Fire Alarm System Permit in Millcreek, Utah

Millcreek is served by the Unified Fire Authority (UFA), which acts as the fire code official under International Fire Code (IFC) Sections 104.7.2 and 105.1.1. Per UFA's own Fire Alarm and Detection System Submittal guide, 'All new commercial fire alarm system installations and existing system additions or modifications require a plan submittal and permit from UFA' — this permit is issued and administered entirely by UFA, not by the Millcreek Building Department. Neither Millcreek's own FY25 Consolidated Fee Schedule nor UFA's own published Fee Schedule 2025 lists a specific dollar fee for this permit type (both checked in full); when a fire alarm system is installed as part of new construction or a tenant improvement, Millcreek's separate valuation-based Building Permit fee (see the Commercial Building Permit and Commercial Tenant Improvement / Alteration Permit entries) still applies to the overall project.

Reviewed 2026-07-21 · Source

When you need this permit

  • All new commercial fire alarm system installations and existing system additions or modifications require a plan submittal and permit from UFA
  • Design and installation via the most recent version of NFPA 72 adopted by the State of Utah
  • System designer must be NICET Level III or better (Engineering Technician), a Fire Protection Engineer, or a licensed engineer with specific additional fire protection system training
  • Any structure (except one- and two-family dwellings) with 20 or more fire sprinkler heads installed must also have off-site alarm monitoring

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

UFA Fire Alarm System Permit / Plan Review FeeExhaustively checked both potential fee-charging authorities' official documents in full: Millcreek's FY25 Consolidated Fee Schedule (317 line items, dated 8/12/2024) contains no fire alarm line item, and UFA's own 'UFA Fee Schedule 2025' PDF (unifiedfireut.gov/wp-content/uploads/UFA-Fee-Schedule-2025.pdf) covers only hazmat/operational annual permits, community events, medical training, records, and special enforcement — no fire alarm system installation or plan-review fee is listed. Confirm current pricing directly with UFA Fire Prevention at (801) 743-7200.
Not published
Third-Party Peer Review FeePaid directly to the UFA-approved third-party design professional selected by the applicant (required for 5+ horn/strobe additions/relocations); this is a private consulting fee, not a government fee, and is not set or published by UFA.
Market rate (varies by reviewer)
Underlying Building/Alteration Permit (if tied to new construction or tenant improvement)Millcreek's Commercial Alteration Requirements checklist confirms fire alarm plans for a tenant improvement are 'routed to Unified Fire Authority for approval before installation' as an added step within the Building Department's own permit — the valuation-based Building Permit fee still applies to the overall project.
See Commercial Building Permit / Commercial Tenant Improvement Permit entries

Review timeline

Plan reviewTypical estimate — confirm current times with the Millcreek building department
~10–30 business days

How long did your Fire Alarm System Permit permit actually take in Millcreek?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Device and wiring placement verified against approved plans before wall cover, including notification appliance (horn/strobe) locations.

  2. 2

    Battery / Standby Power Test

    Battery calculations and standby power supply verified per submitted plans.

  3. 3

    Final Acceptance Test / Record of Completion

    Full functional test of devices and notification appliances, remote annunciator check, and — for Institutional, Hazardous, Large Shopping Mall, and High-Rise occupancies — verification of the required Knox brand 1300 series cabinet with building floor plans and utility shut-off information.

See the full Millcreek inspection guide — scheduling & re-inspection fees →

Tips

  • Fire alarm systems in Millcreek are permitted and inspected entirely by the Unified Fire Authority (UFA), not the Millcreek Building Department — UFA's own guide states plainly that all new commercial fire alarm installations and modifications require a plan submittal and permit from UFA.
  • Adding or relocating 5 or more horn/strobe notification appliances triggers the third-party peer review requirement (a UFA permit is still required below that threshold).
  • Neither Millcreek's nor UFA's published fee schedule lists a specific dollar fee for this permit — confirm current pricing directly with UFA Fire Prevention, (801) 743-7200, before applying.
  • Unfinished tenant spaces must have at least one horn/strobe device per unit; restrooms require strobe-only devices per UFA's submittal guide.
  • When a fire alarm system is installed as part of new construction or a commercial tenant improvement, Millcreek's own valuation-based Building Permit fee still applies to that overall project — the UFA process is an additional required sign-off, not a substitute.

