Residential Building Permit in La Verkin, Utah
Required for new single-family residential construction and other building work regulated by the statewide-mandatory 2024 IBC / 2021 IRC (Utah Code § 15A-2-103) in La Verkin; the city's own codified ordinance (Title 9, Chapter 1) still names the 2021 IBC as of a 2026-07-16 direct read, a local-ordinance lag that does not change the statutory requirement. The Building Inspection Division (City Hall, 435 North Main Street) issues the permit directly — La Verkin is not contracted to Washington County. Fees are valuation-based (90% of a 2008-dated square-foot construction cost chart) plus a plan review fee and utility impact fees coordinated with the Washington County Water Conservancy District and Hurricane Valley Fire SSD. Rooftop solar panel installation has no distinct permit type or fee line in La Verkin: a full-text search of the Consolidated Fee Schedule (updated March 7, 2024) and the Building Permit Packet found zero mentions of 'solar' anywhere in either document as of 2026-07-19, so solar installs are understood to route through this same valuation-based Building Permit Fee plus Plan Review Fee, like every other trade covered in this file's tipsAndGotchas.
Verified 2026-07-19 · Source
When you need this permit
- New single-family residential construction or other work regulated by the adopted 2021 IRC / 2024 IBC
- Completed City of La Verkin Building Permit Application (all spaces must be filled in and form signed or the permit is not valid, per the official application form)
- Job address, Tax ID # (city-assigned 'LV-' prefix), subdivision name, lot #, and owner/contractor information including license numbers for general, electrical, mechanical, and plumbing contractors
- Valuation of the project stated on the application, used to calculate the Building Permit Valuation Fee
- Owner/Builder Certification (Utah Department of Commerce, Division of Occupational & Professional Licensing) if built owner-builder, certifying the owner has not built more than 3 residential structures in the past 5 years and the project is for personal, non-commercial use Owner-builder
- IRC/IECC Code Compliance Certification form (thermal envelope and duct leakage compliance method) for new dwellings
- Washington County Water Conservancy District Residential Building Permit Impact Fee Application Form and Receipt, countersigned by both the City and WCWCD before permit issuance
- Utah Construction Storm Water Permit / SWPPP coverage (Common Plan Permit or Construction General Permit, via construction.stormwater.utah.gov) for qualifying disturbance thresholds
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Inspection (general)
Scheduled through the city's inspection request process (Schedule an Inspection Online, laverkin.cityinspect.com, or by phone at (435) 635-2581). The Consolidated Fee Schedule sets a minimum inspection fee of $50 for permits requiring one inspection and $100 for permits requiring two inspections (plus state sales tax), with a $47 fee for a third callback inspection.
- 2
IRC/IECC Code Compliance Verification (thermal envelope and duct leakage)
A certified tester/special inspector (BPI or RESNET certified) must complete and sign the city's IRC/IECC Code Compliance Certification form, verifying either prescriptive compliance (IRC Table N1102.4.1.1 air barrier/insulation, IRC § N1103.2.2 duct exception) or performance testing (blower-door test for air changes per hour; duct blaster test for CFM leakage at rough-in and/or final).
- 3
Certificate of Occupancy / Completion
A Certificate of Occupancy or Completion must be obtained from the Building Department prior to occupancy of any structure, per the notice printed on the official Building Permit Application form ('Prior to occupancy of any structure, a Certificate of Occupancy or Completion must be obtained from the Building Department').
See the full La Verkin inspection guide — scheduling & re-inspection fees →
Tips
- La Verkin issues its own building permits directly through its Building Inspection Division at City Hall (435 North Main Street) — it is not contracted to Washington County for building permit administration, though it does coordinate with the Washington County Water Conservancy District (water impact fees) and Hurricane Valley Fire SSD (fire service and fire impact fees) as outside agencies.
- The city's Building Permit Valuation Fee is based on a square-foot construction cost chart dated 06/18/08 — confirm with the Building Department whether a more current valuation chart is in use, as no updated chart was found published on the city's site as of this verification.
- A separate Washington County Water Conservancy District impact fee form must be completed and countersigned by both the City and WCWCD before the building permit can be issued — bring proof of secondary irrigation water connection/payment if applicable.
- Fire impact fees are billed by Hurricane Valley Fire Special Service District, not the City of La Verkin directly — have your subdivision name, lot number, Tax ID number, and/or project address ready when paying, as noted on the District's own fee schedule.
- Utah's statewide statutory floor (Utah Code § 10-20-909) requires plan review of a one- or two-family dwelling to complete within 14 business days after a completeness-screening period of up to 3 business days — this is a minimum legal obligation applicable to La Verkin as AHJ, not a city-published target, and the review clock does not include prior state building-inspection timelines for post-permit inspections (a separate 3-business-day standard applies there under § 10-20-909(2)).
- No distinct solar/PV permit or fee exists in La Verkin — the Consolidated Fee Schedule and Building Permit Packet contain no 'solar' line item, so a rooftop solar install is priced the same as any other project under the valuation-based Building Permit Valuation Fee plus the $50-minimum/$47-per-hour Plan Review Fee; confirm directly with the Building Inspection Division at (435) 635-2581.
- La Verkin likewise has no distinct EV charger / EVSE permit type or fee — the city's Consolidated Fee Schedule (updated March 7, 2024) lists no standalone electrical-trade permit category at all (only the single valuation-based Building Permit Valuation Fee), consistent with the pattern already documented for solar in this file. A residential Level 2 EV charger install is expected to route through the same Building Permit Valuation Fee plus the $50-minimum/$47-per-hour Plan Review Fee; confirm directly with the Building Inspection Division at (435) 635-2581.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Verkin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in La Verkin
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your La Verkin project checklist
Describe your project once and get every permit, document, and fee it triggers in La Verkin — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →