Water Heater Permit in West Jordan, Utah

Required for water heater installation, replacement, or conversion in West Jordan. This is a subset of the plumbing permit; the $70 miscellaneous minimum permit fee applies.

Verified 2026-07-01 · Source

When you need this permit

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet — 0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Water Heater / Plumbing Permit (minimum fee)
Confirmed against the current West Jordan Consolidated Fee Schedule (Ord. Show full citationConfirmed against the current West Jordan Consolidated Fee Schedule (Ord. 25-48, updated 3/6/2026, eff. through 6/30/2026), Building Permits item 3(c): 'Miscellaneous Minimum Permit (plumbing, electrical, mechanical) — $70.' Water heater work is a plumbing sub-scope and is billed at this flat minimum.
$70
Permit Processing FeeWest Jordan Consolidated Fee Schedule, Ord. 25-48
$12 per permit issued
State SurchargeWest Jordan Consolidated Fee Schedule, Ord. 25-48
1% of the building permit fee
Re-InspectionWest Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections
$75

Review timeline

Plan reviewTypical estimate — confirm current times with the West Jordan building department
~1–3 business days

How long did your Water Heater Permit permit actually take in West Jordan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verify proper installation, venting, T&P valve discharge, gas connections, and seismic strapping

See the full West Jordan inspection guide — scheduling & re-inspection fees →

Tips

  • Water heater permits in West Jordan are typically among the fastest to obtain — apply online and expect quick turnaround.
  • Gas water heaters require proper venting — high-efficiency units use PVC/CPVC vent, standard units use metal B-vent.
  • Seismic strapping is required in Utah — two straps, at the upper third and lower third of the tank.
  • T&P (temperature and pressure) relief valve discharge must terminate to within 6 inches of the floor or to the exterior per the adopted plumbing code.

Frequently asked questions

Yes. West Jordan requires a permit for all water heater replacements, including like-for-like swaps. The minimum permit fee is $70 per the Consolidated Fee Schedule (Ord. 25-48), plus a $12 processing fee and 1% state surcharge. Utah allows homeowners to pull this permit for their own primary residence.

In West Jordan, the published Water Heater / Plumbing Permit (minimum fee) is: $70. Additional published fees: Permit Processing Fee — $12 per permit issued; State Surcharge — 1% of the building permit fee; Re-Inspection — $75. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a water heater permit in West Jordan typically runs 1–3 business days. This is an estimate, not a published figure — confirm current review times with West Jordan Building & Safety Division at (801) 569-5050.

You'll need: Building Permit Application (via West Jordan Public Portal). Depending on your project, West Jordan may also ask for: Contractor License. See the required-documents checklist on this page for details on each.

West Jordan requires 1 inspection(s) for a water heater permit, in order: Final. Schedule each through West Jordan Building & Safety Division ((801) 569-5050).

Apply through West Jordan Building & Safety Division at 8000 South Redwood Road, West Jordan, UT 84088. Phone: (801) 569-5050, email: wjplanning@westjordan.utah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.westjordan.utah.gov/community-development/building-and-safety/.

West Jordan, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(a)); West Jordan's own Design Criteria document (rev. 10/2025) predates this transition — see NOTE below; 2021 International Residential Code (IRC), including Appendix AQ — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b)); 2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(d)); 2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(e)); 2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(f)); 2024 International Energy Conservation Code (IECC) — currently in effect statewide as of July 1, 2026, a single edition with no residential/commercial split under current law (Utah Code § 15A-2-103(1)(h)); Historical (superseded): West Jordan's Design Criteria document (rev. 10/2025) cited a 2015 IECC edition for residential and a separate 2021 IECC edition for commercial — both are now superseded by the single 2024 IECC per § 15A-2-103(1)(h). West Jordan's Building & Safety page links a 'Codes & Design Criteria' resource, but the Design Criteria PDF itself is not currently accessible there, so whether the city has updated this document remains unconfirmed.; 2024 International Existing Building Code (IEBC) — currently in effect as of July 1, 2026, superseding the 2021 IEBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(i)); 2021 International Fire Code (IFC) — West Jordan Design Criteria (rev. 10/2025) (not adopted under Utah Code § 15A-2-103, which does not list an IFC edition; edition unconfirmed for the current period); 2023 National Electrical Code (NEC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(g)); 1997 Uniform Code for Abatement of Dangerous Buildings — West Jordan Design Criteria (rev. 10/2025); NOTE (updated 2026-07-16): the July 1, 2026 transition forecast in the prior version of this entry has now occurred — confirmed live against Utah Code § 15A-2-103, current version (effective 7/1/2026, superseded 1/1/2027), read at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html. West Jordan's Building & Safety Division webpage (westjordan.utah.gov/community-development/building-and-safety/), checked live 2026-07-16, still hosts a downloadable 'Special Inspection Agreement' form labeled '2021 IBC' — consistent with the Design Criteria document (rev. 10/2025) predating the statewide transition; confirm current status with the Building & Safety Division for any project submitted on or after July 1, 2026. Local amendments apply — see the West Jordan overview page for the full list.

Utah law allows homeowners to perform plumbing work including water heater replacement in their own primary residence, but a permit from West Jordan and a final inspection are still required.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

West Jordan's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for West Jordan yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when West Jordan lands. Privacy.