Commercial Building Permit in West Jordan, Utah
Required for new commercial construction in West Jordan, valuation-based per the FY-2026 Consolidated Fee Schedule (Ord. 25-48), using the same Building Permit valuation table applied to all building permits. Regulated by the state-adopted 2024 IBC per Utah Code § 15A-2-103.
Verified 2026-07-19 · Source
When you need this permit
- New commercial building construction
- Plans, plot plan, and supporting documents (structural calculations, ComCheck, geotechnical report for non-residential projects) uploaded to the online permit portal as PDF
- Compliance with the 2024 IBC and West Jordan's adopted Design Criteria
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour, per standard IBC inspection sequence.
- 2
Framing
After framing, sheathing, and roof installed.
- 3
Final
All work complete before occupancy.
See the full West Jordan inspection guide — scheduling & re-inspection fees →
Tips
- Non-residential (commercial) plan review is billed at 65% of the building permit fee — the same rate for both new construction and tenant improvement/remodel work; West Jordan does not publish a separate TI fee tier.
- Allow up to 21 business days for the initial commercial plan review (vs. 10 business days for residential); resubmitted corrections are reviewed within 5 business days.
- A $12 permit processing fee and 1% state surcharge apply on top of the valuation-based building permit fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in West Jordan.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in West Jordan
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →