Skip to main content
PermitBase

Manufactured Home Placement Permit in Edgewood, New Mexico

Required from the Town of Edgewood Planning & Zoning Official Administrator before a Manufactured Home may be installed within Town limits, and BEFORE the applicant applies to the Manufactured Housing Division of the NM Regulation & Licensing Department (RLD) for the foundation permit.

Reviewed 2026-07-18 · Source

When you need this permit

  • Manufactured Home placement permit obtained from the Town's Planning & Zoning Official Administrator BEFORE applying to RLD's Manufactured Housing Division for a foundation permit (Zoning Ordinance 2024-017 §8.A)
  • Manufactured Homes may not be installed less than 20 feet from any other Dwelling Unit, regardless of the underlying zone's setback rules (§7.D)
  • Manufactured Homes are limited to residential use only
  • Prior to occupancy: must be connected to utilities, skirted with a durable material, and stabilized/anchored per the Manufactured Housing Act and its regulations (§7.D)
  • Must be installed on a Permanent Foundation as defined by the Manufactured Housing Act, NMSA 1978 (§7.E)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Administrative FeeSame fee-schedule gap as the Development Permit — Zoning Ordinance 2024-017 §39 defers the dollar amount to a Governing Body fee resolution not posted in the Town's online Document Library as of 2026-07-18. Confirm with Planning & Zoning at (505) 286-4518. Re-chased 2026-07-23: located the Town's current live Planning & Zoning fee schedule, Resolution No. 2019-01 (adopted 01/09/2019; confirmed still in effect — a proposed 2026 replacement, 'Resolution 2026-xxO Planning & Zoning Fee Schedule,' was discussed at the Apr 14, 2026 Town Commission meeting (postponed 5-0) and the Apr 28, 2026 meeting ('NO ACTION WAS TAKEN') but was never adopted through at least the Town's Jul 14, 2026 regular meeting agenda — see the development-permit entry for the full chase). That resolution's Schedule of Fees itemizes a generic 'DEVELOPMENT REVIEW — $100.00' line covering the same §8 Town review/sign-off that Zoning Ordinance 2024-017 §8.A explicitly subjects Manufactured Home installation to, but it has no Manufactured-Home-specific line item of its own — so whether $100.00 or some other amount actually applies to this particular permit remains genuinely unconfirmed. Call Planning & Zoning at (505) 286-4518 to confirm.
Not published online

Review timeline

Plan review
Not published — contact the department

How long did your Manufactured Home Placement Permit permit actually take in Edgewood?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Edgewood inspection guide — scheduling & re-inspection fees →

    Tips

    • This Town permit is only the first step — after Planning & Zoning sign-off, you must separately apply to RLD's Manufactured Housing Division, (505) 476-9870, for the foundation permit before the home can be installed.
    • Manufactured Homes must sit at least 20 feet from any other dwelling unit in Edgewood, a stricter rule than the underlying zone's general setback.
    • Re-chased 2026-07-23: the Town's current fee resolution (No. 2019-01) has a generic $100.00 'Development Review' fee that likely also covers Manufactured Home placement review under §8.A, but the resolution does not name a Manufactured-Home-specific fee — confirm the exact amount by phone before applying.

    Frequently asked questions

    Edgewood requires a manufactured home placement permit for: Manufactured Home placement permit obtained from the Town's Planning & Zoning Official Administrator BEFORE applying to RLD's Manufactured Housing Division for a foundation permit (Zoning Ordinance 2024-017 §8.A); Manufactured Homes may not be installed less than 20 feet from any other Dwelling Unit, regardless of the underlying zone's setback rules (§7.D); Manufactured Homes are limited to residential use only; Prior to occupancy: must be connected to utilities, skirted with a durable material, and stabilized/anchored per the Manufactured Housing Act and its regulations (§7.D); Must be installed on a Permanent Foundation as defined by the Manufactured Housing Act, NMSA 1978 (§7.E). If your project isn't listed, confirm with Town of Edgewood Planning & Zoning Department (Community Development Division) at (505) 286-4518 before starting work.

    In Edgewood, the published Administrative Fee is: Not published online. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Edgewood does not publish a plan-review timeline for this permit. Contact Town of Edgewood Planning & Zoning Department (Community Development Division) at (505) 286-4518 for current turnaround.

    You'll need: Manufactured Home Placement Permit Application. See the required-documents checklist on this page for details on each.

    Apply through Town of Edgewood Planning & Zoning Department (Community Development Division) at 171-A State Rd. 344, Edgewood, NM 87015-3610. Phone: (505) 286-4518, email: codeenforcement@edgewood-nm.gov (Code Enforcement complaints only — Planning & Zoning has no separately published email as of 2026-07-18; the Town site routes contact through a web form). Call (505) 286-4518 for permit questions.. Office hours: Not published on the Town's Planning & Zoning page as of 2026-07-18 — call (505) 286-4518 to confirm current hours.. Official information: https://www.edgewood-nm.gov/planning-zoning.

    Edgewood, New Mexico has adopted: 2015 International Fire Code (IFC) — the only building-related code the Town of Edgewood's own Planning & Zoning page lists as directly 'adopted by Town of Edgewood' in its Quick Links (edgewood-nm.gov/planning-zoning).; Edgewood is NOT a New Mexico Construction Industries Division (CID) Local Enforcement Agency (LEA) — unlike Albuquerque, Santa Fe, Las Cruces, and Rio Rancho, it has no building department of its own, so all structural/trade codes are enforced directly by the state CID under the statewide New Mexico Administrative Code (NMAC) Title 14 baseline, not a town-adopted amendment set. Per NM RLD/CID's Rules, Laws and Building Codes page (current as of the 2025-11-19 fee-page update) and CID's October 2024 Building Permit Guide for Residential Construction, CID currently enforces: 2021 New Mexico Commercial Building Code (NMAC 14.7.2) / 2021 International Building Code; 2021 New Mexico Residential Building Code (NMAC 14.7.3) / 2021 International Residential Code; 2021 New Mexico Earthen Building Materials Construction Code, Phase III (NMAC 14.7.4); 2009 New Mexico Non-Load-Bearing Baled Straw Construction Building Code, Phase III (NMAC 14.7.5); 2021 New Mexico Residential Energy Conservation Code (NMAC 14.7.6, effective 7/30/2024); 2021 New Mexico Existing Building Code (NMAC 14.7.7); 2021 New Mexico Historic Earthen Buildings code (NMAC 14.7.8); 2021 New Mexico Commercial Energy Code (NMAC 14.7.9); 2021 New Mexico Plumbing Code (NMAC 14.8.2) / 2021 Uniform Plumbing Code (IAPMO); 2012 New Mexico Swimming Pool, Spa, and Hot Tub Code (NMAC 14.8.3); New Mexico Medical Gas Code (NMAC 14.8.4); 2021 New Mexico Mechanical Code (NMAC 14.9.2) / 2021 Uniform Mechanical Code (IAPMO); 2012 New Mexico Solar Energy Code (NMAC 14.9.6); 2017 ICC/ANSI A117.1 Accessibility Code; 2020 New Mexico Electrical Code (NMAC 14.10.4) / 2020 National Electrical Code; and 2012 New Mexico Electrical Safety Code (NMAC 14.10.5).. Local amendments apply — see the Edgewood overview page for the full list.

    No. Zoning Ordinance 2024-017 §8.A requires a Manufactured Home placement permit from the Town of Edgewood Planning & Zoning Official Administrator before you may apply to RLD's Manufactured Housing Division for the state foundation permit.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-07-18.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.