Window and Door Replacement Permit in Millcreek, Utah
Required for replacement of windows and doors (residential, replacement only with no other structural work) in Millcreek. The FY25 fee schedule lists a flat $70 residential window/door replacement-only fee.
Verified 2026-06-30 · Source
When you need this permit
- Replacement of existing windows or doors in the same opening (residential, no other structural work)
Required documents
- Req
Building Permit Application (iWorQ portal)
Submit via millcreekpermit.portal.iworq.net.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Window and Door Permit (Residential — replacement only, no other work) | $70 | Millcreek FY25 Consolidated Fee Schedule, Item 15, MKC § 15-08-030 (dated 8/12/2024) |
| Window and Door Permit (Commercial) | Based on ICC valuation table | Millcreek FY25 Consolidated Fee Schedule, Item 16, MKC § 15-08-030 |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Review timeline
~1–14 business days
Typical estimate — confirm current times with the Millcreek building department
Inspection process
- 1
Final
Verify window or door installation meets size, flashing, and weather barrier requirements.
Tips
- Millcreek's $70 window/door permit applies to residential replacement-only projects with no other structural work per Item 15 of the FY25 fee schedule.
- If window replacement is part of a larger remodel or addition, the work falls under the standard ICC valuation-based building permit fee schedule.
Frequently asked questions
- Do I need a permit to replace windows in Millcreek?
- Yes. Millcreek requires a permit for residential window and door replacements (replacement only with no other work). The flat fee is $70 per the FY25 Consolidated Fee Schedule (MKC § 15-08-030, dated 8/12/2024).
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
- Millcreek Building Department — official building department
- Millcreek FY25 Consolidated Fee Schedule, Items 15–16, MKC § 15-08-030 (dated 8/12/2024)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Millcreek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Millcreek
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.