Last verified 2026-07-08 · Source · Embed this page’s badge · Version history
Building department
- Address
- 751 East 100 North, Suite 2600, Price, UT 84501
- Phone
- (435) 636-3260 (Building Division main line / Administrative Assistant); (435) 636-3261 (Director of Building & Planning)
- Office hours
- Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 3:00 PM (Building Department-specific hours per the county's own Building Permits FAQ; distinct from general County Administration hours of Mon–Fri 8:00 AM – 5:00 PM)
- Website
- Official site
Inspection guide
See how inspections work in Unincorporated Carbon County — sequence, scheduling & re-inspection fees.
Codes adopted
Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.
- 2024 International Building Code (IBC), including Appendices C and J — governs per Utah Code §15A-2-103(1)(a) (https://le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), in force statewide since 7/1/2026 and binding on counties under §15A-1-204. Carbon County's own Building Permits page 'What codes are enforced?' FAQ still lists the 2021 IBC with Appendix J only (no Appendix C) — live-checked 2026-07-16, the county's own page has not been updated to the current statewide edition.
- 2021 International Residential Code (IRC), including Appendix AQ (the FAQ labels it 'Appendix Q') — governs per Utah Code §15A-2-103(1)(b)/(c); this edition is UNCHANGED from the prior code cycle. Carbon County's own FAQ lists the 2021 IRC with Appendix Q — live-checked 2026-07-16, consistent with the current statute on the base edition.
- 2024 International Plumbing Code (IPC) — governs per Utah Code §15A-2-103(1)(d). Carbon County's own FAQ still lists the 2021 IPC — live-checked 2026-07-16, lags the current statewide edition.
- 2024 International Mechanical Code (IMC) — governs per Utah Code §15A-2-103(1)(e). Carbon County's own FAQ still lists the 2021 IMC — live-checked 2026-07-16, lags the current statewide edition.
- 2024 International Fuel Gas Code (IFGC) — governs per Utah Code §15A-2-103(1)(f). Carbon County's own FAQ still lists the 2021 IFGC — live-checked 2026-07-16, lags the current statewide edition.
- 2023 National Electrical Code (NEC) — governs per Utah Code §15A-2-103(1)(g); this edition is UNCHANGED from the prior code cycle. Carbon County's own FAQ lists the 2020 NEC — live-checked 2026-07-16, one cycle behind the current statewide edition; confirmed directly against the county's own published FAQ rather than assumed uniform statewide.
- 2024 International Energy Conservation Code (IECC), one code with no residential/commercial split — governs per Utah Code §15A-2-103(1)(h). Carbon County's own Building Permits FAQ does not list any IECC edition at all — live-checked 2026-07-16; added here per the statute, not omitted.
- 2024 International Existing Building Code (IEBC), subject to Utah Code §15A-2-104(2) (the HUD Code) — governs statewide per Utah Code §15A-2-103(1)(i)/(j). Not listed on Carbon County's own Building Permits FAQ — live-checked 2026-07-16.
- Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — governs statewide per Utah Code §15A-2-103(1)(n). Not listed on Carbon County's own Building Permits FAQ — live-checked 2026-07-16.
- Modular Building Institute (MBI) Standards 1200 and 1205 — governs statewide per Utah Code §15A-2-103(1)(o). Not listed on Carbon County's own Building Permits FAQ — live-checked 2026-07-16.
Permit types & fees
Residential Building Permit (New Home / Cabin)
Required for new single-family home and cabin construction on unincorporated Carbon County land. Issued directly by Carbon County's Building & Planning Department — unincorporated land has no separate city layer, so there is no additional city zoning-approval step (unlike properties within Price, Helper, East Carbon, Wellington, or Scofield Town, which require separate city zoning sign-off per price.json). Instead, unincorporated-area applicants must submit a signed Road Encroachment Agreement. Reviewed under Utah Code §15A-2-103's statewide-adopted codes: 2024 IBC, 2021 IRC (App AQ), 2024 IPC/IMC/IFGC, and 2023 NEC — Carbon County's own FAQ still cites 2021 IBC/IRC (Appendix J/Q)/IPC/IMC/IFGC and 2020 NEC (live-checked 2026-07-16).
