Commercial Building Permit in Santaquin, Utah

Required for new commercial construction, additions, and structural alterations in Santaquin, regulated by the state-adopted 2024 IBC (Utah Code § 15A-2-103). Santaquin's own published fee schedule does not maintain a separate commercial fee table — the same valuation-based Building Permit Fee (sourced from the current IRC Building Valuation Data sheet, as literally published by the city) applies to commercial work, plus a $500.00 Plan Review Deposit and non-residential-rate impact fees.

Verified 2026-07-19 · Source

When you need this permit

  • New commercial construction, additions, or structural alterations
  • Electronic copy of plans and engineering, site plan to scale, structural engineering plan review, gas line layout with pipe sizes called out, heat loss analysis, and SWPPP — per Santaquin's own document list, which the city applies to 'new residential and commercial construction' without a separate commercial-only checklist
  • Plan Review Deposit of $500.00 required up front, applied to the 65% plan review fee — Santaquin's Building Permits page states this applies to 'New single-family, multi-family, or commercial permits'
  • Contractor license number or Owner-Builder Certification Form Owner-builderContractor
  • All required documents uploaded to the online permit application before review begins (first-come, first-served)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit FeeSantaquin City official Building Permit Fees schedule (Updated 04-02-2026): 'Building Permit & Inspection Fees — Cost Determined By Structure — Cost based on the valuation of the structure as set by the current Building Valuation Data sheet from the IRC.' This is the same generic fee line used for every structure type — Santaquin's published fee schedule does not maintain a separate commercial valuation table or IBC-specific fee schedule.
Cost based on the valuation of the structure, per the current Building Valuation Data sheet from the IRC
Plan Review FeeSantaquin City official Building Permit Fees schedule (Updated 04-02-2026).
65% of the Building Permit Fee
Plan Review DepositThe fee-schedule PDF itself labels this deposit 'New construction only-paid up front and applied to the 65% plan review fee.' Separately, Santaquin's Building Permits page states 'New single-family, multi-family, or commercial permits require a $500.00 Plan Review Deposit before the permit moves forward' — cited here as the city's own confirmation that this deposit covers commercial permits.
$500.00 (paid up front, applied to the 65% plan review fee)
Permit Tracking FeeSantaquin City official Building Permit Fees schedule (Updated 04-02-2026).
$70.00
State Building FeeSantaquin City official Building Permit Fees schedule (Updated 04-02-2026).
1% of Building Permit Fee
Re-inspection FeeSantaquin City official Building Permit Fees schedule (Updated 04-02-2026).
$75.00
Water Impact Fee — Non-ResidentialSantaquin City official Building Permit Fees schedule (Updated 04-02-2026), Water Impact Fees table, non-residential meter-size tiers.
$200.00 (3/4" meter); $1,180.00 (1"); $3,929.00 (1½"); $6,289.00 (2"); $11,799.00 (3"); $19,669.00 (4"); $39,327.00 (6"); $62,926.00 (8")
Public Safety Impact Fee — EMS & Fire (Non-Residential)Santaquin City official Building Permit Fees schedule (Updated 04-02-2026): 'Public Safety Impact Fees: EMS & Fire — $0.90/s.f. — Non-Residential Impact Fee.'
$0.90 per square foot
Public Safety Impact Fee — Police (Non-Residential)Santaquin City official Building Permit Fees schedule (Updated 04-02-2026): 'Public Safety Impact Fees: Police — $0.05/s.f. — Non-Residential Impact Fee.'
$0.05 per square foot

Review timeline

Plan reviewSantaquin’s published plan-review target
10–14 business days

How long did your Commercial Building Permit permit actually take in Santaquin?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings / Foundation

    Before concrete pour, per Santaquin's Required Building Inspection Checklist (items 1–2), applied to any structure type.

  2. 2

    Under-Slab / Rough-In (4-Way)

    Combined rough plumbing, rough electrical, rough heating, and framing inspection per the Required Building Inspection Checklist item 12.

  3. 3

    Final

    Required Building Inspection Checklist item 19, all work complete before occupancy.

See the full Santaquin inspection guide — scheduling & re-inspection fees →

Tips

  • Santaquin's published fee schedule does not separately break out a commercial building-permit line — commercial projects use the same valuation-based Building Permit Fee (from the IRC Building Valuation Data sheet) as residential, plus non-residential-rate impact fees for water, EMS/Fire, and Police.
  • Non-residential impact fee rates differ structurally from residential: EMS & Fire and Police are charged per square foot ($0.90/sf and $0.05/sf respectively) rather than per dwelling unit.
  • The $500 Plan Review Deposit applies to commercial permits per the Building Permits page, though the fee-schedule PDF itself labels the deposit 'new construction only' — confirm with the Building Department (801-754-1011) whether a specific commercial project qualifies.

