EV Charger / EVSE Permit — Santaquin, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://ut-santaquin.civicplus.com/DocumentCenter/View/5979/Resolution-06-04-2026---A-Resolution-Establishing-the-Fee-Schedule-for-Santaquin-City
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Santaquin, Utah
Santaquin City's Building Permit Fees schedule has no standalone "Electrical Permit," "EV Charger," or "EVSE" line item. Building Permit & Inspection Fees are "Cost Determined by Structure" — assessed on construction valuation per the current IRC Building Valuation Data sheet — with a 65% Plan Review Deposit and a 1% State Building Fee. EV charger/EVSE installation is therefore billed through this same single valuation-based Building Permit fee, with no distinct electrical or EV carve-out anywhere in the schedule.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Santaquin City
- Work performed per Santaquin City's adopted electrical code
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Inspection
Inspection of the charger circuit, panel, and grounding by Santaquin City Community Development.
See the full Santaquin inspection guide — scheduling & re-inspection fees →
Tips
- Santaquin has no separate Electrical Permit or EV Charger fee category — the general valuation-based Building Permit fee applies to every trade, including EVSE installation.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santaquin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Santaquin
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Santaquin project checklist
Describe your project once and get every permit, document, and fee it triggers in Santaquin — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →