and contractor is required for project valuation; homeowner-permit applicants get their valuation calculated by CID from its own tables (NMAC 14.5.5.10)
  • Homeowners applying for a Homeowner Construction Permit must sign and notarize the Homeowner's Responsibilities Form; a homeowner permit cannot be used where a GB-2/GB-98 licensed contractor is acting as general contractor Contractor
  • A separate septic permit (from the NM Environment Department) is required if the project needs an individual liquid-waste system
  • Plans for steel-stud/structural-steel/steel-pipe construction, prefabricated/premanufactured/component structures, wood foundations, retaining walls over 4 feet, second-story additions, or alternate materials/methods must be prepared and sealed by a NM-registered architect or structural engineer

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

General Building Permit FeeCID Fees page (rld.nm.gov/construction-industries/forms-and-applications/fees/, updated 2025-11-19): 'Permitting Fees are based upon type of construction, square footage, type of materials and construction costs. The best method of obtaining permitting fees is to contact any of CID's three offices.' Project valuation is set under NMAC 14.5.5.10.
Valuation-based; contact a CID office for a project-specific quote

Review timeline

Plan review
Not published — contact the department

How long did your State Building Permit (NM Construction Industries Division) permit actually take in Edgewood?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation Inspection

    After excavation for footings is complete and required reinforcing steel is in place; concrete forms must be in place before inspection.

  2. 2

    Concrete Slab / Under-Floor Inspection

    After in-slab or under-floor service equipment, conduit, and piping are in place, before concrete is placed or floor sheathing is installed.

  3. 3

    Frame Inspection

    After the roof, framing, fire blocking, and bracing are in place and the rough electrical, plumbing, and heating work is complete and approved.

  4. 4

    Weather-Resistive Barrier Inspection

    After installation of the weather-resistive barrier and before it is covered.

  5. 5

    Final Inspection

    After finish grading, with the building complete and ready for occupancy; final electrical, plumbing, and mechanical inspections must pass first. CID issues the Certificate of Occupancy after this inspection.

See the full Edgewood inspection guide — scheduling & re-inspection fees →

Tips

  • CID calculates your project's valuation and fee for you if you apply in person; if mailing the application, call a CID office first to get the fee before mailing.
  • Two full sets of plans are required — hard-copy submittal is at least 11"x17" paper at 1/4"=1'-0" scale minimum; CID also offers an Electronic Plan Review (EPR) option.
  • A homeowner's permit cannot be used if a GB-2 or GB-98 licensed contractor is acting as general contractor on the project — that requires a standard contractor-held building permit. Contractor

Frequently asked questions

Edgewood requires a state building permit (nm construction industries division) for: Town of Edgewood zoning and flood-plain compliance sign-off (Development Permit) obtained BEFORE applying to CID, per Zoning Ordinance 2024-017 §8.A and CID's own Building Permit Guide ('You must obtain zoning approval and signature on the APPLICATION for STATE BUILDING PERMIT before applying to this office for the building permit'); Complete the APPLICATION for STATE BUILDING PERMIT, listing property owner, contractor (license number if applicable), architect (if applicable), project address, legal description, scope of work, and total square footage; Two complete sets of plans (minimum 1/4"=1'-0", on at least 11"x17" paper): Site Plan, Foundation Plan, Floor Plan, Floor & Roof Framing Plans, construction Details (wall sections, footing/foundation, energy-code compliance), and a total square footage breakdown (heated/garage/carport/porch/patio); A signed contract between owner and contractor is required for project valuation; homeowner-permit applicants get their valuation calculated by CID from its own tables (NMAC 14.5.5.10); Homeowners applying for a Homeowner Construction Permit must sign and notarize the Homeowner's Responsibilities Form; a homeowner permit cannot be used where a GB-2/GB-98 licensed contractor is acting as general contractor; A separate septic permit (from the NM Environment Department) is required if the project needs an individual liquid-waste system; Plans for steel-stud/structural-steel/steel-pipe construction, prefabricated/premanufactured/component structures, wood foundations, retaining walls over 4 feet, second-story additions, or alternate materials/methods must be prepared and sealed by a NM-registered architect or structural engineer. If your project isn't listed, confirm with Town of Edgewood Planning & Zoning Department (Community Development Division) at (505) 286-4518 before starting work.

CID does not publish a fixed fee table for general building permits — the fee is calculated from the project's construction valuation (NMAC 14.5.5.10) and covers plan review, the permit, and required inspections. Call a CID office for a project-specific quote before applying.

