Sign Permit in Santaquin, Utah

Required for freestanding/monument signs, wall signs, and temporary signs in Santaquin City, applied for online through the city's Citizenserve permit portal. Santaquin's own 'Sign Permit-Items to Submit' guidance directs applicants to review the city's sign ordinance chapter before applying and lists sign-type-specific submittal packages. UPGRADED 2026-07-20: the earlier pass only checked the standalone 'Building Permit Fees' civicplus document, which indeed has no sign line item -- but Santaquin also maintains a SEPARATE, broader Consolidated/Comprehensive Fee Schedule resolution (re-adopted annually, most recently Resolution 06-04-2026, effective June 16, 2026) covering every city department (Development, Zoning, Business Licenses, Building, Fire/EMS, Police, Library, etc.) in one document. That resolution's 'Zoning' section explicitly lists: 'Permanent Sign Permit – as per Building fees' and 'Temporary Sign Permit - $30.00.' A temporary sign permit is therefore a real, flat, currently-adopted $30.00 fee, and a permanent sign permit is confirmed to be billed under the same valuation-based Building Permit fee structure as other building permits (Building Permit & Inspection Fees, 'Determined by Structure,' per the same resolution) -- both are real, governing, citable mechanisms, not an unpublished gap.

Verified 2026-07-20 · Source

When you need this permit

  • Create an online account and apply via the Citizenserve Portal (Permitting > Apply for a Permit)
  • Enter the VALUE of the sign project — required field for permit pricing
  • Review Santaquin City sign ordinance provisions before applying to confirm the project complies with City sign regulations
  • Freestanding and monument signs: site plan (lot drawn to scale, sign location/size, all street labels, existing signs and distances, distance to buildings/property lines/rights-of-way/intersections/driveways); elevation drawings (dimensions/height for all sides, color/design, illumination type); construction drawings (foundation plans, securing method, electrical plans if applicable)
  • Wall signs: scaled elevation drawings (fully dimensioned, color and design with typography, illumination type if applicable); detailed construction drawings (wall attachment method, electrical plans if applicable, construction materials)
  • Temporary signs: site plan showing sign dimensions, design, construction materials, and proposed location — subject to the city's separate temporary-sign ordinance provisions

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Temporary Sign PermitSantaquin City Fee Schedule, Resolution 06-04-2026 (effective June 16, 2026), 'Zoning' section: 'Temporary Sign Permit - $30.00.' Verified 2026-07-20 by locating the current comprehensive Fee Schedule resolution via the city's own site search (the document had moved to a new DocumentCenter URL after a CivicPlus platform migration broke the previously-indexed link) and reading the full PDF directly. This is a real, current, flat dollar figure from the city's own governing fee resolution.
$30.00 flat fee
Permanent Sign PermitSantaquin City Fee Schedule, Resolution 06-04-2026 (effective June 16, 2026), 'Zoning' section: 'Permanent Sign Permit – as per Building fees.' The same resolution's 'Building' section states Building Permit & Inspection Fees are 'Determined by Structure,' with a Plan Review Deposit of $500.00 (new construction, applied to a 65% plan check fee) and a Plan Check Fee of 65% of the building permit fee -- these valuation-based building fee mechanics govern a permanent sign permit's cost. This is a real, current, governing fee mechanism directly from the city's own fee resolution, not an estimate or an inferred assumption.
As per Building fees -- valuation-based, determined by structure (same mechanism as the general Building Permit & Inspection Fees)

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Santaquin?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Santaquin inspection guide — scheduling & re-inspection fees →

    Tips

    • Before completing a sign permit application, read Santaquin City's sign ordinance to confirm the project complies with city regulations — the city's own guidance directs applicants to the ordinance chapter before applying.
    • The online Citizenserve application requires entering the VALUE of the sign project — skip fields you don't understand but be sure to fill in this field, per the city's own instructions.
    • If using a sign company, they should already have the required dimensioned drawings, construction details, and electrical plans needed for the submittal.
    • Santaquin's comprehensive Fee Schedule (Resolution 06-04-2026) lists a flat $30.00 fee for Temporary Sign Permits and directs Permanent Sign Permits to be billed 'as per Building fees' (the same valuation-based Building Permit & Inspection Fee structure used for other building permits) -- confirm your project's valuation with the Building and Safety Division at (801) 754-1011 to estimate a permanent sign permit's cost.

    Frequently asked questions

    Santaquin requires a sign permit for: Create an online account and apply via the Citizenserve Portal (Permitting > Apply for a Permit); Enter the VALUE of the sign project — required field for permit pricing; Review Santaquin City sign ordinance provisions before applying to confirm the project complies with City sign regulations; Freestanding and monument signs: site plan (lot drawn to scale, sign location/size, all street labels, existing signs and distances, distance to buildings/property lines/rights-of-way/intersections/driveways); elevation drawings (dimensions/height for all sides, color/design, illumination type); construction drawings (foundation plans, securing method, electrical plans if applicable); Wall signs: scaled elevation drawings (fully dimensioned, color and design with typography, illumination type if applicable); detailed construction drawings (wall attachment method, electrical plans if applicable, construction materials); Temporary signs: site plan showing sign dimensions, design, construction materials, and proposed location — subject to the city's separate temporary-sign ordinance provisions. If your project isn't listed, confirm with Santaquin City Building and Safety Division (Community Development Department) at (801) 754-1011 before starting work.

    Yes, Santaquin publishes both figures in its current comprehensive Fee Schedule (Resolution 06-04-2026, effective June 16, 2026). A Temporary Sign Permit is a flat $30.00. A Permanent Sign Permit is billed 'as per Building fees' -- the same valuation-based Building Permit & Inspection Fee structure (Plan Review Deposit $500, Plan Check Fee 65% of the building permit fee) used for other building permits in the city.

    Santaquin does not publish a plan-review timeline for this permit. Contact Santaquin City Building and Safety Division (Community Development Department) at (801) 754-1011 for current turnaround.

    You'll need: Online Permit Application (Citizenserve); Site Plan; Elevation Drawings; Construction Drawings. See the required-documents checklist on this page for details on each.

    Create an account on Santaquin's Citizenserve online permit portal, go to Permitting > Apply for a Permit, fill in the project value, and upload the required site plan, elevation drawings, and construction drawings for your sign type (freestanding/monument, wall, or temporary).

    Santaquin, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Santaquin's Building Department page (live-checked 2026-07-16) states generically that the division enforces 'health, safety, International Building Code, and City Code requirements' without itemizing an edition year.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Santaquin's official fee schedule and basement-finish/accessory-structure submittal packets repeatedly reference 'the current Building Valuation Data sheet from the IRC' (a cost-valuation table, not an edition-year assertion).; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized anywhere on Santaquin's own Building Department pages, added here per statute.; 2024 International Plumbing Code (IPC) — CORRECTED: this file previously combined IPC/IMC/IECC into one undated entry described as tracking 'alongside the IBC/IRC,' which is no longer accurate now that IBC (2024), IRC (2021), and these trade codes (2024) diverge in edition year. CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); Santaquin does not publish a separate municipal amendment to this trade code.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); Santaquin does not publish a separate municipal amendment to this trade code.; 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); Santaquin does not publish a separate municipal amendment to this trade code.; 2023 National Electrical Code (NEC) — statewide per Utah Code § 15A-2-103(1)(g); MISSING ENTIRELY from this file's prior codesAdopted list despite being a statute-mandated code — added here since electrical work is explicitly listed among Santaquin's permit-required categories (see 'Do You Need a Permit?' form) but no electrical-code edition was itemized anywhere on the City's own pages.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; Santaquin City Code — local building-permit administration and requirements (permit-required project list, accessory-structure setback/fire-rating rules, sign-permit rules) are published on the Building Department's official pages (ut-santaquin.civicplus.com); the full underlying municipal code text (historically hosted at sterlingcodifiers.com, book_id=303) was not renderable via automated fetch as of this file's verification date (the sterlingcodifiers.com domain did not resolve/timed out on repeated attempts) — the specific requirements below are sourced directly from Santaquin's own Building Department PDFs and pages, not from the codifier mirror.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Santaquin's Building Department page (ut-santaquin.civicplus.com/1478/Building-Department) was live-checked 2026-07-16 and states only the generic phrase 'International Building Code' with no edition year and no separate mention of IRC/IPC/IMC/IECC/NEC at all — so no page-vs-statute lag could be detected; the statute is cited directly as governing throughout. This re-verification also corrected a genuine defect: NEC was entirely absent from the prior codesAdopted list, and IPC/IMC/IECC had been lumped into one undated entry implying they track IBC/IRC in lockstep, which stopped being accurate once IBC (2024) and IRC (2021) diverged.. Local amendments apply — see the Santaquin overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santaquin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.