Solar / Solar PV Installation Permit in La Verkin, Utah
La Verkin has no distinct solar/solar-PV permit type or fee line. A direct page-by-page review of the City of La Verkin Consolidated Fee Schedule (updated March 7, 2024, all 8 pages) confirms zero mentions of 'solar,' 'photovoltaic,' or 'PV' anywhere in the document — the schedule's 'Building Permits' category lists only the single valuation-based Building Permit Valuation Fee (90% of the square-foot construction costs chart, 06/18/08) plus the Plan Review Fee and inspection fees, with no standalone electrical-trade or renewable-energy category (the same pattern already documented for the EV Charger / EVSE Permit entry in this file). The City's own Building Permit Application form (in the Building Permit Packet) likewise has no 'Solar' checkbox under its 'Use of Building' section — only New, Addition, Remodel, Modular, Sign, Move, and Remove. A rooftop or ground-mount solar PV installation is billed under this same Building Permit Valuation Fee plus Plan Review Fee, and is subject to the statewide-adopted 2023 National Electrical Code Article 690 (Solar Photovoltaic Systems) as the governing installation code, since La Verkin has not adopted a separate solar-specific ordinance.
Verified 2026-07-21 · Source
When you need this permit
- Installation of a rooftop or ground-mount solar photovoltaic (PV) system at a residential or commercial property within La Verkin
- Electrical work must comply with the statewide-adopted 2023 National Electrical Code (NEC), Article 690 (Solar Photovoltaic Systems), per Utah Code § 15A-2-103(1)(g)
- Structural work (roof-mount racking, roof penetrations) must comply with the statewide-adopted 2024 International Building Code / 2021 International Residential Code as applicable
- Application submitted through La Verkin's Building Inspection Division at City Hall (435 North Main Street, (435) 635-2581) using the same Building Permit Application used for other trade/electrical work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
New PV system wiring, inverter, and interconnection verified against 2023 NEC Article 690 by La Verkin's Building Inspection Division.
- 2
Structural/Roof-Mount Inspection
For roof-mounted arrays, racking attachment and roof penetration verified against the adopted IBC/IRC structural provisions.
See the full La Verkin inspection guide — scheduling & re-inspection fees →
Tips
- La Verkin has no distinct solar/PV fee line — a full page-by-page review of the current Consolidated Fee Schedule (updated March 7, 2024) found no 'solar,' 'photovoltaic,' or 'PV' line item anywhere in the 8-page document, only the single valuation-based Building Permit Valuation Fee.
- The City's Building Permit Application 'Use of Building' checklist (New, Addition, Remodel, Modular, Sign, Move, Remove) has no separate Solar option — solar installs are processed as standard building/electrical permit work.
- A residential or commercial solar PV install is expected to route through the same Building Permit Valuation Fee plus the $50-minimum/$47-per-hour Plan Review Fee as other electrical trade work (consistent with how La Verkin treats EV charger installs); confirm directly with the Building Inspection Division at (435) 635-2581.
- Installation must still meet 2023 NEC Article 690 (Solar Photovoltaic Systems) as the statewide-adopted electrical code governing PV systems, even though there is no separate city permit category for it.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Verkin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in La Verkin
Solar / Solar PV Installation Permit in other cities
Compare solar / solar pv installation permit fees across Utah →