Skip to main content
PermitBase

Electrical Permit (NM Construction Industries Division — Electrical Bureau) in Edgewood, New Mexico

Required for electrical service, panel, or wiring installation, change, or repair within the Town of Edgewood, issued by CID's Electrical Bureau (the state agency, since Edgewood has no local electrical inspection program). Fees are itemized by service/panel amperage.

Verified 2026-07-18 · Source

When you need this permit

  • Installation, change, or repair of any electrical service, panel, or wiring system within Edgewood town limits
  • Town of Edgewood Development Permit zoning sign-off may be required first if the electrical work is part of new construction or an addition (Zoning Ordinance 2024-017 §8.A)
  • Homeowners may not perform electrical work themselves unless they apply for and pass the required CID exam for that work

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential service, 100 Amp and belowCID Fees page (rld.nm.gov/construction-industries/forms-and-applications/fees/), Electrical Bureau schedule, updated 2025-11-19.
$45
Residential service, over 100 Amp thru 200 AmpCID Fees page, Electrical Bureau schedule, updated 2025-11-19.
$72
Residential service, over 200 Amp thru 320 AmpCID Fees page, Electrical Bureau schedule, updated 2025-11-19.
$99
Residential service, over 320 Amp thru 400 AmpCID Fees page, Electrical Bureau schedule, updated 2025-11-19.
$225
Residential service, over 400 AmpCID Fees page, Electrical Bureau schedule, updated 2025-11-19.
$360
Temporary Power PoleCID Fees page, Electrical Bureau schedule, updated 2025-11-19.
$27
Mobile Home ServiceCID Fees page, Electrical Bureau schedule, updated 2025-11-19.
$27
Reinspection FeeCID Fees page, Electrical Bureau schedule, updated 2025-11-19.
$80
Minimum Inspection Fee for Items not ListedCID Fees page, Electrical Bureau schedule, updated 2025-11-19.
$27

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit (NM Construction Industries Division — Electrical Bureau) permit actually take in Edgewood?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Edgewood inspection guide — scheduling & re-inspection fees →

    Tips

    • CID's published guide does not break out a separate rough-in/final inspection sequence specifically for stand-alone electrical permits the way it does for general building permits — confirm the required inspection sequence for your specific scope of work with the CID Electrical Bureau.
    • A double fee is charged for electrical work started before a permit is secured, per CID's general permitting rules (NMAC 14.5.2).

    Frequently asked questions

    Edgewood requires an electrical permit (nm construction industries division — electrical bureau) for: Installation, change, or repair of any electrical service, panel, or wiring system within Edgewood town limits; Town of Edgewood Development Permit zoning sign-off may be required first if the electrical work is part of new construction or an addition (Zoning Ordinance 2024-017 §8.A); Homeowners may not perform electrical work themselves unless they apply for and pass the required CID exam for that work. If your project isn't listed, confirm with Town of Edgewood Planning & Zoning Department (Community Development Division) at (505) 286-4518 before starting work.

    $72, per CID's statewide Electrical Bureau fee schedule (over 100 Amp thru 200 Amp). Source: NM Construction Industries Division Fees page, updated 2025-11-19.

    Edgewood does not publish a plan-review timeline for this permit. Contact Town of Edgewood Planning & Zoning Department (Community Development Division) at (505) 286-4518 for current turnaround.

    You'll need: Electrical Permit Application (CID Electrical Bureau). See the required-documents checklist on this page for details on each.

    Apply through Town of Edgewood Planning & Zoning Department (Community Development Division) at 171-A State Rd. 344, Edgewood, NM 87015-3610. Phone: (505) 286-4518, email: codeenforcement@edgewood-nm.gov (Code Enforcement complaints only — Planning & Zoning has no separately published email as of 2026-07-18; the Town site routes contact through a web form). Call (505) 286-4518 for permit questions.. Office hours: Not published on the Town's Planning & Zoning page as of 2026-07-18 — call (505) 286-4518 to confirm current hours.. Official information: https://www.edgewood-nm.gov/planning-zoning.

    Edgewood, New Mexico has adopted: 2015 International Fire Code (IFC) — the only building-related code the Town of Edgewood's own Planning & Zoning page lists as directly 'adopted by Town of Edgewood' in its Quick Links (edgewood-nm.gov/planning-zoning).; Edgewood is NOT a New Mexico Construction Industries Division (CID) Local Enforcement Agency (LEA) — unlike Albuquerque, Santa Fe, Las Cruces, and Rio Rancho, it has no building department of its own, so all structural/trade codes are enforced directly by the state CID under the statewide New Mexico Administrative Code (NMAC) Title 14 baseline, not a town-adopted amendment set. Per NM RLD/CID's Rules, Laws and Building Codes page (current as of the 2025-11-19 fee-page update) and CID's October 2024 Building Permit Guide for Residential Construction, CID currently enforces: 2021 New Mexico Commercial Building Code (NMAC 14.7.2) / 2021 International Building Code; 2021 New Mexico Residential Building Code (NMAC 14.7.3) / 2021 International Residential Code; 2021 New Mexico Earthen Building Materials Construction Code, Phase III (NMAC 14.7.4); 2009 New Mexico Non-Load-Bearing Baled Straw Construction Building Code, Phase III (NMAC 14.7.5); 2021 New Mexico Residential Energy Conservation Code (NMAC 14.7.6, effective 7/30/2024); 2021 New Mexico Existing Building Code (NMAC 14.7.7); 2021 New Mexico Historic Earthen Buildings code (NMAC 14.7.8); 2021 New Mexico Commercial Energy Code (NMAC 14.7.9); 2021 New Mexico Plumbing Code (NMAC 14.8.2) / 2021 Uniform Plumbing Code (IAPMO); 2012 New Mexico Swimming Pool, Spa, and Hot Tub Code (NMAC 14.8.3); New Mexico Medical Gas Code (NMAC 14.8.4); 2021 New Mexico Mechanical Code (NMAC 14.9.2) / 2021 Uniform Mechanical Code (IAPMO); 2012 New Mexico Solar Energy Code (NMAC 14.9.6); 2017 ICC/ANSI A117.1 Accessibility Code; 2020 New Mexico Electrical Code (NMAC 14.10.4) / 2020 National Electrical Code; and 2012 New Mexico Electrical Safety Code (NMAC 14.10.5).. Local amendments apply — see the Edgewood overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-18.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.