Patio Cover & Pergola Permit in Millcreek, Utah
Required for attached or detached patio covers, pergolas, gazebos, and similar shade structures in Millcreek.
Verified 2026-06-27 · Source
When you need this permit
- Attached patio covers (connected to the house)
- Detached patio covers and pavilions over 200 sq ft
- Pergolas with solid roof panels
- Screened-in porches and three-season rooms
- Gazebos over 200 sq ft
Required documents
- Req
Building Plans
Structural details — post sizes, beam spans, rafter spacing, and attachment
- Req
Site Plan
Structure location showing setbacks from property lines
- Req
Footing Details
Post footing size and depth (below frost line)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | $75-$250 based on square footage | — |
| Plan Review | 50-65% of permit fee | — |
Review timeline
~5–14 business days
Typical estimate — confirm current times with the Millcreek building department
Inspection process
- 1
Footings
Post footings excavated to proper depth, rebar, and forms
- 2
Framing
Posts, beams, rafters, and attachment to house (if attached)
- 3
Final
Roofing, electrical (if applicable), and completed structure
Tips
- Open-lattice pergolas with no solid roof may be exempt from permits in Millcreek — check local rules.
- Attached patio covers must not block bedroom egress windows.
- Footings in Millcreek must extend below frost line (typically 30 inches along the Wasatch Front).
- Solid-roof patio covers count toward lot coverage — verify you are within Millcreek maximum lot coverage.
Frequently asked questions
- Do I need a permit for a pergola in Millcreek?
- It depends. Open-lattice pergolas without solid roofing may be exempt in Millcreek. Pergolas with solid roof panels, attached structures, and any structure over 200 sq ft typically require a permit.
- Do I need a permit for a patio cover in Millcreek?
- Yes. Solid-roof patio covers in Millcreek require a building permit, whether attached or detached. They must meet structural, setback, and lot coverage requirements.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- Millcreek Building Department — official building department
- Greater Salt Lake MSD FY2026 Fee Schedule
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Millcreek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Millcreek
Related guides
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.