Frequently asked questions

Santaquin requires a commercial building permit for: New commercial construction, additions, or structural alterations; Electronic copy of plans and engineering, site plan to scale, structural engineering plan review, gas line layout with pipe sizes called out, heat loss analysis, and SWPPP — per Santaquin's own document list, which the city applies to 'new residential and commercial construction' without a separate commercial-only checklist; Plan Review Deposit of $500.00 required up front, applied to the 65% plan review fee — Santaquin's Building Permits page states this applies to 'New single-family, multi-family, or commercial permits'; Contractor license number or Owner-Builder Certification Form; All required documents uploaded to the online permit application before review begins (first-come, first-served). If your project isn't listed, confirm with Santaquin City Building and Safety Division (Community Development Department) at (801) 754-1011 before starting work.

No — Santaquin's official fee schedule applies the same valuation-based Building Permit Fee (from the IRC Building Valuation Data sheet) to commercial and residential structures alike. Commercial projects also pay non-residential-rate impact fees for water, EMS/Fire, and Police, plus the same $500 Plan Review Deposit, 65% Plan Review Fee, and 1% State Building Fee as other new-construction permits.

Santaquin's published plan-review target for a commercial building permit is 10–14 business days.

You'll need: Online Building Permit Application (Citizenserve Portal); Site Plan; Electronic Copy of Plans and Engineering; Plan Review Deposit Payment. See the required-documents checklist on this page for details on each.

Santaquin requires 3 inspection(s) for a commercial building permit, in order: Footings / Foundation, Under-Slab / Rough-In (4-Way), Final. Schedule each through Santaquin City Building and Safety Division (Community Development Department) ((801) 754-1011).

Apply through Santaquin City Building and Safety Division (Community Development Department) at 110 S. Center Street, Santaquin, UT 84655. Phone: (801) 754-1011. Office hours: Mon–Thu 9:00 AM – 5:00 PM, Fri 9:00 AM – 1:00 PM. Official information: https://ut-santaquin.civicplus.com/1479/Building-Permits.

Santaquin, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Santaquin's Building Department page (live-checked 2026-07-16) states generically that the division enforces 'health, safety, International Building Code, and City Code requirements' without itemizing an edition year.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Santaquin's official fee schedule and basement-finish/accessory-structure submittal packets repeatedly reference 'the current Building Valuation Data sheet from the IRC' (a cost-valuation table, not an edition-year assertion).; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized anywhere on Santaquin's own Building Department pages, added here per statute.; 2024 International Plumbing Code (IPC) — CORRECTED: this file previously combined IPC/IMC/IECC into one undated entry described as tracking 'alongside the IBC/IRC,' which is no longer accurate now that IBC (2024), IRC (2021), and these trade codes (2024) diverge in edition year. CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); Santaquin does not publish a separate municipal amendment to this trade code.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); Santaquin does not publish a separate municipal amendment to this trade code.; 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); Santaquin does not publish a separate municipal amendment to this trade code.; 2023 National Electrical Code (NEC) — statewide per Utah Code § 15A-2-103(1)(g); MISSING ENTIRELY from this file's prior codesAdopted list despite being a statute-mandated code — added here since electrical work is explicitly listed among Santaquin's permit-required categories (see 'Do You Need a Permit?' form) but no electrical-code edition was itemized anywhere on the City's own pages.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; Santaquin City Code — local building-permit administration and requirements (permit-required project list, accessory-structure setback/fire-rating rules, sign-permit rules) are published on the Building Department's official pages (ut-santaquin.civicplus.com); the full underlying municipal code text (historically hosted at sterlingcodifiers.com, book_id=303) was not renderable via automated fetch as of this file's verification date (the sterlingcodifiers.com domain did not resolve/timed out on repeated attempts) — the specific requirements below are sourced directly from Santaquin's own Building Department PDFs and pages, not from the codifier mirror.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Santaquin's Building Department page (ut-santaquin.civicplus.com/1478/Building-Department) was live-checked 2026-07-16 and states only the generic phrase 'International Building Code' with no edition year and no separate mention of IRC/IPC/IMC/IECC/NEC at all — so no page-vs-statute lag could be detected; the statute is cited directly as governing throughout. This re-verification also corrected a genuine defect: NEC was entirely absent from the prior codesAdopted list, and IPC/IMC/IECC had been lumped into one undated entry implying they track IBC/IRC in lockstep, which stopped being accurate once IBC (2024) and IRC (2021) diverged.. Local amendments apply — see the Santaquin overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santaquin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Santaquin.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.