Water Heater Permit in Millcreek, Utah

Required for water heater installation, replacement, or conversion (tank to tankless) in Millcreek. Processed as a plumbing permit under MKC § 15-16-020. The FY25 fee schedule explicitly lists 'Water Heater' as a covered MEP item under the $70 base fee.

Verified 2026-06-30 · Source

When you need this permit

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Permit Base Fee (covers water heater)Millcreek FY25 Consolidated Fee Schedule, Item 3, MKC § 15-16-020 (dated 8/12/2024). Fee schedule explicitly lists 'Water Heater' as one of the MEP permit types covered by the $70 base fee.
$70
Additional Appliance (e.g., second water heater)Millcreek FY25 Consolidated Fee Schedule, Item 4, MKC § 15-16-020
$20 per additional item
Re-Inspection FeeMillcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040
$75 per occurrence
State SurchargeMillcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040
1% of permit fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Millcreek building department
~1–14 business days

How long did your Water Heater Permit permit actually take in Millcreek?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verify proper installation, venting, T&P valve discharge, gas connections, and seismic strapping.

See the full Millcreek inspection guide — scheduling & re-inspection fees →

Tips

  • Water heater permit in Millcreek costs $70 (base) per the FY25 fee schedule — the fee schedule explicitly names 'Water Heater' as a covered MEP item.
  • Gas water heaters require proper venting — high-efficiency units use PVC/CPVC vent, standard units use metal B-vent.
  • Seismic strapping is required in Utah — two straps at the upper and lower thirds of the tank.
  • T&P relief valve discharge must terminate within 6 inches of the floor or to the exterior per the 2024 IPC.

Frequently asked questions

Yes. Millcreek requires a plumbing permit for all water heater replacements, including like-for-like swaps. The fee is $70 per the FY25 Consolidated Fee Schedule (MKC § 15-16-020, dated 8/12/2024), plus a 1% state surcharge. A licensed plumber or the property owner (owner-occupied only) may pull the permit.

In Millcreek, the published Plumbing Permit Base Fee (covers water heater) is: $70. Additional published fees: Additional Appliance (e.g., second water heater) — $20 per additional item; Re-Inspection Fee — $75 per occurrence; State Surcharge — 1% of permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a water heater permit in Millcreek typically runs 1–14 business days. This is an estimate, not a published figure — confirm current review times with Millcreek Building Department at (801) 214-2700.

You'll need: Building Permit Application (iWorQ portal). Depending on your project, Millcreek may also ask for: Gas Line Diagram. See the required-documents checklist on this page for details on each.

Millcreek requires 1 inspection(s) for a water heater permit, in order: Final. Schedule each through Millcreek Building Department ((801) 214-2700).

Apply through Millcreek Building Department at 1330 East Chambers Avenue, Millcreek, UT 84106. Phone: (801) 214-2700, email: buildingservices@millcreekut.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://millcreekut.gov/165/Building-Services.

Millcreek, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(a)); see NOTE below on Millcreek's own page lagging this update; 2021 International Residential Code (IRC), including Appendix AQ (Tiny Houses) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b)); 2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(d)); 2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(e)); 2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(f)); 2023 National Electrical Code (NEC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(g)). Millcreek's Building Services page previously referenced a 2020 NEC edition (recorded as of 2026-06-30); the 2023 NEC supersedes it statewide regardless of the page's wording; 2024 International Energy Conservation Code (IECC) — currently in effect statewide as of July 1, 2026, a single edition with no residential/commercial split under current law (Utah Code § 15A-2-103(1)(h)); Historical (superseded): prior to July 1, 2026, Millcreek's Building Services page cited a 2015 IECC edition for residential and a separate 2021 IECC edition for commercial — both are now superseded by the single 2024 IECC per § 15A-2-103(1)(h); re-checked live 2026-07-16 and Millcreek's page (millcreekut.gov/165/Building-Services, via its Building Department overview page and 'Adopted Construction Codes' resource) still displayed this superseded 2015/2021 split — city page lags the statute; 2024 International Existing Building Code (IEBC) — currently in effect as of July 1, 2026, superseding the 2021 IEBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(i)); Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — currently in effect as of July 1, 2026, superseding the 2021 ISPSC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(n)); 2006 International Wildland-Urban Interface Code (IWUIC) — millcreekut.gov/165/Building-Services; applies to Foothills/Canyons Overlay Zone properties; NOTE (updated 2026-07-16): the July 1, 2026 transition forecast in the prior version of this entry has now occurred — confirmed live against Utah Code § 15A-2-103, current version (effective 7/1/2026, superseded 1/1/2027), read at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html. Millcreek's own Building Department page (millcreekut.gov, live 2026-07-16) still displays a banner reading 'On July 1, 2026, the State of Utah will adopt all 2024 I-Codes with State Amendments. Any Commercial project submitted on or after July 1st will need to be designed to these standards' — forward-looking, present-tense-stale wording that also narrows the transition to Commercial projects only; the statute imposes no residential/commercial distinction for IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC, so this record treats the full 2024 edition set as governing for all project types as of 2026-07-16, and flags the city page as not yet updated to reflect that the date has passed. Local amendments apply — see the Millcreek overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Millcreek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.