How to schedule
Inspections are requested through the building department below.
- Address
- 110 S. Center Street, Santaquin, UT 84655
- Phone
- (801) 754-1011
- Office hours
- Mon–Thu 9:00 AM – 5:00 PM, Fri 9:00 AM – 1:00 PM
- Website
- Official site
Published scheduling rules
- Inspections must be scheduled at least 24 hours in advance by calling (801) 754-1011 during office hours (Mon–Thu 9 AM–5 PM, Fri 9 AM–1 PM); to get a Monday inspection, call by 1 PM the preceding Friday. (Residential Building Permit)
Inspection sequence
Applies to: Residential Building Permit
- 1
Footings / Setbacks
Required Building Inspection Checklist item 1, per Santaquin City's official checklist.
- 2
Foundation
Required Building Inspection Checklist item 2.
- 3
Under-Slab Plumbing / Under-Slab Heating
Required Building Inspection Checklist items 3–4.
- 4
Water Lateral / Sewer Lateral
Required Building Inspection Checklist items 5–6.
- 5
Temporary Power / Underground Power Trench / Permanent Power
Required Building Inspection Checklist items 7–9.
- 6
Bond Beam / Shear Panels / Tie Downs
Required Building Inspection Checklist items 10–11.
- 7
4-Way (Rough Plumbing, Rough Electrical, Rough Heating, Framing)
Combined rough-in inspection, Required Building Inspection Checklist item 12.
- 8
Gas Piping / Masonry Veneer-Moisture Barrier / Stucco-Lath / Drywall / Insulation
Required Building Inspection Checklist items 13–17; an Insulation Certificate must be attached.
- 9
Water Meter
Required Building Inspection Checklist item 18.
- 10
Final
Required Building Inspection Checklist item 19, including site grading, curb & gutter, sidewalk, driveways & streets.
Applies to: Accessory Structure Building Permit
- 1
Footings / Foundation
Required if the accessory structure has a foundation plan submitted.
- 2
Framing
Framing inspection per the Required Building Inspection Checklist.
- 3
Final
Final inspection to close out the accessory-structure permit.
Applies to: Basement Finish Permit
- 1
4-Way (Rough Plumbing, Rough Electrical, Rough Heating, Framing)
Applicable rough-in inspections for basement finish work, per Santaquin's Required Building Inspection Checklist.
- 2
Insulation / Drywall
Insulation Certificate must be attached before the insulation inspection; drywall inspection follows framing/rough-in sign-off.
- 3
Final
Final inspection to close out the basement-finish permit.
Applies to: Commercial Building Permit
- 1
Footings / Foundation
Before concrete pour, per Santaquin's Required Building Inspection Checklist (items 1–2), applied to any structure type.
- 2
Under-Slab / Rough-In (4-Way)
Combined rough plumbing, rough electrical, rough heating, and framing inspection per the Required Building Inspection Checklist item 12.
- 3
Final
Required Building Inspection Checklist item 19, all work complete before occupancy.
Applies to: Solar PV (Photovoltaic) Installation Permit
- 1
Building / Structural Inspection
Verifies roof or ground-mount structural attachment per submitted plans.
- 2
Electrical Inspection
Verifies the PV system's electrical tie-in (inverter, disconnect, interconnection wiring) per the 2023 NEC.
- 3
Final
Final inspection to close out the permit before the system is energized.
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Framing / Structural
Wall sections and rebar verified per submitted plans before close-in, where structural work is part of the scope.
- 2
Final
All work complete before occupancy.
Final inspection only: EV Charger / EVSE Permit, Fire Alarm System Permit, Fire Sprinkler System Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santaquin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Santaquin building permits
Get alerts for Santaquin
We'll email you when Santaquin's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.