Inspection sequence

Applies to: Fire Sprinkler System Permit

  1. 1

    Rough-in Inspection

    Bundled into the flat sprinkler system permit fee per the District's fee schedule wording ('includes plan review, flush, rough-in, and acceptance').

  2. 2

    Flush Test

    Bundled into the flat sprinkler system permit fee.

  3. 3

    Acceptance Test

    Bundled into the flat sprinkler system permit fee; residential permits also bundle the final occupancy inspection.

Applies to: Residential Building Permit

  1. 1

    Building Inspection (general)

    Scheduled through the city's inspection request process (Schedule an Inspection Online, laverkin.cityinspect.com, or by phone at (435) 635-2581). The Consolidated Fee Schedule sets a minimum inspection fee of $50 for permits requiring one inspection and $100 for permits requiring two inspections (plus state sales tax), with a $47 fee for a third callback inspection.

  2. 2

    IRC/IECC Code Compliance Verification (thermal envelope and duct leakage)

    A certified tester/special inspector (BPI or RESNET certified) must complete and sign the city's IRC/IECC Code Compliance Certification form, verifying either prescriptive compliance (IRC Table N1102.4.1.1 air barrier/insulation, IRC § N1103.2.2 duct exception) or performance testing (blower-door test for air changes per hour; duct blaster test for CFM leakage at rough-in and/or final).

  3. 3

    Certificate of Occupancy / Completion

    A Certificate of Occupancy or Completion must be obtained from the Building Department prior to occupancy of any structure, per the notice printed on the official Building Permit Application form ('Prior to occupancy of any structure, a Certificate of Occupancy or Completion must be obtained from the Building Department').

Applies to: Commercial Building Permit

  1. 1

    Building Inspection (general)

    Scheduled through the city's inspection request process (laverkin.cityinspect.com or (435) 635-2581). The Consolidated Fee Schedule sets a minimum inspection fee of $50 for permits requiring one inspection and $100 for permits requiring two inspections (plus state sales tax), with a $47 fee for a third callback inspection.

  2. 2

    Certificate of Occupancy / Completion

    A Certificate of Occupancy or Completion must be obtained from the Building Department prior to occupancy, per the notice printed on the official Building Permit Application form.

Applies to: Solar / Solar PV Installation Permit

  1. 1

    Electrical Inspection

    New PV system wiring, inverter, and interconnection verified against 2023 NEC Article 690 by La Verkin's Building Inspection Division.

  2. 2

    Structural/Roof-Mount Inspection

    For roof-mounted arrays, racking attachment and roof penetration verified against the adopted IBC/IRC structural provisions.

Re-inspection fees

Sign PermitRe-inspection · City of La Verkin Consolidated Fee Schedule, "Signs" section
$42.00

La Verkin building permits

Get alerts for La Verkin

We'll email you when La Verkin's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.