Temporary Structure & Event Permit in Millcreek, Utah
Required for temporary tents, stages, bleachers, and structures used for events or construction in Millcreek.
Verified 2026-06-27 · Source
When you need this permit
- Tents or canopies over 400 sq ft
- Temporary stages or platforms
- Bleachers or grandstands
- Construction trailers and temporary offices
- Seasonal sales structures (fireworks stands, Christmas tree lots)
Required documents
- Req
Temporary Structure Application
Structure type, size, duration, and location
- Req
Site Plan
Structure placement, exits, fire lanes, and parking
- Req
Fire Safety Plan
Fire extinguishers, exit signage, and flame-retardant certification for tents
- Opt
Event Permit
Required for public events — separate from structure permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Temporary Structure Permit | $50-$200 | — |
| Event Permit | $50-$300 (separate, if public event) | — |
Review timeline
~5–14 business days
Typical estimate — confirm current times with the Millcreek building department
Inspection process
- 1
Setup Inspection
Structure erected, anchored, exits clear, fire extinguishers in place
- 2
Removal Verification
Structure removed by permit expiration date, site restored
Tips
- Tents over 400 sq ft in Millcreek require a permit and flame-retardant certification.
- Temporary structures in Millcreek are typically limited to 180 days — extensions may be available.
- Construction dumpsters and pods in the public right-of-way may require a separate encroachment permit.
- Public events with temporary structures require both a building permit and an event permit from Millcreek.
Frequently asked questions
- Do I need a permit for a tent in Millcreek?
- Yes, for tents over 400 sq ft. Millcreek requires a temporary structure permit that covers fire safety, anchoring, and exit requirements. Smaller tents for personal use typically do not need a permit.
- How long can a temporary structure stay up in Millcreek?
- Temporary structure permits in Millcreek are typically valid for up to 180 days. The structure must be removed by the permit expiration date. Extensions may be available with a new application.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- Millcreek Building Department — official building department
- Greater Salt Lake MSD FY2026 Fee Schedule
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Millcreek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Millcreek
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.