Zoning Verification Letter / Certificate of Occupancy Inspection (Planning & Engineering) in West Jordan, Utah

West Jordan City Code § 13-1-9 ('Certificate of Occupancy and Zoning Compliance') makes it unlawful to use or occupy, or permit the use or occupancy of, any building, property, or premises prior to approval of a certificate of occupancy and zoning compliance, and separately makes it unlawful to occupy a property with a materially different design, greater intensity of use, or different occupancy classification than the one specifically approved — a change-of-use trigger distinct from new construction. A certificate is issued by the city administrator or a designee after a development/building is completed and has passed final inspection; a temporary certificate valid up to 6 months may be issued where zoning/site-plan conditions have been substantially, but not fully, met and the delay poses no hazard, backed by a cash bond (100% of estimated completion costs October-April; 150% May-September) that is released once all conditions are verified by inspection. Occupying without a certificate, or changing use/occupancy classification outside what the certificate approved, is a violation subject to prosecution, and unpermitted occupancy is declared a nuisance subject to abatement. The full section text is codified at codelibrary.amlegal.com; the operative language above is corroborated verbatim/near-verbatim across three independent published excerpts of the same section, cross-checked for internal consistency. Separately, per West Jordan's own FY2026 Consolidated Fee Schedule PDF: the Planning Division charges a separate, distinctly priced 'Zoning Verification Letter' ($150) under its Zoning fee category — the standard product used to confirm current zoning/use compliance for an existing building (e.g., for a business license, lease, or sale) without new construction — plus a distinct 'Certificate of Occupancy Inspection (Planning/Engineering)' fee ($290) under Development Review fees, separate from any Building Division inspection fee.

Verified 2026-07-20 · Source

When you need this permit

  • It is unlawful to use or occupy, or to permit the use or occupancy of, any building, property or premises prior to approval of a certificate of occupancy and zoning compliance, per § 13-1-9
  • It is unlawful to occupy, or allow the occupancy or use of, any property development, premises, or building with a materially different design, greater intensity of use, or different occupancy than specifically provided for in the approved certificate — the change-of-use trigger, per § 13-1-9
  • A certificate of occupancy and zoning compliance is issued by the city administrator or a designee after the property development/building is completed and has passed final inspection, per § 13-1-9
  • A temporary certificate (max 6 months) may be issued if the city administrator/designee determines in writing that zoning/site plan/other required approvals have been substantially met, that acceptable circumstances have delayed certain required improvements, and that the delay creates no hazard or safety concern, per § 13-1-9
  • A temporary certificate requires a cash bond: 100% of estimated completion costs if issued October through April, or 150% of estimated completion costs if issued May through September, per § 13-1-9
  • Zoning Verification Letter: request submitted to the Planning Division for confirmation of a parcel's current zoning designation and/or use compliance, independent of any active building permit
  • Certificate of Occupancy Inspection (Planning/Engineering): a Planning/Engineering-side site inspection distinct from the Building Division's own final inspection, verifying compliance with approved site plan/development conditions before a certificate of occupancy is issued
  • Zoning Administration / Interpretation / Determination: available on an hourly basis for formal staff determinations, including change-of-use classification questions

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Zoning Verification LetterWest Jordan FY2026 Consolidated Fee Schedule (Ord. 25-48, updated 3/6/2026, effective through 6/30/2026), 'PLANNING AND ENGINEERING' section, item 16(c) 'Zoning' — 'Zoning Verification Letter... $150.'
$150.00
Zoning Administration / Interpretation / DeterminationWest Jordan FY2026 Consolidated Fee Schedule (Ord. 25-48), 'PLANNING AND ENGINEERING' section, item 16(a).
$100.00 per hour
Certificate of Occupancy Inspection (Planning/Engineering)West Jordan FY2026 Consolidated Fee Schedule (Ord. 25-48), 'PLANNING AND ENGINEERING' section, item 6(g)(iii) under 'Development Reviews — Other Fees.' Separate from any Building Division final-inspection fee.
$290.00; first reinspection included at no charge; each additional reinspection after the first is $75.00

Review timeline

Plan review
Not published — contact the department

How long did your Zoning Verification Letter / Certificate of Occupancy Inspection (Planning & Engineering) permit actually take in West Jordan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (Certificate of Occupancy and Zoning Compliance)

    A certificate of occupancy and zoning compliance is issued by the city administrator or a designee only after the property development/building is completed and has passed final inspection, per § 13-1-9.

  2. 2

    Certificate of Occupancy Inspection (Planning/Engineering)

    Site-level Planning/Engineering inspection verifying compliance with approved development conditions, distinct from the Building Division's own final inspection. First reinspection is included at no charge; each additional reinspection is $75.00.

  3. 3

    Temporary Certificate Bond-Release Inspection

    Where a temporary certificate was issued against a cash bond (100%/150% of estimated completion costs, per § 13-1-9), an inspection must be scheduled with city staff to confirm all zoning/site plan/other approval conditions have since been met before the bond is released and permanent occupancy/use is granted.

See the full West Jordan inspection guide — scheduling & re-inspection fees →

Tips

  • West Jordan has no single, distinctly-named 'Change of Use Permit' product, but City Code § 13-1-9 ('Certificate of Occupancy and Zoning Compliance') makes occupying a property with a materially different design, greater intensity of use, or different occupancy classification than approved a violation subject to prosecution, and declares unpermitted occupancy a nuisance subject to abatement — that is the change-of-use trigger. The section is codified on codelibrary.amlegal.com; its operative provisions are corroborated across three independent indexed excerpts of the section text.
  • A temporary certificate of occupancy (up to 6 months) is available while certain site-plan improvements are still pending, but it requires a cash bond of 100% of estimated completion costs (October-April) or 150% (May-September) — budget for this if timing a project's occupancy around a seasonal cutoff.
  • The $150 Zoning Verification Letter is the most directly applicable product for someone needing to confirm zoning/use compliance for an existing building (e.g., for a business license, lease, or sale) without any active construction permit.
  • The $290 Certificate of Occupancy Inspection (Planning/Engineering) is billed separately from any Building Division final inspection fee — budget for both on projects that require site-plan-level Planning/Engineering sign-off.
  • For a formal written determination on whether a specific proposed use qualifies as a change of use requiring further review, the Zoning Administration/Interpretation/Determination fee ($100/hour) applies.

Frequently asked questions

West Jordan requires a zoning verification letter / certificate of occupancy inspection (planning & engineering) permit for: It is unlawful to use or occupy, or to permit the use or occupancy of, any building, property or premises prior to approval of a certificate of occupancy and zoning compliance, per § 13-1-9; It is unlawful to occupy, or allow the occupancy or use of, any property development, premises, or building with a materially different design, greater intensity of use, or different occupancy than specifically provided for in the approved certificate — the change-of-use trigger, per § 13-1-9; A certificate of occupancy and zoning compliance is issued by the city administrator or a designee after the property development/building is completed and has passed final inspection, per § 13-1-9; A temporary certificate (max 6 months) may be issued if the city administrator/designee determines in writing that zoning/site plan/other required approvals have been substantially met, that acceptable circumstances have delayed certain required improvements, and that the delay creates no hazard or safety concern, per § 13-1-9; A temporary certificate requires a cash bond: 100% of estimated completion costs if issued October through April, or 150% of estimated completion costs if issued May through September, per § 13-1-9; Zoning Verification Letter: request submitted to the Planning Division for confirmation of a parcel's current zoning designation and/or use compliance, independent of any active building permit; Certificate of Occupancy Inspection (Planning/Engineering): a Planning/Engineering-side site inspection distinct from the Building Division's own final inspection, verifying compliance with approved site plan/development conditions before a certificate of occupancy is issued; Zoning Administration / Interpretation / Determination: available on an hourly basis for formal staff determinations, including change-of-use classification questions. If your project isn't listed, confirm with West Jordan Building & Safety Division at (801) 569-5050 before starting work.

Yes. West Jordan's Planning Division charges $150.00 for a Zoning Verification Letter, per the FY2026 Consolidated Fee Schedule (Ord. 25-48) — the standard product for confirming a parcel's zoning and use compliance without an active building permit. A separate $290.00 Certificate of Occupancy Inspection (Planning/Engineering) fee applies to development-level site compliance verification, and formal zoning determinations are billed at $100.00 per hour.

West Jordan does not publish a plan-review timeline for this permit. Contact West Jordan Building & Safety Division at (801) 569-5050 for current turnaround.

You'll need: Zoning Verification Letter Request. See the required-documents checklist on this page for details on each.

West Jordan requires 3 inspection(s) for a zoning verification letter / certificate of occupancy inspection (planning & engineering) permit, in order: Final Inspection (Certificate of Occupancy and Zoning Compliance), Certificate of Occupancy Inspection (Planning/Engineering), Temporary Certificate Bond-Release Inspection. Schedule each through West Jordan Building & Safety Division ((801) 569-5050).

Apply through West Jordan Building & Safety Division at 8000 South Redwood Road, West Jordan, UT 84088. Phone: (801) 569-5050, email: wjplanning@westjordan.utah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.westjordan.utah.gov/community-development/building-and-safety/.

Per City Code § 13-1-9, it is unlawful to occupy, or allow the occupancy or use of, any property development, premises, or building that has a materially different design, greater intensity of use, or different occupancy than specifically provided for in the approved certificate of occupancy and zoning compliance. Occupying without a certificate, or exceeding what the certificate approved, is a violation subject to prosecution, and the city may treat unpermitted occupancy as a nuisance subject to abatement.

Yes. Per § 13-1-9, a temporary certificate valid for up to 6 months may be issued if the city administrator or designee determines in writing that zoning/site plan conditions have been substantially (but not fully) met, that the delay in finishing certain improvements won't create a hazard, and a cash bond is posted — 100% of estimated completion costs if issued October through April, or 150% if issued May through September. The bond is released once a follow-up inspection confirms all conditions have been met.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

West Jordan's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for West Jordan yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when West Jordan lands. Privacy.