EV Charger / EVSE Permit in Santaquin, Utah

Santaquin City's Building Permit Fees schedule has no standalone "Electrical Permit," "EV Charger," or "EVSE" line item. Building Permit & Inspection Fees are "Cost Determined by Structure" — assessed on construction valuation per the current IRC Building Valuation Data sheet — with a 65% Plan Review Deposit and a 1% State Building Fee. EV charger/EVSE installation is therefore billed through this same single valuation-based Building Permit fee, with no distinct electrical or EV carve-out anywhere in the schedule.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Santaquin City
  • Work performed per Santaquin City's adopted electrical code

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit & Inspection Fee — valuation-basedSantaquin City fee schedule (Updated Building Permit Fees, 04-02-2026; Resolution establishing the Fee Schedule for Santaquin City, 06-04-2026): "Building Permit & Inspection Fees — Determined by Structure ... Cost based on the valuation of the structure as set by the current Building Valuation Data sheet from the IRC." No standalone Electrical Permit or EV Charger fee line exists anywhere in either document (confirmed via full-text search).
Cost Determined by Structure (per current IRC Building Valuation Data sheet)
Plan Review DepositSantaquin City fee schedule.
65% of the Building Permit Fee
State Building FeeSantaquin City fee schedule.
1% of Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Santaquin?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building Inspection

    Inspection of the charger circuit, panel, and grounding by Santaquin City Community Development.

See the full Santaquin inspection guide — scheduling & re-inspection fees →

Tips

  • Santaquin has no separate Electrical Permit or EV Charger fee category — the general valuation-based Building Permit fee applies to every trade, including EVSE installation.

Frequently asked questions

Santaquin requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Santaquin City; Work performed per Santaquin City's adopted electrical code. If your project isn't listed, confirm with Santaquin City Building and Safety Division (Community Development Department) at (801) 754-1011 before starting work.

No. Santaquin City has no distinct EV Charger or general Electrical Permit fee category — all trade work, including EV charger installation, is billed through the same valuation-based Building Permit & Inspection Fee, plus a 65% Plan Review Deposit and 1% State Building Fee.

Santaquin does not publish a plan-review timeline for this permit. Contact Santaquin City Building and Safety Division (Community Development Department) at (801) 754-1011 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Santaquin requires 1 inspection(s) for an ev charger / evse permit, in order: Building Inspection. Schedule each through Santaquin City Building and Safety Division (Community Development Department) ((801) 754-1011).

Apply through Santaquin City Building and Safety Division (Community Development Department) at 110 S. Center Street, Santaquin, UT 84655. Phone: (801) 754-1011. Office hours: Mon–Thu 9:00 AM – 5:00 PM, Fri 9:00 AM – 1:00 PM. Official information: https://ut-santaquin.civicplus.com/1479/Building-Permits.

Santaquin, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Santaquin's Building Department page (live-checked 2026-07-16) states generically that the division enforces 'health, safety, International Building Code, and City Code requirements' without itemizing an edition year.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Santaquin's official fee schedule and basement-finish/accessory-structure submittal packets repeatedly reference 'the current Building Valuation Data sheet from the IRC' (a cost-valuation table, not an edition-year assertion).; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized anywhere on Santaquin's own Building Department pages, added here per statute.; 2024 International Plumbing Code (IPC) — CORRECTED: this file previously combined IPC/IMC/IECC into one undated entry described as tracking 'alongside the IBC/IRC,' which is no longer accurate now that IBC (2024), IRC (2021), and these trade codes (2024) diverge in edition year. CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); Santaquin does not publish a separate municipal amendment to this trade code.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); Santaquin does not publish a separate municipal amendment to this trade code.; 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); Santaquin does not publish a separate municipal amendment to this trade code.; 2023 National Electrical Code (NEC) — statewide per Utah Code § 15A-2-103(1)(g); MISSING ENTIRELY from this file's prior codesAdopted list despite being a statute-mandated code — added here since electrical work is explicitly listed among Santaquin's permit-required categories (see 'Do You Need a Permit?' form) but no electrical-code edition was itemized anywhere on the City's own pages.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Santaquin's own Building Department pages, added here per statute since the City's own materials omit it.; Santaquin City Code — local building-permit administration and requirements (permit-required project list, accessory-structure setback/fire-rating rules, sign-permit rules) are published on the Building Department's official pages (ut-santaquin.civicplus.com); the full underlying municipal code text (historically hosted at sterlingcodifiers.com, book_id=303) was not renderable via automated fetch as of this file's verification date (the sterlingcodifiers.com domain did not resolve/timed out on repeated attempts) — the specific requirements below are sourced directly from Santaquin's own Building Department PDFs and pages, not from the codifier mirror.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Santaquin's Building Department page (ut-santaquin.civicplus.com/1478/Building-Department) was live-checked 2026-07-16 and states only the generic phrase 'International Building Code' with no edition year and no separate mention of IRC/IPC/IMC/IECC/NEC at all — so no page-vs-statute lag could be detected; the statute is cited directly as governing throughout. This re-verification also corrected a genuine defect: NEC was entirely absent from the prior codesAdopted list, and IPC/IMC/IECC had been lumped into one undated entry implying they track IBC/IRC in lockstep, which stopped being accurate once IBC (2024) and IRC (2021) diverged.. Local amendments apply — see the Santaquin overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santaquin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.