Residential Building Permit — West Jordan, Utah · Requirements sheet
Verified 2026-06-29 · Source: https://www.westjordan.utah.gov/community-development/building-and-safety/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in West Jordan, Utah
Required for new residential construction, additions, and structural alterations in West Jordan. Permit fees are valuation-based using the ICC Building Valuation Data table. Valuation is determined by the current ICC Building Valuation Data published as of July 1 of each year.
Verified 2026-06-29 · Source
When you need this permit
- New single-family or multi-family residential construction
- Additions or structural modifications
- Conversion of non-habitable space to habitable space
- Any work requiring plan review under West Jordan City Code Title 10
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation or wall cover
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
See the full West Jordan inspection guide — scheduling & re-inspection fees →
Tips
- Apply online at permit.westjordan.utah.gov — the West Jordan Public Portal. Download the Online Building Permit Submittal Instructions PDF from westjordan.utah.gov/community-development/building-and-safety/ for step-by-step guidance.
- All residential site plans must include dimensions, setbacks, driveway width (18 ft minimum, 30 ft maximum at back of sidewalk), easements, and a drainage arrow per the West Jordan Residential Site Plan Checklist.
- West Jordan's seismic design category is D2 (residential) — engineered foundations may be required for larger footprints. See the Design Criteria document at westjordan.utah.gov for site-specific requirements.
- Frost depth is 30 inches; ground snow load is 28 psf at or below 4,239 ft MSL. Confirm loads at utahsnowload.usu.edu for elevations above 4,239 ft.
- West Jordan follows Utah Code Title 15A — as of July 1, 2026, 2024 IBC replaces 2021 IBC. Projects submitted before that date are reviewed under the codes in effect at submission.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in West Jordan
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your West Jordan project checklist
Describe your project once and get every permit, document, and fee it triggers in West Jordan — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →