Fire Sprinkler & Fire Alarm System Permit (Santa Fe County Fire Department — Fire Prevention/Risk Reduction Division) — Edgewood, New Mexico · Requirements sheet
Verified 2026-07-22 · Source: https://www.santafecountynm.gov/fire/fire-preventionrisk-reduction/fire-protection-systems--submittal--inspection-guidelines
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Fire Sprinkler & Fire Alarm System Permit (Santa Fe County Fire Department — Fire Prevention/Risk Reduction Division) in Edgewood, New Mexico
Installation, modification, or repair of a fire sprinkler system or a fire alarm/detection system within a building in the Town of Edgewood is regulated by the Santa Fe County Fire Department (SFCFD) Fire Prevention/Risk Reduction Division rather than by the Town, because Edgewood has no fire marshal or fire-code enforcement office of its own. SFCFD's own website states it 'protects approximately 1900 square miles of unincorporated area as well as the incorporated Town of Edgewood.' The Town's Planning & Zoning page lists the 2015 International Fire Code as the only building-related code directly adopted by the Town (see this file's codesAdopted); SFCFD's Fire Prevention/Risk Reduction Division is the office that actually administers plan review, permitting, and inspection for fire protection systems under that code for the Edgewood area, the same way CID stands in for a missing Town building department for other construction permits.
Verified 2026-07-22 · Source
When you need this permit
- Three full-size sets of plans required for review, for both sprinkler systems (residential or commercial) and fire alarm/detection systems, plus cut sheets for all components/devices/appurtenances (SFCFD Fire Protection Systems Submittal & Inspection Guidelines)
- Commercial sprinkler plans additionally require hydraulic calculations and a design-area notation; fire alarm plans additionally require voltage-drop calculations, battery details/calculations, and a system inputs-and-outputs matrix
- Plans must be stamped by a NICET Level III or IV technician AND a New Mexico-certified engineer or NM-certified Fire Protection Engineer (alternative fire suppression systems may instead be stamped by NICET III/IV or a NM Certified Fire Protection Engineer alone)
- Full payment is required before plans are accepted for review — accepted forms are Visa, MasterCard, Discover, check, money order, or cashier's check; cash is not accepted
- The SFCFD-stamped set of plans must be present on site at every inspection, or the inspection will not be performed
- Sprinkler systems require both a rough-in inspection and a final inspection; fire alarm and alternative suppression systems require a final inspection only
- Both the fire alarm and sprinkler final inspections must be completed before a Certificate of Occupancy is released
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-in Inspection (Sprinkler)
Required before concealment of sprinkler piping; the SFCFD-stamped plan set must be on site or the inspection will not be performed.
- 2
Final Inspection (Sprinkler)
Installation company representative must be present; requires a signed Contractor's Material & Test Certificate for Above Ground Piping.
- 3
Final Inspection (Fire Alarm / Alternative Suppression Systems)
Installation company representative must be present; fire alarm final additionally requires a 'System of Record Completion' from the alarm company plus an emailed monitoring-service report.
See the full Edgewood inspection guide — scheduling & re-inspection fees →
Tips
- There is no combined sprinkler-plus-alarm fee line — a project installing both systems is billed separately under each schedule (e.g., $75 residential sprinkler + $150 commercial fire alarm).
- Bring the SFCFD-stamped set of plans to every inspection — SFCFD will not perform an inspection without them on site.
- Only Visa/MasterCard/Discover, check, money order, or cashier's check are accepted for plan review fees; SFCFD does not accept cash.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Edgewood
Fire Sprinkler & Fire Alarm System Permit (Santa Fe County Fire Department — Fire Prevention/Risk Reduction Division) in other cities
Look up this fee in a different city →
Now live
Build your Edgewood project checklist
Describe your project once and get every permit, document, and fee it triggers in Edgewood — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →