EV Charger / EVSE Permit (NM Construction Industries Division — Electrical Bureau) in Edgewood, New Mexico

Installation of a Level 2 (or higher) electric vehicle charger/EVSE within the Town of Edgewood is regulated by the state Construction Industries Division (CID), the same agency that issues the electrical permit for Edgewood addresses (Edgewood has no local electrical inspection program). CID's published statewide Electrical Bureau fee schedule has NO dedicated EV-charger, EVSE, or electric-vehicle line item; a charger circuit is billed under the Electrical Bureau's general schedule — the applicable service-amperage tier if a new/upgraded service is involved, or the 'Minimum Inspection Fee for Items not Listed' ($27) if the work is limited to an added circuit on an existing service. Governed by the 2020 New Mexico Electrical Code (NMAC 14.10.4) / 2020 NEC Article 625 (Electric Vehicle Power Transfer System) as statewide-adopted.

Verified 2026-07-20 · Source

When you need this permit

  • Contractor performing the EV charger circuit installation must hold a valid CID electrical license classification (e.g., EE-98, EL-1, or ER-1) per 14.6.6 NMAC
  • Electrical Permit Application (CID Electrical Bureau) filed for the charger circuit's electrical scope; no separate EV-charger-specific CID form was found published as of this research pass
  • Town of Edgewood Development Permit zoning sign-off may be required first if the charger installation is part of new construction or a structural addition (Zoning Ordinance 2024-017 Section 8.A)
  • If a new/upgraded electrical service is required to support the charger, the applicable service-amperage tier fee and permit apply in addition to (or instead of) the general circuit fee

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Minimum Inspection Fee for Items not ListedCID Fees page (rld.nm.gov/construction-industries/forms-and-applications/fees/), Electrical Bureau schedule, updated 2025-11-19. No EV-charger-specific line item is published in CID's Electrical Bureau fee schedule; this is the closest published catch-all line for a circuit-addition electrical scope with no itemized fee of its own.
$27
Residential service, 100 Amp and below (if new/upgraded service required)Applies instead of the catch-all fee only if the charger install requires a new or upgraded electrical service; CID Fees page, Electrical Bureau schedule
$45
Reinspection FeeCID Fees page, Electrical Bureau schedule, updated 2025-11-19
$80

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit (NM Construction Industries Division — Electrical Bureau) permit actually take in Edgewood?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical inspection (CID Electrical Bureau)

    Charger circuit wiring, breaker sizing, and GFCI/disconnect verified per the 2020 NEC Article 625

See the full Edgewood inspection guide — scheduling & re-inspection fees →

Tips

  • There is no separate 'EV charger permit' fee line published by CID — a charger circuit is billed under the Electrical Bureau's general fee schedule (service-amperage tier if a new/upgraded service is needed, otherwise the $27 minimum/not-listed fee), the same office and schedule used for other electrical work in Edgewood.
  • Confirm which CID office (Santa Fe, Albuquerque, or Las Cruces) is currently handling Edgewood-area projects before applying — none is designated specifically for the town.
  • This mirrors Edgewood's own solar-pv-permit entry: CID's Electrical Bureau schedule has no dedicated line item for either solar PV or EV chargers, and both fall back to the same general/minimum-fee mechanism.

Frequently asked questions

Edgewood requires an ev charger / evse permit (nm construction industries division — electrical bureau) for: Contractor performing the EV charger circuit installation must hold a valid CID electrical license classification (e.g., EE-98, EL-1, or ER-1) per 14.6.6 NMAC; Electrical Permit Application (CID Electrical Bureau) filed for the charger circuit's electrical scope; no separate EV-charger-specific CID form was found published as of this research pass; Town of Edgewood Development Permit zoning sign-off may be required first if the charger installation is part of new construction or a structural addition (Zoning Ordinance 2024-017 Section 8.A); If a new/upgraded electrical service is required to support the charger, the applicable service-amperage tier fee and permit apply in addition to (or instead of) the general circuit fee. If your project isn't listed, confirm with Town of Edgewood Planning & Zoning Department (Community Development Division) at (505) 286-4518 before starting work.

