Plumbing Permit — Millcreek, Utah · Requirements sheet
Verified 2026-06-30 · Source: https://millcreekut.gov/DocumentCenter/View/4398/FY25-Consolidated-Fee-Schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Millcreek, Utah
Required for plumbing installations, alterations, and repairs in Millcreek including water heaters, re-pipes, and fixture additions. Governed by the 2024 International Plumbing Code (IPC) as adopted by Utah Code § 15A-2-103, effective July 1, 2026 (superseded the 2021 edition).
Verified 2026-06-30 · Source
When you need this permit
- New plumbing fixture installations (sinks, toilets, showers)
- Water heater installation or replacement
- Water line or sewer line replacement or extension
- Gas line installation or modification
- Backflow prevention device installation
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Plumbing Rough-In (part of Four-Way inspection for MEP projects)
Distribution piping, drain waste vent piping, traps, manifolds, backwater valves, and supports complete and under test before insulation or drywall. Millcreek requires a combined four-way inspection for projects with any MEP work.
- 2
Gas Line
Piping, supports, drip legs, and test tees complete and under test before connecting to meters, appliances, or regulators. A gas line diagram is required to verify pipe sizing.
- 3
Final
All fixtures connected, water flowing, no leaks, proper venting verified. Shower pans do not require a separate inspection per Millcreek's Required Inspections guide.
See the full Millcreek inspection guide — scheduling & re-inspection fees →
Tips
- Water heater replacements in Millcreek require a permit even for like-for-like swaps — $70 base fee per the FY25 fee schedule.
- Shower pans do not require a separate inspection per Millcreek's Required Inspections guide.
- Millcreek follows the 2024 IPC, effective July 1, 2026 (superseded the 2021 edition).
- Gas line work requires a gas line inspection in addition to the plumbing rough-in.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Millcreek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Millcreek
Plumbing Permit in other cities
Compare plumbing permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Millcreek project checklist
Describe your project once and get every permit, document, and fee it triggers in Millcreek — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →