Shed & Accessory Structure Permit in West Jordan, Utah

Required for detached garages, sheds, carports, and other accessory structures over 200 square feet in West Jordan.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building Permit$75-$300 based on square footage
Plan Review50-65% of permit fee

Review timeline

~514 business days

Typical estimate — confirm current times with the West Jordan building department

Inspection process

  1. 1

    Foundation

    Footings or slab prep before concrete pour

  2. 2

    Framing

    Structure framing, sheathing, and anchor connections

  3. 3

    Final

    Structure complete, roofing, siding, and any electrical or plumbing

Tips

Frequently asked questions

Do I need a permit for a shed in West Jordan?
It depends on size. Sheds under 200 sq ft and under 10 feet tall are typically exempt from building permits in West Jordan, but must still comply with setback requirements. Larger structures require a permit.
How close to the property line can I build a shed in West Jordan?
Accessory structures in West Jordan typically require a minimum 5-foot setback from side and rear property lines. Corner lots have additional restrictions. Always verify setbacks with West Jordan before building.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-06-27.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in West Jordan

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.