Residential Solar Photovoltaic (PV) Permit (NM Construction Industries Division — Electrical Bureau) — Edgewood, New Mexico · Requirements sheet
Verified 2026-07-20 · Source: https://www.rld.nm.gov/construction-industries/forms-and-applications/fees/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Solar Photovoltaic (PV) Permit (NM Construction Industries Division — Electrical Bureau) in Edgewood, New Mexico
Rooftop or ground-mount residential solar PV installation within the Town of Edgewood is regulated by the state Construction Industries Division (CID), the same agency that issues the electrical permit for Edgewood addresses (Edgewood has no local electrical inspection program). CID's electrical classification rules (14.6.6 NMAC) require anyone bidding or contracting a solar PV electric system installation to hold an EE-98, EL-1, or ER-1 license classification (or, for structural modifications to the mounting/racking, a GB-2 residential or GB-98 general building classification); CID's published Electrical Bureau fee schedule does not itemize a solar/PV-specific line, so the applicable inspection fee is billed under the Electrical Bureau's general schedule (e.g., the applicable service-amperage tier if a new/upgraded service is involved, or the 'Minimum Inspection Fee for Items not Listed' if not).
Verified 2026-07-20 · Source
When you need this permit
- Contractor bidding/installing the solar PV electric system must hold a valid CID EE-98, EL-1, or ER-1 license classification (14.6.6 NMAC, Electrical Classifications, PV-specific scope)
- Installer performing the physical PV electrical work must hold a valid CID journeyman certificate (EE-98J, EL-1J, or ER-1J) or be a certified apprentice working under direct journeyman supervision
- If the installation requires structural modifications to the roof or mounting structure, that work must be performed under a GB-2 (residential) or GB-98 (general) building license classification, filed as (or alongside) a General Building Permit
- Work on the PV system's support structures, racking, and panel mounting must stay within the scope of the license classification and preserve the manufacturer's original listing and labeling
- Town of Edgewood Development Permit zoning sign-off may be required first if the PV installation is part of new construction or a structural addition (Zoning Ordinance 2024-017 Section 8.A)
- Governed by the 2012 New Mexico Solar Energy Code (NMAC 14.9.6) alongside the 2020 New Mexico Electrical Code (NMAC 14.10.4) / 2020 NEC as statewide-adopted
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical inspection (CID Electrical Bureau)
Interconnection, disconnect placement, and wiring verified per the 2020 NEC and the Solar Energy Code (14.9.6 NMAC)
See the full Edgewood inspection guide — scheduling & re-inspection fees →
Tips
- There is no separate 'solar permit' fee line published by CID — a PV installation is billed under the Electrical Bureau's general fee schedule (service-amperage tier if applicable, otherwise the $27 minimum/not-listed fee), the same office and schedule as the state-electrical-permit entry for Edgewood.
- If your PV installation requires structural roof/mounting modifications, that scope needs a separate General Building Permit filed under a GB-2 (residential) or GB-98 (general) contractor license, valuation-based rather than flat-fee. Contractor
- Confirm which CID office (Santa Fe, Albuquerque, or Las Cruces) is currently handling Edgewood-area projects before applying — none is designated specifically for the town.
- Re-chased 2026-07-20: the New Mexico Construction Industries Division's own published Electrical Bureau fee schedule (rld.nm.gov, updated 2025-11-19) contains real, citable dollar figures (e.g. $27 minimum inspection fee; $45-$360 service-amperage tiers) that govern a solar PV installation's electrical component, since Edgewood has no local electrical inspection program and defers entirely to the state CID. Upgraded to verified on that basis.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Edgewood
Residential Solar Photovoltaic (PV) Permit (NM Construction Industries Division — Electrical Bureau) in other cities