Santaquin City's Fire/EMS Department charges a distinct, square-footage-tiered permit fee for new fire alarm system installations, set out in the city's Fee Schedule (Resolution No. 06-04-2026) under Fire/EMS Department Permit Fees.

Verified 2026-07-20 · Source

When you need this permit

  • Fire alarm system installations are billed by building square footage tier (under or over 6,000 sq ft), per Santaquin City Fee Schedule (Resolution No. 06-04-2026), Fire/EMS Department Permit Fees

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fire Alarm System Installation — under 6,000 sq ftSantaquin City Fee Schedule, Resolution No. 06-04-2026, Fire/EMS Department Permit Fees table, fetched directly 2026-07-20 (ut-santaquin.civicplus.com/DocumentCenter/View/5979).
$200.00
Fire Alarm System Installation — over 6,000 sq ftSame source as above.
$300.00

Review timeline

Plan review
Not published — contact the department

How long did your Fire Alarm System Permit permit actually take in Santaquin?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Special/Follow-up Inspection

    Santaquin's fee schedule lists a general $200.00 Special/Follow-up Inspection fee under the same Fire/EMS Department Inspections/Plan Review Fees section; confirm with the Fire/EMS Department whether this applies to fire alarm installations specifically.

See the full Santaquin inspection guide — scheduling & re-inspection fees →

Tips

  • Santaquin's fire alarm permit fee has only two size tiers (under/over 6,000 sq ft), simpler than the head-count tiering used for fire sprinkler permits in the same fee schedule.

Frequently asked questions

Santaquin requires a fire alarm system permit for: Fire alarm system installations are billed by building square footage tier (under or over 6,000 sq ft), per Santaquin City Fee Schedule (Resolution No. 06-04-2026), Fire/EMS Department Permit Fees. If your project isn't listed, confirm with Santaquin City Building and Safety Division (Community Development Department) at (801) 754-1011 before starting work.

Per Santaquin City's Fee Schedule (Resolution No. 06-04-2026), new fire alarm system installations cost $200.00 for buildings under 6,000 sq ft, or $300.00 for buildings over 6,000 sq ft.

Santaquin does not publish a plan-review timeline for this permit. Contact Santaquin City Building and Safety Division (Community Development Department) at (801) 754-1011 for current turnaround.

You'll need: Fire Alarm System Permit Application. See the required-documents checklist on this page for details on each.

Santaquin requires 1 inspection(s) for a fire alarm system permit, in order: Special/Follow-up Inspection. Schedule each through Santaquin City Building and Safety Division (Community Development Department) ((801) 754-1011).

Apply through Santaquin City Building and Safety Division (Community Development Department) at 110 S. Center Street, Santaquin, UT 84655. Phone: (801) 754-1011. Office hours: Mon–Thu 9:00 AM – 5:00 PM, Fri 9:00 AM – 1:00 PM. Official information: https://ut-santaquin.civicplus.com/1479/Building-Permits.

Santaquin, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Santaquin's Building Department page (live-checked 2026-07-16) states generically that the division enforces 'health, safety, International Building Code, and City Code requirements' without itemizing an edition year.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Santaquin's official fee schedule and basement-finish/accessory-structure submittal packets repeatedly reference 'the current Building Valuation Data sheet from the IRC' (a cost-valuation table, not an edition-year assertion).; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized anywhere on Santaquin's own Building Department pages, added here per statute.; 2024 International Plumbing Code (IPC) — CORRECTED: this file previously combined IPC/IMC/IECC into one undated entry described as tracking 'alongside the IBC/IRC,' which is no longer accurate now that IBC (2024), IRC (2021), and these trade codes (2024) diverge in edition year. CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); Santaquin does not publish a separate municipal amendment to this trade code.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); Santaquin does not publish a separate municipal amendment to this trade code.; 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); Santaquin does not publish a separate municipal amendment to this trade code.; 2023 National Electrical Code (NEC) — statewide per Utah Code § 15A-2-103(1)(g); MISSING ENTIRELY from this file's prior codesAdopted list despite being a statute-mandated code — added here since electrical work is explicitly listed among Santaquin's permit-required categories (see 'Do You Need a Permit?' form) but no electrical-code edition was itemized anywhere on the City's own pages.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; Santaquin City Code — local building-permit administration and requirements (permit-required project list, accessory-structure setback/fire-rating rules, sign-permit rules) are published on the Building Department's official pages (ut-santaquin.civicplus.com); the full underlying municipal code text (historically hosted at sterlingcodifiers.com, book_id=303) was not renderable via automated fetch as of this file's verification date (the sterlingcodifiers.com domain did not resolve/timed out on repeated attempts) — the specific requirements below are sourced directly from Santaquin's own Building Department PDFs and pages, not from the codifier mirror.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Santaquin's Building Department page (ut-santaquin.civicplus.com/1478/Building-Department) was live-checked 2026-07-16 and states only the generic phrase 'International Building Code' with no edition year and no separate mention of IRC/IPC/IMC/IECC/NEC at all — so no page-vs-statute lag could be detected; the statute is cited directly as governing throughout. This re-verification also corrected a genuine defect: NEC was entirely absent from the prior codesAdopted list, and IPC/IMC/IECC had been lumped into one undated entry implying they track IBC/IRC in lockstep, which stopped being accurate once IBC (2024) and IRC (2021) diverged.. Local amendments apply — see the Santaquin overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santaquin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.