Skip to main content
PermitBase

Unincorporated Carbon County building permits

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Carbon County, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
751 East 100 North, Suite 2600, Price, UT 84501
Phone
(435) 636-3260 (Building Division main line / Administrative Assistant); (435) 636-3261 (Director of Building & Planning)
Office hours
Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 3:00 PM (Building Department-specific hours per the county's own Building Permits FAQ; distinct from general County Administration hours of Mon–Fri 8:00 AM – 5:00 PM)

Inspection guide

See how inspections work in Unincorporated Carbon County — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — governs per Utah Code §15A-2-103(1)(a) (https://le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), in force statewide since 7/1/2026 and binding on counties under §15A-1-204. Show full text

    2024 International Building Code (IBC), including Appendices C and J — governs per Utah Code §15A-2-103(1)(a) (https://le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), in force statewide since 7/1/2026 and binding on counties under §15A-1-204. Carbon County's own Building Permits page 'What codes are enforced?' FAQ still lists the 2021 IBC with Appendix J only (no Appendix C) — the county's own page has not been updated to the current statewide edition.

  • 2021 International Residential Code (IRC), including Appendix AQ (the FAQ labels it 'Appendix Q') — governs per Utah Code §15A-2-103(1)(b)/(c); this edition is UNCHANGED from the prior code cycle. Carbon County's own FAQ lists the 2021 IRC with Appendix Q — consistent with the current statute on the base edition.
  • 2024 International Plumbing Code (IPC) — governs per Utah Code §15A-2-103(1)(d). Carbon County's own FAQ still lists the 2021 IPC — this lags the current statewide edition.
  • 2024 International Mechanical Code (IMC) — governs per Utah Code §15A-2-103(1)(e). Carbon County's own FAQ still lists the 2021 IMC — this lags the current statewide edition.
  • 2024 International Fuel Gas Code (IFGC) — governs per Utah Code §15A-2-103(1)(f). Carbon County's own FAQ still lists the 2021 IFGC — this lags the current statewide edition.
  • 2023 National Electrical Code (NEC) — governs per Utah Code §15A-2-103(1)(g); this edition is unchanged from the prior code cycle. Carbon County's own published FAQ lists the 2020 NEC, one cycle behind the current statewide edition.
  • 2024 International Energy Conservation Code (IECC), one code with no residential/commercial split — governs per Utah Code §15A-2-103(1)(h). Carbon County's own Building Permits FAQ does not list any IECC edition at all — added here per the statute, not omitted.
  • 2024 International Existing Building Code (IEBC), subject to Utah Code §15A-2-104(2) (the HUD Code) — governs statewide per Utah Code §15A-2-103(1)(i)/(j). Not listed on Carbon County's own Building Permits FAQ.
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — governs statewide per Utah Code §15A-2-103(1)(n). Not listed on Carbon County's own Building Permits FAQ.
  • Modular Building Institute (MBI) Standards 1200 and 1205 — governs statewide per Utah Code §15A-2-103(1)(o). Not listed on Carbon County's own Building Permits FAQ.

Permit types & fees

Property Access

Unincorporated Carbon County's permit history is searchable by address

14,326 permits on record for Unincorporated Carbon County, 1957–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

97% of Unincorporated Carbon County's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
3units

3 buildings · $800,257 valuation

Trailing 12 months
39units

12 of 12 months reported · #83 in Utah coverage by units

Year to date (2026 YTD through 2026-07)
24units

24 buildings · $12.8M valuation

Full year 2025
45units

45 buildings · $19.9M valuation

County-wide figures: Carbon County, UT FIPS 49/007, confirmed against the same U.S. Census Bureau reference used for the Price entry (Price city FIPS 62030 falls within Carbon County, county FIPS 007). This record covers unincorporated Carbon County land only — Price City, Helper, East Carbon, Wellington, and Scofield Town are each their own incorporated jurisdictions and are out of scope here (Price is documented in its own separate entry).

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Unincorporated Carbon County land is served DIRECTLY by the same Carbon County Building & Planning Department documented in the Price entry for Price City — this is one consolidated countywide building-permit authority, not a separate program. The department's own page states it serves 'all unincorporated and incorporated areas of the county.'
  • The meaningful procedural difference from incorporated-city land: unincorporated applicants do NOT need the separate city zoning-approval step required for property within Price, Helper, East Carbon, Wellington, or Scofield Town limits. Instead, unincorporated applicants must submit a signed Road Encroachment Agreement (if access is from a County road) — per the live Building Permits page this goes to the County Road Shop (435-636-3268), while the New Home/Cabin Checklist packet directs it to the Building Department as a Road Encroachment Permit approved by the Carbon County Road Department. Confirm current routing directly with the Building Department at (435) 636-3260.
  • Carbon County publishes no dollar-amount building-permit fee schedule (valuation table or flat-fee list) anywhere on its official website — not on the Building Permits page, Building Department page, Building Information/Resources page, New Home/Cabin Checklist, Planning & Zoning page, Land Use Applications page, or Commission page. The same is true for Price City, served by the same department. Only two dollar figures are published: a $250 non-refundable deposit (New Construction/Solar, credited toward the final fee, effective 1/1/2025) and a $30 non-refundable GIS mapping deposit. No residential-building-permit fee figure is listed rather than fabricated.
  • Carbon County's own FAQ still lists the 2021 I-Codes (IBC w/ Appendix J, IRC w/ Appendix Q, IPC, IMC, IFGC) and the 2020 NEC (unchanged) — but Utah Code §15A-2-103 governs statewide and binds counties under §15A-1-204: 2024 IBC (Appendices C & J), 2021 IRC (Appendix AQ, unchanged), 2024 IPC/IMC/IFGC, 2023 NEC (unchanged), 2024 IECC (one code, no residential/commercial split), 2024 IEBC, and residential 2024 ISPSC. Carbon County's own FAQ omits IECC, IEBC, and ISPSC entirely — those are added to codesAdopted above per the statute, not fabricated.
  • Utah Code §15A-2-103 (canonical le.utah.gov URL, current version 'Effective 7/1/2026') governs code editions statewide, while Carbon County's own Building Permits FAQ continues to display 2021-cycle editions and a 2020 NEC and does not publish IECC, IEBC, or ISPSC entries at all. The statute is stated as governing above; the county's page is noted as historical context.
  • Carbon County publishes an actual review-timeline SLA (up to 14 business days residential / 21 commercial, per the general Building Permits page, with a closely related 15-business-day figure in the New Home/Cabin Checklist) — a genuine, verified turnaround commitment, not an omission. This applies to unincorporated land as much as incorporated-city land; the page draws no distinction.
  • Design criteria apply countywide, including unincorporated land: Wind Speed 105 mph exposure C; Seismic Design Category C (D0 west of Helper — this band includes unincorporated land west of Helper); Weathering — Severe; Frost line depth 24 inches (36 inches in the Scofield area, which includes surrounding unincorporated land).
  • The Building Department's own office hours (Mon–Thu 8 AM–5 PM, Fri 8 AM–3 PM, per the Building Permits FAQ) run shorter on Fridays than general Carbon County Administration hours (Mon–Fri 8 AM–5 PM) — worth noting for anyone planning an in-person visit on a Friday afternoon.
  • Historical archived materials corroborate the countywide fee-publication gap: a 2009 archived snapshot of a now-defunct county page published an actual valuation-based fee table specifically for 'Carbon County Area (outside of the Cities)', and a 2013-archived Building Department Policy PDF confirms a fee-setting County Resolution exists — both are historical corroboration only (10-17 years stale) and are not treated as current figures. The county's current pages confirm the gap remains: no fee table, no sign-permit or fire-sprinkler timeline, and no standalone change-of-use timeline is published. The same gap applies to Price City, served by the same Building Department.

Comparable nearby cities

Price
Both in Carbon County7 shared permit types
Compare fees →