Frequently asked questions

Yes. UFA's own Fire Alarm and Detection System Submittal guide states that existing system additions or modifications, not just new installations, require a plan submittal and permit from UFA.

Fire alarm systems in Millcreek are permitted directly by the Unified Fire Authority (UFA), the fire code official for the city, not by Millcreek's own Building Department. Neither Millcreek's FY25 Consolidated Fee Schedule nor UFA's own Fee Schedule 2025 (both checked in full) lists a specific dollar fee for this permit type — contact UFA Fire Prevention at (801) 743-7200 for the current fee. A UFA-approved third-party design professional must also peer-review the plans (required when 5+ horn/strobe devices are added or relocated) at that reviewer's own market rate before UFA's final review.

Plan review for a fire alarm system permit in Millcreek typically runs 10–30 business days. This is an estimate, not a published figure — confirm current review times with Millcreek Building Department at (801) 214-2700.

You'll need: Third-Party Peer Review Report; Working Plans, Manufacturer Cut Sheets, and Battery Calculations; UFA Plan Submittal. Depending on your project, Millcreek may also ask for: Record of Completion — Fire Alarm System. See the required-documents checklist on this page for details on each.

Millcreek requires 3 inspection(s) for a fire alarm system permit, in order: Rough-In, Battery / Standby Power Test, Final Acceptance Test / Record of Completion. Schedule each through Millcreek Building Department ((801) 214-2700).

Apply through Millcreek Building Department at 1330 East Chambers Avenue, Millcreek, UT 84106. Phone: (801) 214-2700, email: buildingservices@millcreekut.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://millcreekut.gov/165/Building-Services.

Millcreek, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(a)); see NOTE below on Millcreek's own page lagging this update; 2021 International Residential Code (IRC), including Appendix AQ (Tiny Houses) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b)); 2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(d)); 2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(e)); 2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(f)); 2023 National Electrical Code (NEC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(g)). Millcreek's Building Services page previously referenced a 2020 NEC edition (recorded as of 2026-06-30); the 2023 NEC supersedes it statewide regardless of the page's wording; 2024 International Energy Conservation Code (IECC) — currently in effect statewide as of July 1, 2026, a single edition with no residential/commercial split under current law (Utah Code § 15A-2-103(1)(h)); Historical (superseded): prior to July 1, 2026, Millcreek's Building Services page cited a 2015 IECC edition for residential and a separate 2021 IECC edition for commercial — both are now superseded by the single 2024 IECC per § 15A-2-103(1)(h); re-checked live 2026-07-16 and Millcreek's page (millcreekut.gov/165/Building-Services, via its Building Department overview page and 'Adopted Construction Codes' resource) still displayed this superseded 2015/2021 split — city page lags the statute; 2024 International Existing Building Code (IEBC) — currently in effect as of July 1, 2026, superseding the 2021 IEBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(i)); Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — currently in effect as of July 1, 2026, superseding the 2021 ISPSC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(n)); 2006 International Wildland-Urban Interface Code (IWUIC) — millcreekut.gov/165/Building-Services; applies to Foothills/Canyons Overlay Zone properties; NOTE (updated 2026-07-16): the July 1, 2026 transition forecast in the prior version of this entry has now occurred — confirmed live against Utah Code § 15A-2-103, current version (effective 7/1/2026, superseded 1/1/2027), read at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html. Millcreek's own Building Department page (millcreekut.gov, live 2026-07-16) still displays a banner reading 'On July 1, 2026, the State of Utah will adopt all 2024 I-Codes with State Amendments. Any Commercial project submitted on or after July 1st will need to be designed to these standards' — forward-looking, present-tense-stale wording that also narrows the transition to Commercial projects only; the statute imposes no residential/commercial distinction for IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC, so this record treats the full 2024 edition set as governing for all project types as of 2026-07-16, and flags the city page as not yet updated to reflect that the date has passed. Local amendments apply — see the Millcreek overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Millcreek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.