Sign Permit (Town of Edgewood Sign Ordinance 2009-02) — Edgewood, New Mexico · Requirements sheet
Verified 2026-07-22 · Source: https://www.edgewood-nm.gov/media/5921
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit (Town of Edgewood Sign Ordinance 2009-02) in Edgewood, New Mexico
Required by the Town of Edgewood's Community Planning & Development Office (the same office administers Planning & Zoning) before any permanent sign is erected, placed, displayed, altered, or relocated within Town limits, under Sign Ordinance No. 2009-02 (which superseded Ordinance No. 2004-005). The Ordinance sets permitted sign types/sizes/heights by zone, exempts most temporary signs from permitting, and prohibits any sign not specifically authorized.
Verified 2026-07-22 · Source
When you need this permit
- A sign permit is required before any person erects, places, displays, alters, or relocates a sign for which a permit is required (Sign Ordinance 2009-02 §6.B.1); all signs not specifically permitted or excepted by the Ordinance are prohibited (§2.A)
- Application must be submitted to the Community Planning & Development Office on the Town's prescribed form, accompanied by the written consent of the property owner, lessee, agent, or trustee (§6.B.2.a)
- Submittal must include scaled drawings with sign dimensions/location, sign copy, construction specifications (including electrical components/wiring if illuminated), and the foundation/posthole location relative to the property line and right-of-way (§6.B.2.b)
- Zone-specific size/height limits apply: detached single-family dwellings/duplexes are limited to one 6-sq-ft unlit wall sign (or 6 sq ft/3 ft tall if detached); the Commercial Overlay Zone (Zone 1) allows two freestanding signs (one pylon sign up to 58 ft tall/120 sq ft, one freestanding sign up to 36 ft tall/140 sq ft); all other commercial zones generally limit freestanding signs to 140 sq ft per face and 36 ft in height (§4)
- Most temporary signs (real estate, political/campaign, banners, window signs) do NOT require a permit, but off-premise development signs and on-premise development identification signs DO require a temporary permit from the Planning Office (§4.F)
- Political/campaign signs are exempt from permitting but capped at 8 sq ft in residential zones and 64 sq ft (commercial zones, max 8 ft freestanding height), must be removed by the Monday following the election, and may not be placed within 150 feet of an official voting station (§2.B.7)
- Signs must comply with illumination rules (all illuminated signs extinguished by 11:00 PM or when the use/activity closes, whichever is later) and sign-placement/sight-triangle rules at intersections (§3)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Edgewood inspection guide — scheduling & re-inspection fees →
Tips
- Most temporary signage (real estate signs, political signs, window signs, banners tied to a Town-recognized event) does NOT need a permit at all — the Ordinance only requires temporary permits for off-premise/on-premise development identification signs.
- The $25 flat permit fee applies per sign, not per application — a project with multiple signs (e.g., a multi-tenant Comprehensive Sign Program) pays $25 for each individual sign.
- A written appeal of a Comprehensive Sign Program review must reach the Planning & Zoning Office at least 16 days before the next regularly scheduled Planning & Zoning Commission meeting (§4.E.2.a.iii).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Edgewood
Sign Permit (Town of Edgewood Sign Ordinance 2009-02) in other cities
Compare sign permit (town of edgewood sign ordinance 2009-02) fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Edgewood project checklist
Describe your project once and get every permit, document, and fee it triggers in Edgewood — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →