West Jordan building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in West Jordan, Utah.

Verified 2026-06-29 · Source

How to schedule

Inspections are requested through the building department below.

Address
8000 South Redwood Road, West Jordan, UT 84088
Phone
(801) 569-5050
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Inspection sequence

Applies to: Accessory Dwelling Unit (ADU)

  1. 1

    Foundation

    Footings, forms, rebar — before concrete pour

  2. 2

    Framing

    Structure, fire separation if applicable, egress windows

  3. 3

    MEP Rough-In

    Mechanical, electrical, plumbing rough-ins before walls closed

  4. 4

    Insulation

    Insulation and vapor barrier before drywall

  5. 5

    Final

    All work complete, smoke/CO detectors, address posted, ready for occupancy

Applies to: Basement Finish Permit

  1. 1

    Framing

    Wall framing, fire blocking, egress window wells and openings

  2. 2

    MEP Rough-In

    Electrical, plumbing, and HVAC rough-ins before walls closed

  3. 3

    Insulation

    Insulation on exterior walls, vapor barrier placement

  4. 4

    Final

    Drywall, fixtures, smoke/CO detectors, and all finishes complete

Applies to: Residential Building Permit

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts

  2. 2

    Framing

    After framing, sheathing, and roof — before insulation or wall cover

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete, ready for occupancy

Applies to: Commercial Building Permit

  1. 1

    Foundation / Footing

    Before concrete pour, per standard IBC inspection sequence.

  2. 2

    Framing

    After framing, sheathing, and roof installed.

  3. 3

    Final

    All work complete before occupancy.

Applies to: Deck Permit

  1. 1

    Footing

    Before concrete pour — verify footing depth (minimum 30 inches per frost depth) and size

  2. 2

    Framing

    After framing complete — ledger, joists, beams, and railing posts

  3. 3

    Final

    All work complete per approved plans, including railing height and guards

Applies to: Electrical Permit

  1. 1

    Rough-In

    After wiring installed, before walls closed — verify box placement, wire sizing, and proper support

  2. 2

    Service / Panel

    Panel installation, grounding electrode system, service entrance conductors

  3. 3

    Final

    All devices installed, GFCI/AFCI protection verified, panel labeled

Applies to: Plumbing Permit

  1. 1

    Underground / Slab

    Before concrete pour — verify pipe slope, materials, and cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed — pressure test required

  3. 3

    Final

    All fixtures connected, water flowing, no leaks, proper venting verified

Applies to: Zoning Verification Letter / Certificate of Occupancy Inspection (Planning & Engineering)

  1. 1

    Final Inspection (Certificate of Occupancy and Zoning Compliance)

    A certificate of occupancy and zoning compliance is issued by the city administrator or a designee only after the property development/building is completed and has passed final inspection, per § 13-1-9.

  2. 2

    Certificate of Occupancy Inspection (Planning/Engineering)

    Site-level Planning/Engineering inspection verifying compliance with approved development conditions, distinct from the Building Division's own final inspection. First reinspection is included at no charge; each additional reinspection is $75.00.

  3. 3

    Temporary Certificate Bond-Release Inspection

    Where a temporary certificate was issued against a cash bond (100%/150% of estimated completion costs, per § 13-1-9), an inspection must be scheduled with city staff to confirm all zoning/site plan/other approval conditions have since been met before the bond is released and permanent occupancy/use is granted.

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Framing / Structural

    Where applicable to the tenant-improvement scope, before close-in.

  2. 2

    Final

    All work complete before occupancy.

Applies to: Demolition Permit

  1. 1

    Pre-Demolition

    Verify utility disconnects, Air Quality approval, and Health Department pre-demolition inspection are complete before work begins

  2. 2

    Final / Site Clear

    Site cleared, foundation removed or capped, erosion control in place

Applies to: EV Charger / EVSE Permit

  1. 1

    Service / Panel

    Panel installation, grounding electrode system, service entrance conductors serving the EV charger circuit

  2. 2

    Final

    Charger installed and operational, GFCI/AFCI protection verified where required, panel labeled

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and gas piping installed, before walls closed — verify clearances and support

  2. 2

    Final

    Equipment operational, combustion air verified, gas pressure tested, thermostat functional

Applies to: Roofing Permit

  1. 1

    Deck / Substrate

    After tear-off — verify sheathing condition and replace damaged decking before proceeding

  2. 2

    Final

    Completed roof — verify ice and water shield, flashing, drip edge, ventilation, and nailing pattern

Applies to: Solar Panel Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final / Structural

    Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified

Re-inspection fees

Residential Building PermitRe-Inspection / Other Building Inspection · West Jordan Consolidated Fee Schedule, Ord. 25-48 (Building Inspections — Other Building Inspections, including re-inspection fees)
$75
Electrical PermitRe-Inspection · West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections
$75
Plumbing PermitRe-Inspection · West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections
$75
Mechanical / HVAC PermitRe-Inspection · West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections
$75
Roofing PermitRe-Inspection · West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections
$75
Water Heater PermitRe-Inspection · West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections
$75
Deck PermitRe-Inspection · West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections
$75
Zoning Verification Letter / Certificate of Occupancy Inspection (Planning & Engineering)Certificate of Occupancy Inspection (Planning/Engineering) · West Jordan FY2026 Consolidated Fee Schedule (Ord. 25-48), 'PLANNING AND ENGINEERING' section, item 6(g)(iii) under 'Development Reviews — Other Fees.' Separate from any Building Division final-inspection fee.
$290.00; first reinspection included at no charge; each additional reinspection after the first is $75.00

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

West Jordan building permits

Get alerts for West Jordan

We'll email you when West Jordan's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.