Accessory Structure Permit in Millcreek, Utah
Required for construction of detached garages, sheds over 200 square feet, workshops, and other accessory structures in Millcreek.
Verified 2026-06-27 · Source
When you need this permit
- Accessory structures over 200 square feet
- Any structure with electrical, plumbing, or mechanical systems
- Detached garages regardless of size
Required documents
- Req
Building Plans
Construction drawings showing dimensions, framing, and foundation details
- Req
Site Plan
Plot plan showing structure location, setbacks, and lot coverage
- Opt
Engineering
Structural engineering if required by building official for larger structures
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | Based on ICC valuation table | — |
| Plan Review | 65% of permit fee | — |
Review timeline
~7–14 business days
Typical estimate — confirm current times with the Millcreek building department
Inspection process
- 1
Foundation
Footing and foundation before concrete pour
- 2
Framing
Framing, sheathing, and roof structure
- 3
Final
Structure complete, all systems operational
Tips
- Millcreek has strict lot coverage limits — verify your total lot coverage before adding an accessory structure.
- Accessory structures must meet minimum setback requirements, which vary by zone.
- Sheds 200 square feet or less may be exempt from a permit but still must comply with setback requirements.
Frequently asked questions
- Do I need a permit for a shed in Millcreek?
- In Millcreek, sheds over 200 square feet require a building permit. Sheds 200 square feet or smaller are generally exempt from a building permit but must still comply with zoning setback requirements.
- How close to the property line can I build an accessory structure in Millcreek?
- Setback requirements for accessory structures in Millcreek vary by zone. Contact the Building Department at (801) 214-2700 to confirm the setback requirements for your specific property.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- Millcreek Building Department — official building department
- Greater Salt Lake MSD FY2026 Fee Schedule
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Millcreek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Millcreek
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.