Accessory Structure Permit in Millcreek, Utah

Required for construction of detached garages, sheds over 200 square feet, workshops, and other accessory structures in Millcreek.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building PermitBased on ICC valuation table
Plan Review65% of permit fee

Review timeline

~714 business days

Typical estimate — confirm current times with the Millcreek building department

Inspection process

  1. 1

    Foundation

    Footing and foundation before concrete pour

  2. 2

    Framing

    Framing, sheathing, and roof structure

  3. 3

    Final

    Structure complete, all systems operational

Tips

Frequently asked questions

Do I need a permit for a shed in Millcreek?
In Millcreek, sheds over 200 square feet require a building permit. Sheds 200 square feet or smaller are generally exempt from a building permit but must still comply with zoning setback requirements.
How close to the property line can I build an accessory structure in Millcreek?
Setback requirements for accessory structures in Millcreek vary by zone. Contact the Building Department at (801) 214-2700 to confirm the setback requirements for your specific property.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-06-27.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Millcreek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Millcreek

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.