Edgewood does not publish a plan-review timeline for this permit. Contact Town of Edgewood Planning & Zoning Department (Community Development Division) at (505) 286-4518 for current turnaround.

You'll need: Application for State Building Permit (Multi Purpose State Building Application); Two sets of construction plans. Depending on your project, Edgewood may also ask for: Homeowner's Responsibilities Form. See the required-documents checklist on this page for details on each.

Edgewood requires 5 inspection(s) for a state building permit (nm construction industries division), in order: Foundation Inspection, Concrete Slab / Under-Floor Inspection, Frame Inspection, Weather-Resistive Barrier Inspection, Final Inspection. Schedule each through Town of Edgewood Planning & Zoning Department (Community Development Division) ((505) 286-4518).

Apply through Town of Edgewood Planning & Zoning Department (Community Development Division) at 171-A State Rd. 344, Edgewood, NM 87015-3610. Phone: (505) 286-4518, email: codeenforcement@edgewood-nm.gov (Code Enforcement complaints only — Planning & Zoning has no separately published email as of 2026-07-18; the Town site routes contact through a web form). Call (505) 286-4518 for permit questions.. Office hours: Not published on the Town's Planning & Zoning page as of 2026-07-18 — call (505) 286-4518 to confirm current hours.. Official information: https://www.edgewood-nm.gov/planning-zoning.

Edgewood, New Mexico has adopted: 2015 International Fire Code (IFC) — the only building-related code the Town of Edgewood's own Planning & Zoning page lists as directly 'adopted by Town of Edgewood' in its Quick Links (edgewood-nm.gov/planning-zoning).; Edgewood is NOT a New Mexico Construction Industries Division (CID) Local Enforcement Agency (LEA) — unlike Albuquerque, Santa Fe, Las Cruces, and Rio Rancho, it has no building department of its own, so all structural/trade codes are enforced directly by the state CID under the statewide New Mexico Administrative Code (NMAC) Title 14 baseline, not a town-adopted amendment set. Per NM RLD/CID's Rules, Laws and Building Codes page (current as of the 2025-11-19 fee-page update) and CID's October 2024 Building Permit Guide for Residential Construction, CID currently enforces: 2021 New Mexico Commercial Building Code (NMAC 14.7.2) / 2021 International Building Code; 2021 New Mexico Residential Building Code (NMAC 14.7.3) / 2021 International Residential Code; 2021 New Mexico Earthen Building Materials Construction Code, Phase III (NMAC 14.7.4); 2009 New Mexico Non-Load-Bearing Baled Straw Construction Building Code, Phase III (NMAC 14.7.5); 2021 New Mexico Residential Energy Conservation Code (NMAC 14.7.6, effective 7/30/2024); 2021 New Mexico Existing Building Code (NMAC 14.7.7); 2021 New Mexico Historic Earthen Buildings code (NMAC 14.7.8); 2021 New Mexico Commercial Energy Code (NMAC 14.7.9); 2021 New Mexico Plumbing Code (NMAC 14.8.2) / 2021 Uniform Plumbing Code (IAPMO); 2012 New Mexico Swimming Pool, Spa, and Hot Tub Code (NMAC 14.8.3); New Mexico Medical Gas Code (NMAC 14.8.4); 2021 New Mexico Mechanical Code (NMAC 14.9.2) / 2021 Uniform Mechanical Code (IAPMO); 2012 New Mexico Solar Energy Code (NMAC 14.9.6); 2017 ICC/ANSI A117.1 Accessibility Code; 2020 New Mexico Electrical Code (NMAC 14.10.4) / 2020 National Electrical Code; and 2012 New Mexico Electrical Safety Code (NMAC 14.10.5).. Local amendments apply — see the Edgewood overview page for the full list.

CID has three offices statewide (Santa Fe, Albuquerque, Las Cruces) and no single office is named specifically for Edgewood on CID's own materials. Given Edgewood's location split across Santa Fe, Bernalillo, and Sandoval Counties, contact the Santa Fe office (2550 Cerrillos Rd, Santa Fe, NM 87505, (505) 476-4700) or the Albuquerque office (5500 San Antonio Dr NE Suite F, Albuquerque, NM 87109, (505) 222-9800) to confirm which is currently handling your project's county.

Sources & verification

Verified against official sources. Last reviewed 2026-07-18.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.