La Verkin building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in La Verkin, Utah.
Verified 2026-07-08 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 435 North Main Street, La Verkin, UT 84745
- Phone
- (435) 635-2581
- Office hours
- Website
- Official site
Inspection sequence
Applies to: Fire Sprinkler System Permit
- 1
Rough-in Inspection
Bundled into the flat sprinkler system permit fee per the District's fee schedule wording ('includes plan review, flush, rough-in, and acceptance').
- 2
Flush Test
Bundled into the flat sprinkler system permit fee.
- 3
Acceptance Test
Bundled into the flat sprinkler system permit fee; residential permits also bundle the final occupancy inspection.
Applies to: Residential Building Permit
- 1
Building Inspection (general)
Scheduled through the city's inspection request process (Schedule an Inspection Online, laverkin.cityinspect.com, or by phone at (435) 635-2581). The Consolidated Fee Schedule sets a minimum inspection fee of $50 for permits requiring one inspection and $100 for permits requiring two inspections (plus state sales tax), with a $47 fee for a third callback inspection.
- 2
IRC/IECC Code Compliance Verification (thermal envelope and duct leakage)
A certified tester/special inspector (BPI or RESNET certified) must complete and sign the city's IRC/IECC Code Compliance Certification form, verifying either prescriptive compliance (IRC Table N1102.4.1.1 air barrier/insulation, IRC § N1103.2.2 duct exception) or performance testing (blower-door test for air changes per hour; duct blaster test for CFM leakage at rough-in and/or final).
- 3
Certificate of Occupancy / Completion
A Certificate of Occupancy or Completion must be obtained from the Building Department prior to occupancy of any structure, per the notice printed on the official Building Permit Application form ('Prior to occupancy of any structure, a Certificate of Occupancy or Completion must be obtained from the Building Department').
Applies to: Commercial Building Permit
- 1
Building Inspection (general)
Scheduled through the city's inspection request process (laverkin.cityinspect.com or (435) 635-2581). The Consolidated Fee Schedule sets a minimum inspection fee of $50 for permits requiring one inspection and $100 for permits requiring two inspections (plus state sales tax), with a $47 fee for a third callback inspection.
- 2
Certificate of Occupancy / Completion
A Certificate of Occupancy or Completion must be obtained from the Building Department prior to occupancy, per the notice printed on the official Building Permit Application form.
Applies to: Solar / Solar PV Installation Permit
- 1
Electrical Inspection
New PV system wiring, inverter, and interconnection verified against 2023 NEC Article 690 by La Verkin's Building Inspection Division.
- 2
Structural/Roof-Mount Inspection
For roof-mounted arrays, racking attachment and roof penetration verified against the adopted IBC/IRC structural provisions.
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Verkin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
La Verkin building permits
Get alerts for La Verkin
We'll email you when La Verkin's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.