Commercial Building Permit in West Jordan, Utah

Required for new commercial construction in West Jordan, valuation-based per the FY-2026 Consolidated Fee Schedule (Ord. 25-48), using the same Building Permit valuation table applied to all building permits. Regulated by the state-adopted 2024 IBC per Utah Code § 15A-2-103.

Verified 2026-07-19 · Source

When you need this permit

  • New commercial building construction
  • Plans, plot plan, and supporting documents (structural calculations, ComCheck, geotechnical report for non-residential projects) uploaded to the online permit portal as PDF
  • Compliance with the 2024 IBC and West Jordan's adopted Design Criteria

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit — valuation $1–$2,000West Jordan Consolidated Fee Schedule, Ord. 25-48 (eff. through June 30, 2026, updated March 6, 2026). Valuation determined by ICC Building Valuation Data as of July 1 of each year. Same table used for all building permits, including commercial.
$60.50 base + $3.70 per each additional $100 (or fraction thereof) over $500
Building Permit — valuation $2,001–$25,000West Jordan Consolidated Fee Schedule, Ord. 25-48
$116.00 base + $16.90 per each additional $1,000 (or fraction thereof) over $2,000
Building Permit — valuation $25,001–$50,000West Jordan Consolidated Fee Schedule, Ord. 25-48
$505.00 base + $12.20 per each additional $1,000 (or fraction thereof) over $25,000
Building Permit — valuation $50,001–$100,000West Jordan Consolidated Fee Schedule, Ord. 25-48
$810.00 base + $8.45 per each additional $1,000 (or fraction thereof) over $50,000
Building Permit — valuation $100,001–$500,000West Jordan Consolidated Fee Schedule, Ord. 25-48
$1,233.00 base + $6.76 per each additional $1,000 (or fraction thereof) over $100,000
Building Permit — valuation $500,001–$1,000,000West Jordan Consolidated Fee Schedule, Ord. 25-48
$3,938.00 base + $5.75 per each additional $1,000 (or fraction thereof) over $500,000
Building Permit — valuation over $1,000,000West Jordan Consolidated Fee Schedule, Ord. 25-48
$6,803.00 base + $3.80 per each additional $1,000 (or fraction thereof) over $1,000,000
Plan Review — Non-ResidentialWest Jordan Consolidated Fee Schedule, Ord. 25-48: 'c) Non-Residential ... 65% of the building permit fee.' Applies to both new commercial construction and tenant improvement/remodel work — the fee schedule does not split these into separate tiers.
65% of the building permit fee
Permit Processing FeeWest Jordan Consolidated Fee Schedule, Ord. 25-48
$12 per permit issued
State SurchargeWest Jordan Consolidated Fee Schedule, Ord. 25-48
1% of the building permit fee

Review timeline

Plan reviewWest Jordan’s published plan-review target
Up to 21 business days

How long did your Commercial Building Permit permit actually take in West Jordan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footing

    Before concrete pour, per standard IBC inspection sequence.

  2. 2

    Framing

    After framing, sheathing, and roof installed.

  3. 3

    Final

    All work complete before occupancy.

See the full West Jordan inspection guide — scheduling & re-inspection fees →

Tips

  • Non-residential (commercial) plan review is billed at 65% of the building permit fee — the same rate for both new construction and tenant improvement/remodel work; West Jordan does not publish a separate TI fee tier.
  • Allow up to 21 business days for the initial commercial plan review (vs. 10 business days for residential); resubmitted corrections are reviewed within 5 business days.
  • A $12 permit processing fee and 1% state surcharge apply on top of the valuation-based building permit fee.

Frequently asked questions

West Jordan requires a commercial building permit for: New commercial building construction; Plans, plot plan, and supporting documents (structural calculations, ComCheck, geotechnical report for non-residential projects) uploaded to the online permit portal as PDF; Compliance with the 2024 IBC and West Jordan's adopted Design Criteria. If your project isn't listed, confirm with West Jordan Building & Safety Division at (801) 569-5050 before starting work.

West Jordan calculates the building permit fee from a valuation table (e.g., $6,803 base + $3.80 per additional $1,000 over $1,000,000 in project valuation), plus a Non-Residential plan review fee of 65% of the building permit fee, a $12 permit processing fee, and a 1% state surcharge — per the FY-2026 Consolidated Fee Schedule (Ord. 25-48).

West Jordan's Permit Portal Guide states commercial submittals get up to 21 business days for the initial review (vs. 10 business days for residential), with corrections reviewed within 5 business days.

You'll need: Construction Plans and Plot Plan; Structural Calculations; ComCheck / Energy Code Compliance Report; Geotechnical Report. See the required-documents checklist on this page for details on each.

West Jordan requires 3 inspection(s) for a commercial building permit, in order: Foundation / Footing, Framing, Final. Schedule each through West Jordan Building & Safety Division ((801) 569-5050).

Apply through West Jordan Building & Safety Division at 8000 South Redwood Road, West Jordan, UT 84088. Phone: (801) 569-5050, email: wjplanning@westjordan.utah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.westjordan.utah.gov/community-development/building-and-safety/.

West Jordan, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(a)); West Jordan's own Design Criteria document (rev. 10/2025) predates this transition — see NOTE below; 2021 International Residential Code (IRC), including Appendix AQ — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b)); 2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(d)); 2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(e)); 2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(f)); 2024 International Energy Conservation Code (IECC) — currently in effect statewide as of July 1, 2026, a single edition with no residential/commercial split under current law (Utah Code § 15A-2-103(1)(h)); Historical (superseded): West Jordan's Design Criteria document (rev. 10/2025) had cited a 2015 IECC edition for residential and a separate 2021 IECC edition for commercial — both are now superseded by the single 2024 IECC per § 15A-2-103(1)(h); not independently re-fetched on 2026-07-16 (the Design Criteria PDF was not located live this session — West Jordan's Building & Safety page links a 'Codes & Design Criteria' resource but the document content was not directly accessible), so whether the city has updated this document is unconfirmed as of this date; 2024 International Existing Building Code (IEBC) — currently in effect as of July 1, 2026, superseding the 2021 IEBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(i)); 2021 International Fire Code (IFC) — West Jordan Design Criteria (rev. 10/2025) (not adopted under Utah Code § 15A-2-103, which does not list an IFC edition; edition unconfirmed for the current period); 2023 National Electrical Code (NEC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(g)); 1997 Uniform Code for Abatement of Dangerous Buildings — West Jordan Design Criteria (rev. 10/2025); NOTE (updated 2026-07-16): the July 1, 2026 transition forecast in the prior version of this entry has now occurred — confirmed live against Utah Code § 15A-2-103, current version (effective 7/1/2026, superseded 1/1/2027), read at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html. West Jordan's Building & Safety Division webpage (westjordan.utah.gov/community-development/building-and-safety/), checked live 2026-07-16, still hosts a downloadable 'Special Inspection Agreement' form labeled '2021 IBC' — consistent with the Design Criteria document (rev. 10/2025) predating the statewide transition; confirm current status with the Building & Safety Division for any project submitted on or after July 1, 2026. Local amendments apply — see the West Jordan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in West Jordan.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.