Commercial Building Permit
Required for new commercial and industrial construction on unincorporated Carbon County land. Issued directly by Carbon County's Building & Planning Department — unincorporated land has no city zoning-approval step (unlike Price City), but requires a signed Road Encroachment Agreement, and Industrial-Zone uses require a Conditional Use Permit (up to 2 months) before the building permit can be approved. Carbon County publishes a dedicated 'Commercial and Industrial Structures' checklist distinct from its residential New Home/Cabin packet, identical to the one used for Price City.
Solar Panel (PV) Permit
Required for rooftop and ground-mounted solar photovoltaic system installation on unincorporated Carbon County land. Carbon County's Building Permits service page explicitly lists 'Solar Panels' among the project types requiring a building permit, and — effective January 1, 2025 — names 'New Construction and Solar' building permit applications specifically as requiring a non-refundable $250.00 deposit, applied as a credit toward the final permit fee. The county does not publish a dedicated solar submittal checklist distinct from its standard plan-set requirements, and (consistent with the rest of this file) no dollar-amount valuation-based fee table beyond the $250 deposit could be located on carbon.utah.gov after a direct re-check of the Building Permits page.
Commercial Tenant Improvement / Tenant Finish Permit
Required for interior tenant-improvement and tenant-finish work within existing commercial space on unincorporated Carbon County land. Carbon County does not publish a fee category or checklist distinct from new commercial construction — the same Commercial and Industrial Structures checklist and unconditional engineered-plan requirement apply, scoped to the actual work performed.
EV Charger / EVSE Permit
Carbon County publishes no distinct EV charger / EVSE permit, fee, or checklist item. An EV charger circuit installation in unincorporated Carbon County would be processed under the general Residential or Commercial Building Permit, but the county does not publish any dollar-amount fee table (valuation-based or flat-fee) for building permits at all on its official website — the same gap documented for its Residential Building Permit entry.
Sign Permit (Advertising Sign)
Carbon County DOES have a real, currently-adopted sign ordinance for unincorporated land — Development Code §3.3.26 'Advertising Signs,' most recently amended by Ord. 545 (3/17/2021) — even though this ordinance is not surfaced on the Building Permits or Commercial/Industrial checklist pages (this file's commercial-building-permit entry previously found no distinct sign process because it only checked the Building Department's own pages, not the separately-hosted Development Code). The permit is issued by the Zoning Administrator (part of the Planning & Zoning function, not the Building Department) for any advertising sign not falling within a list of exempted sign types. No dollar-amount fee for this permit could be located anywhere on the county's official sites (carbon.utah.gov, the Development Code, or the Land Use Applications page's fee list, which covers subdivisions/conditional-use/rezone fees but never mentions signs) — genuinely undocumented, not omitted.
Fire Sprinkler & Fire Alarm Plan Review
Unincorporated Carbon County has no county fire department or dedicated county fire marshal of its own — the county's Emergency Management Services page (live-checked 2026-07-22) describes only emergency preparedness, alerting, hazmat, and watershed/wildfire-mitigation functions, with no fire-plan-review capability, and public reporting confirms Carbon County contracts fire suppression response for unincorporated land from the Price, Helper, Wellington, and East Carbon city fire departments rather than running its own department. This file's commercial-building-permit entry already documents that the county's Commercial and Industrial Structures checklist requires 'Fire sprinkler system plans, if required' as part of the general building-permit submittal, but that checklist does not say who actually reviews those plans. Per Utah Code §53-7-104 (confirmed by direct text retrieval, effective 2/27/2023), the Utah State Fire Marshal automatically has enforcement/plan-review authority only in areas outside any organized fire protection district; where an organized fire protection district covers the area, State Fire Marshal authority applies only 'upon receiving a request from the chief fire official or the local governing body' — a request this file could not confirm as made or standing for unincorporated Carbon County. In practice, the Utah State Fire Marshal's Office publishes statewide submittal forms (Automatic Fire Sprinkler Plan Submittal Form; Fire Alarm Plan Review Submittal Form) used by jurisdictions without their own fire-plan-review capacity, each carrying a fee of $0.022 per square foot of area covered, $75.00 minimum (confirmed by direct retrieval of both official forms 2026-07-22) — the most plausible real-world path for a Carbon County project, but this file cannot confirm as a matter of settled local practice that Carbon County actually routes projects there rather than to one of the contracted city fire departments. Genuinely partial.
Change of Use / Change of Occupancy Permit
Carbon County does not publish a standalone 'Change of Use' or 'Certificate of Occupancy' permit application, checklist, or fee distinct from its general Building Permit (this file's commercial-tenant-improvement-permit entry already documented this gap as of a 2026-07-20 check). Two genuinely distinct county-administered paths cover a change of use/occupancy on unincorporated land, confirmed directly from the county's own site: (1) any physical alteration, or any change in a building's occupancy classification, falls under the general Building Permit requirement — the Building Permits page states any owner who intends to '...change the occupancy of a building or structure...must first apply to the Building Department and obtain the required permit,' reviewed under the 2024 International Existing Building Code's Chapter 10 (Change of Occupancy) provisions, adopted statewide per Utah Code §15A-2-103(1)(i)/(j) (see this file's codesAdopted); (2) separately, for a new or changing BUSINESS at an existing location — regardless of whether any construction occurs — the county's Business License process requires 'Business License Zoning Approval': the Planning & Zoning page states 'all business license applications must get zoning approval by the Planning & Zoning Director,' obtained at Suite 2600 before the Clerk's Office (Suite 1100) will issue the license. This functions as the practical change-of-use compliance check for a new occupant/use with no construction scope, but rides on the Business License Application's own fee rather than a separate change-of-use fee.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 2units
2 buildings · $1.3M valuation
- Trailing 12 months
- 37units
12 of 12 months reported · #74 in Utah coverage by units
- Year to date (2026 YTD through 2026-05)
- 13units
13 buildings · $6.8M valuation
- Full year 2025
- 45units
45 buildings · $19.9M valuation
County-wide figures: Carbon County, UT FIPS 49/007, confirmed against the same U.S. Census Bureau reference used in price.json (Price city FIPS 62030 falls within Carbon County, county FIPS 007). This file covers unincorporated Carbon County land only — Price City, Helper, East Carbon, Wellington, and Scofield Town are each their own incorporated jurisdictions and are out of scope here (Price is documented separately in price.json).
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity
Tips & gotchas
- Unincorporated Carbon County land is served DIRECTLY by the same Carbon County Building & Planning Department documented in price.json for Price City — this is one consolidated countywide building-permit authority, not a separate program. The department's own page states it serves 'all unincorporated and incorporated areas of the county.'
- The meaningful procedural difference from incorporated-city land: unincorporated applicants do NOT need the separate city zoning-approval step required for property within Price, Helper, East Carbon, Wellington, or Scofield Town limits. Instead, unincorporated applicants must submit a signed Road Encroachment Agreement (if access is from a County road) — per the live Building Permits page this goes to the County Road Shop (435-636-3268), while the New Home/Cabin Checklist packet directs it to the Building Department as a Road Encroachment Permit approved by the Carbon County Road Department. Confirm current routing directly with the Building Department at (435) 636-3260.
- No dollar-amount building-permit fee schedule (valuation table or flat-fee list) could be located on Carbon County's official website despite an exhaustive search across the Building Permits page, Building Department page, Building Information/Resources page, New Home/Cabin Checklist, Planning & Zoning page, Land Use Applications page, Commission page, and the county's own site search — identical finding to price.json for the same department. Only two dollar figures are confirmed: a $250 non-refundable deposit (New Construction/Solar, credited toward the final fee, effective 1/1/2025) and a $30 non-refundable GIS mapping deposit. The residential-building-permit permit type is therefore marked confidence:'partial' with fees:[] rather than fabricated, per the project's zero-tolerance policy on invented numbers.
