Commercial Building Permit in Millcreek, Utah
Required for new commercial construction in Millcreek, regulated by the 2024 International Building Code (current statewide as of July 1, 2026, per Utah Code § 15A-2-103(1)(a)). Millcreek's own Building Department page carries a banner stating 'Any Commercial project submitted on or after July 1st will need to be designed to these standards' — the 2024 I-Codes. Fees use the same ICC-valuation-based Building Permit table as residential construction (Millcreek FY25 Consolidated Fee Schedule, Item 1, MKC § 15-08-030), with plan review billed at the Commercial rate of 65% of the building permit fee (Item 20) rather than the 40% residential rate (Item 19).
Verified 2026-07-19 · Source
When you need this permit
- New commercial construction regulated by the 2024 IBC (current statewide 2026-07-01) — Millcreek's own Building Department page banner states any commercial project submitted on or after July 1, 2026 must be designed to the 2024 I-Codes with State Amendments
- Architect and engineer required — per Millcreek's official 'New Commercial Building Permit Requirements' guide
- Code/design analysis: applicable building codes, occupancy type, construction type, fire sprinkler and alarm requirements, design occupant load, restroom/fixture count, floor area, egress design
- Site plan and elevations per MKZ § 19.02.080, including public improvements (sidewalk, curb, and gutter along the frontage, per Millcreek Standard Plans 140 and 145)
- Applied for via the iWorQ permit portal (millcreekpermit.portal.iworq.net)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing
Forms, rebar, and grade complete before concrete poured.
- 2
Foundation
Forms, rebar, and grade complete before concrete poured.
- 3
Four-Way (Framing / Mechanical / Electrical / Plumbing)
Rough framing, mechanical, electrical, and plumbing complete before insulation or wall cover. Millcreek requires a combined four-way inspection for projects with any MEP work.
- 4
Fire Sprinkler / Alarm
Where required by occupancy group, per the New Commercial Building Permit Requirements checklist's code/design analysis section.
- 5
Final
All permitted work complete.
See the full Millcreek inspection guide — scheduling & re-inspection fees →
Tips
- Millcreek's Building Department page carries a banner (as of 2026-07-19): 'On July 1, 2026, the State of Utah will adopt all 2024 I-Codes with State Amendments. Any Commercial project submitted on or after July 1st will need to be designed to these standards.'
- An architect and engineer are required for new commercial building permits in Millcreek, per the city's official New Commercial Building Permit Requirements checklist — this is a stricter document requirement than the Residential Building Permit.
- Commercial plan review is billed at 65% of the building permit fee, versus 40% for residential (Millcreek FY25 Consolidated Fee Schedule, Items 19–20).
- Public improvements — sidewalk, curb, and gutter along the property frontage — are required per Millcreek Standard Plans 140 and 145; existing damaged sidewalk/curb/gutter must be replaced before Certificate of Occupancy.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Millcreek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Millcreek.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Millcreek
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Millcreek project checklist
Describe your project once and get every permit, document, and fee it triggers in Millcreek — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →