Mechanical / HVAC Permit — West Jordan, Utah · Requirements sheet
Verified 2026-07-01 · Source: https://www.westjordan.utah.gov/community-development/building-and-safety/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit in West Jordan, Utah
Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in West Jordan. Governed by the 2024 International Mechanical Code (IMC) as adopted per Utah Code § 15A-2-103, effective July 1, 2026 (superseded the 2021 edition).
Verified 2026-07-01 · Source
When you need this permit
- Furnace or boiler installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Fireplace or wood-burning stove installation
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Confirmed against the current West Jordan Consolidated Fee Schedule (Ord. Show full citationHide
Confirmed against the current West Jordan Consolidated Fee Schedule (Ord. 25-48, updated 3/6/2026, eff. through 6/30/2026), Building Permits item 3(c): 'Miscellaneous Minimum Permit (plumbing, electrical, mechanical) — $70.' Larger mechanical scopes tied to new construction are billed per the valuation-based building permit table (item 3a) instead.Review timeline
Inspection process
- 1
Rough-In
Ductwork and gas piping installed, before walls closed — verify clearances and support
- 2
Final
Equipment operational, combustion air verified, gas pressure tested, thermostat functional
See the full West Jordan inspection guide — scheduling & re-inspection fees →
Tips
- Like-for-like furnace and AC replacements in West Jordan still require a mechanical permit.
- West Jordan follows the 2024 IMC, effective July 1, 2026 (superseded the 2021 edition).
- High-efficiency furnaces require condensate drain lines — plan routing before installation.
- CO detectors are required on every level when gas appliances are installed.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
West Jordan's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for West Jordan yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when West Jordan lands. Privacy.
Other permits in West Jordan
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Utah →