- Carbon County's own FAQ still lists the 2021 I-Codes (IBC w/ Appendix J, IRC w/ Appendix Q, IPC, IMC, IFGC) and the 2020 NEC (live-checked 2026-07-16, unchanged) — but Utah Code §15A-2-103 governs statewide and binds counties under §15A-1-204: 2024 IBC (Appendices C & J), 2021 IRC (Appendix AQ, unchanged), 2024 IPC/IMC/IFGC, 2023 NEC (unchanged), 2024 IECC (one code, no residential/commercial split), 2024 IEBC, and residential 2024 ISPSC. Carbon County's own FAQ omits IECC, IEBC, and ISPSC entirely — those are added to codesAdopted above per the statute, not fabricated. Confirmed directly against the county's own published FAQ, not assumed.
- 2026-07-16 codesAdopted re-verification: Utah Code §15A-2-103 (live-checked at the canonical le.utah.gov URL, current version 'Effective 7/1/2026') was re-fetched and confirmed against Carbon County's Building Permits FAQ, also live-checked 2026-07-16 and found unchanged from the prior review — the county's own page continues to display 2021-cycle editions and a 2020 NEC, and does not publish IECC, IEBC, or ISPSC entries at all. The statute is stated as governing above; the county's page is preserved as history.
- Carbon County publishes an actual review-timeline SLA (up to 14 business days residential / 21 commercial, per the general Building Permits page, with a closely related 15-business-day figure in the New Home/Cabin Checklist) — a genuine, verified turnaround commitment, not an omission. This applies to unincorporated land as much as incorporated-city land; the page draws no distinction.
- Design criteria apply countywide, including unincorporated land: Wind Speed 105 mph exposure C; Seismic Design Category C (D0 west of Helper — this band includes unincorporated land west of Helper); Weathering — Severe; Frost line depth 24 inches (36 inches in the Scofield area, which includes surrounding unincorporated land).
- The Building Department's own office hours (Mon–Thu 8 AM–5 PM, Fri 8 AM–3 PM, per the Building Permits FAQ) run shorter on Fridays than general Carbon County Administration hours (Mon–Fri 8 AM–5 PM) — worth noting for anyone planning an in-person visit on a Friday afternoon.
- 2026-07-23 exhaustive partial-chase (all ~8 partial permit-type fields reviewed): the countywide no-published-fee-table gap was re-chased with genuinely new avenues — a Wayback CDX sweep of carbon.utah.gov's pre-2018 DNN-era site found no fee-schedule PDF among its Packets/Forms/Handouts library, but did surface a 2009 Wayback snapshot of a now-defunct page publishing an actual valuation-based fee table specifically for 'Carbon County Area (outside of the Cities)' (this file's exact jurisdiction), plus a 2013 Wayback Building Department Policy PDF confirming a fee-setting County Resolution exists — both are historical corroboration only (Wayback-only, 10-17 years stale) and are NOT used to mark any field verified, per this project's rule against verifying on archive-only evidence. Live re-checks (Building Permits page, live site search) confirm the gap remains current as of today. This matches the identical same-day conclusion independently reached for price.json (same Building Department). The sign-permit, fire-sprinkler-alarm-permit, and change-of-use-permit timeline/authority gaps were also independently re-chased with new avenues (Land Use Applications day/week-language sweep; a Utah Public Notice Website search ruling out an organized Carbon County, Utah fire protection district — distinguished from a same-named Carbon County, WYOMING entity; and a live Business License page re-read surfacing a previously-undocumented required Commission-approval step) — none closed to verified; all remain confidence:'partial' with dated notes appended. No field's lastVerified was bumped and no dollar figures, timelines, or authorities were fabricated.