CID does not publish an EV-charger-specific fee line. The charger circuit's electrical scope is billed under the Electrical Bureau's general fee schedule — the applicable service-amperage tier if a new/upgraded electrical service is involved, or the $27 minimum inspection fee for items not otherwise listed. Source: NM Construction Industries Division Fees page, updated 2025-11-19.

Edgewood does not publish a plan-review timeline for this permit. Contact Town of Edgewood Planning & Zoning Department (Community Development Division) at (505) 286-4518 for current turnaround.

You'll need: Electrical Permit Application (CID Electrical Bureau). See the required-documents checklist on this page for details on each.

Edgewood requires 1 inspection(s) for an ev charger / evse permit (nm construction industries division — electrical bureau), in order: Electrical inspection (CID Electrical Bureau). Schedule each through Town of Edgewood Planning & Zoning Department (Community Development Division) ((505) 286-4518).

Apply through Town of Edgewood Planning & Zoning Department (Community Development Division) at 171-A State Rd. 344, Edgewood, NM 87015-3610. Phone: (505) 286-4518, email: codeenforcement@edgewood-nm.gov (Code Enforcement complaints only — Planning & Zoning has no separately published email as of 2026-07-18; the Town site routes contact through a web form). Call (505) 286-4518 for permit questions.. Office hours: Not published on the Town's Planning & Zoning page as of 2026-07-18 — call (505) 286-4518 to confirm current hours.. Official information: https://www.edgewood-nm.gov/planning-zoning.

Edgewood, New Mexico has adopted: 2015 International Fire Code (IFC) — the only building-related code the Town of Edgewood's own Planning & Zoning page lists as directly 'adopted by Town of Edgewood' in its Quick Links (edgewood-nm.gov/planning-zoning).; Edgewood is NOT a New Mexico Construction Industries Division (CID) Local Enforcement Agency (LEA) — unlike Albuquerque, Santa Fe, Las Cruces, and Rio Rancho, it has no building department of its own, so all structural/trade codes are enforced directly by the state CID under the statewide New Mexico Administrative Code (NMAC) Title 14 baseline, not a town-adopted amendment set. Per NM RLD/CID's Rules, Laws and Building Codes page (current as of the 2025-11-19 fee-page update) and CID's October 2024 Building Permit Guide for Residential Construction, CID currently enforces: 2021 New Mexico Commercial Building Code (NMAC 14.7.2) / 2021 International Building Code; 2021 New Mexico Residential Building Code (NMAC 14.7.3) / 2021 International Residential Code; 2021 New Mexico Earthen Building Materials Construction Code, Phase III (NMAC 14.7.4); 2009 New Mexico Non-Load-Bearing Baled Straw Construction Building Code, Phase III (NMAC 14.7.5); 2021 New Mexico Residential Energy Conservation Code (NMAC 14.7.6, effective 7/30/2024); 2021 New Mexico Existing Building Code (NMAC 14.7.7); 2021 New Mexico Historic Earthen Buildings code (NMAC 14.7.8); 2021 New Mexico Commercial Energy Code (NMAC 14.7.9); 2021 New Mexico Plumbing Code (NMAC 14.8.2) / 2021 Uniform Plumbing Code (IAPMO); 2012 New Mexico Swimming Pool, Spa, and Hot Tub Code (NMAC 14.8.3); New Mexico Medical Gas Code (NMAC 14.8.4); 2021 New Mexico Mechanical Code (NMAC 14.9.2) / 2021 Uniform Mechanical Code (IAPMO); 2012 New Mexico Solar Energy Code (NMAC 14.9.6); 2017 ICC/ANSI A117.1 Accessibility Code; 2020 New Mexico Electrical Code (NMAC 14.10.4) / 2020 National Electrical Code; and 2012 New Mexico Electrical Safety Code (NMAC 14.10.5).. Local amendments apply — see the Edgewood overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.