EV Charger / EVSE Permit in La Verkin, Utah

La Verkin has no distinct EV charger/EVSE permit type or fee — the city's Consolidated Fee Schedule (updated March 7, 2024) lists no standalone electrical-trade permit category at all, only the single valuation-based Building Permit Valuation Fee. A residential Level 2 EV charger install is billed under this same Building Permit Valuation Fee plus the $50-minimum/$47-per-hour Plan Review Fee, consistent with how the city treats other electrical/trade work such as solar.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel/service capacity upgrade to serve the charger
  • Application submitted through La Verkin's Building Inspection Division at City Hall (435 North Main Street, (435) 635-2581)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Valuation Fee (covers EV charger installation)City of La Verkin Consolidated Fee Schedule (updated March 7, 2024). No distinct EV charger/EVSE line or standalone electrical-trade line exists; EV charger installation is valued and billed under this same Building Permit Valuation Fee as standard electrical work.
Based upon 90% of the square foot construction costs chart (06/18/08)
Inspections minimum per one inspectionCity of La Verkin Consolidated Fee Schedule (updated March 7, 2024).
$50.00 (plus State sales tax)
Permit fee minimum requiring two inspectionsCity of La Verkin Consolidated Fee Schedule (updated March 7, 2024).
$100.00 (plus State sales tax)
Plan Review FeeCity of La Verkin Consolidated Fee Schedule (updated March 7, 2024).
$50 minimum or $47 per hour, whichever is greater

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in La Verkin?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    New circuit, panel/service capacity, and charger connection verified by La Verkin's Building Inspection Division.

See the full La Verkin inspection guide — scheduling & re-inspection fees →

Tips

  • La Verkin has no distinct EV charger/EVSE fee line — the city's Consolidated Fee Schedule (updated March 7, 2024) lists no standalone electrical-trade permit category at all, only the single valuation-based Building Permit Valuation Fee.
  • A residential Level 2 EV charger install is expected to route through the same Building Permit Valuation Fee plus the $50-minimum/$47-per-hour Plan Review Fee; confirm directly with the Building Inspection Division at (435) 635-2581.

Frequently asked questions

La Verkin requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property; New dedicated electrical circuit and/or panel/service capacity upgrade to serve the charger; Application submitted through La Verkin's Building Inspection Division at City Hall (435 North Main Street, (435) 635-2581). If your project isn't listed, confirm with City of La Verkin Building Department (Building Inspection Division) at (435) 635-2581 before starting work.

No. La Verkin's Consolidated Fee Schedule (updated March 7, 2024) has no distinct EV charger/EVSE fee line and no standalone electrical-trade permit category. An EV charger installation is billed under the same valuation-based Building Permit Valuation Fee plus the $50-minimum/$47-per-hour Plan Review Fee as any other electrical work.

La Verkin does not publish a plan-review timeline for this permit. Contact City of La Verkin Building Department (Building Inspection Division) at (435) 635-2581 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

La Verkin requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through City of La Verkin Building Department (Building Inspection Division) ((435) 635-2581).

Apply through City of La Verkin Building Department (Building Inspection Division) at 435 North Main Street, La Verkin, UT 84745. Phone: (435) 635-2581. Official information: https://www.laverkin.gov/forms.

La Verkin, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide-mandatory edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026. La Verkin City Code Title 9, Chapter 1, § 9-1-2 'Building Code Adopted' locally codifies 'the 2021 edition of the international building code' (last amended by Ord. 2024-06, 2-21-2024 — before the 2026 statewide flip); confirmed by a direct read of the full ordinance text via the Browser pane on 2026-07-16. codelibrary.amlegal.com/codes/laverkinut is in fact fully readable (the entire Chapter 1 text renders on a standard page load) — a prior note in this file calling it an unrenderable React app was incorrect and has been corrected. The city's own ordinance has not yet been updated to the 2024 edition; the statewide statute governs regardless, as La Verkin is bound as a Utah municipality under § 15A-1-204.; 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update. La Verkin City Code § 9-1-3 'Residential Code Adopted' also names the 2021 edition (confirmed via direct read 2026-07-16) — city ordinance and statute agree here.; 2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update. La Verkin City Code § 9-1-4 'Electrical Code Adopted' locally codifies the '2020 version of the national electrical code' (confirmed via direct read 2026-07-16) — a pre-existing lag on the city's own ordinance, predating and unrelated to the July 2026 flip (the statewide NEC cycle had already advanced past 2020 in an earlier update).; 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026. La Verkin City Code § 9-1-5 'Plumbing Code Adopted' locally codifies the '2021 version' (confirmed via direct read 2026-07-16) — not yet updated to the 2024 edition.; 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026. La Verkin City Code § 9-1-6 'Fuel Gas Code Adopted' locally codifies the '2021 version' (confirmed via direct read 2026-07-16) — not yet updated to the 2024 edition.; 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026. La Verkin City Code § 9-1-7 'Mechanical Code Adopted' locally codifies the '2021 version' (confirmed via direct read 2026-07-16) — not yet updated to the 2024 edition.; International Fire Code (IFC) — La Verkin City Code § 9-1-8 'Fire Code Adopted' locally codifies 'the 2021 edition of the international fire code, as amended and adopted by the state,' referencing the state fire code at Utah Code Title 15A, Chapter 5 (confirmed via direct read 2026-07-16), enforced in coordination with Hurricane Valley Fire Special Service District. Utah Code § 15A-2-103 does not itemize the IFC — the state fire code is a separate provision under Title 15A, Chapter 5, not part of the § 15A-2-103(1) construction-code list, so the IFC edition is unaffected by the § 15A-2-103 July 1, 2026 flip.; International Wildland-Urban Interface Code — La Verkin City Code § 9-1-9 'Wildland-Urban Interface Code Adopted' locally codifies the '2020 edition' (confirmed via direct read 2026-07-16), which differs from the statewide baseline 2006 edition (with Division of Forestry, Fire, and State Lands amendments) available for local adoption under Utah Code § 15A-2-103(2) — a separate statutory provision from Subsection (1) and unaffected by the July 1, 2026 flip to the Subsection (1) codes.; 2024 International Energy Conservation Code (IECC) — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026. La Verkin City Code § 9-1-10 'Energy Conservation Code Adopted' locally codifies the '2018 version' (confirmed via direct read 2026-07-16) — a substantial pre-existing lag on the city's own ordinance (predating even the prior 2021 statewide IECC cycle), unrelated to the July 2026 flip.; 2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026. La Verkin City Code § 9-1-12 'Existing Building Code Adopted' locally codifies the '2021 edition' (confirmed via direct read 2026-07-16) — not yet updated to the 2024 edition.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026. La Verkin City Code § 9-1-13 'Swimming Pool And Spa Code Adopted' locally codifies the '2021 edition' (confirmed via direct read 2026-07-16) — not yet updated to the 2024 edition.; Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); La Verkin City Code Title 9, Chapter 1 does not separately address modular buildings, but the statewide standard applies regardless.. Local amendments apply — see the La Verkin overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Verkin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.