Building Permit in Redmond, Washington

Required for construction in Redmond, built to the named 2021 editions with the city's own design criteria and a fee schedule that lives in the zoning code.

Reviewed 2026-09-16 · Source

When you need this permit

  • Built to the 2021 International Building Code or 2021 International Residential Code
  • IRC Chapters 11 and 25 through 43 are NOT adopted
  • Accessibility is to A117.1-2017
  • You must provide an estimated permit value at application, covering total value of work including materials and labour

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building permit fee
REDMOND'S PERMIT FEES ARE IN ITS ZONING CODE, NOT ITS BUILDING CODE. Show full citationREDMOND'S PERMIT FEES ARE IN ITS ZONING CODE, NOT ITS BUILDING CODE. RMC 15.08.050(F) amends the fee section to read that "a fee for each permit shall be paid as required, in accordance with Redmond Zoning Code Section 21.76.030, Application Requirements, as said section currently exists or is hereafter amended, modified or recodified." RZC 21.76.030 WAS NOT OPENED for this entry, so no amount is stated here. NOTE WHO SETS THE VALUATION: RMC 15.08.050(G) provides that "The applicant for a permit shall provide an estimated permit value at time of application", and that valuations "shall include total value of work, including materials and labor" - which is the opposite of Vancouver, where the building official derives the valuation from national statistical averages.
Set by the zoning code - see notes

Review timeline

Plan review
Not published — contact the department

How long did your Building Permit permit actually take in Redmond?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • The fee schedule is in Redmond Zoning Code 21.76.030, not in the building code
    • Design to Redmond's own criteria - its 15 psf ground snow load is the lowest in this guide and a neighbouring city's figure will over- or under-shoot

    Frequently asked questions

    Redmond requires a building permit for: Built to the 2021 International Building Code or 2021 International Residential Code; IRC Chapters 11 and 25 through 43 are NOT adopted; Accessibility is to A117.1-2017; You must provide an estimated permit value at application, covering total value of work including materials and labour. If your project isn't listed, confirm with City of Redmond at (425) 556-2900 before starting work.

    In Redmond, the published Building permit fee is: Set by the zoning code - see notes. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Redmond does not publish a plan-review timeline for this permit. Contact City of Redmond at (425) 556-2900 for current turnaround.

    You'll need: Building permit application. See the required-documents checklist on this page for details on each.

    Apply through City of Redmond at 15670 NE 85th St, Redmond, WA 98073. Phone: (425) 556-2900. Official information: https://www.redmond.gov/.

    Redmond, Washington has adopted: THE 2021 EDITIONS, NAMED. RMC 15.08.020: "The 2021 edition of the International Building Code as published by the International Code Council is hereby adopted by reference with the exceptions noted in WAC Chapter 51-50. The 2021 edition of the International Existing Building Code ... is included in the adoption of this Code with the exceptions noted in WAC 51-50-480000. A117.1-2017 is adopted pursuant to RCW Chapters 70.92 and 19.27. The 2021 edition of the International Residential Code ... is hereby adopted by reference with the exceptions noted in WAC Chapter 51-51."; THE RESIDENTIAL CODE LOSES THREE BLOCKS. The same section: "Chapters 11 and 25 through 43 of this code are not adopted." Chapter 11 is energy and 25 through 43 are plumbing and electrical, which come from separate adoptions - so a single IRC reference will not give you the whole rule for a house.; THE ACCESSIBILITY STANDARD IS A DIFFERENT VINTAGE. A117.1-2017 sits alongside the 2021 editions, adopted "pursuant to RCW Chapters 70.92 and 19.27".; Title 15 also carries Accessory Improvements (15.02), Flood Control (15.04), Fire (15.06), Electrical (15.12), Mechanical (15.14), Plumbing (15.16), Energy (15.18), Moving Buildings (15.22), Clearing, Grading and Stormwater (15.24), a WILDLAND-URBAN INTERFACE CODE (15.26), apprentice requirements on public works (15.28) and construction and demolition debris recycling (15.30). None of those were read for this entry.; RCW 19.27 - the Washington State Building Code applies statewide.. Local amendments apply — see the Redmond overview page for the full list.

    RMC 15.08.060(J) amends Table R301.2 for Redmond: Ground Snow Load 15 psf, Wind Speed 110 mph with no topographic effects, Seismic Design Category D2, Weathering Moderate, Frost Line Depth 12 inches, Termite and Decay Slight to Moderate, Winter Design Temp 27 degrees F, no ice shield underlayment required, Air Freezing Index 113, Mean Annual Temp 52 degrees F. Flood hazards are recorded as joining the National Flood Insurance Program in 1979 with a current FIRM of 1999.

    In the zoning code. RMC 15.08.050(F) makes the fee payable "in accordance with Redmond Zoning Code Section 21.76.030, Application Requirements, as said section currently exists or is hereafter amended, modified or recodified." This guide has not opened that section, so no amount is given. Note you supply the valuation yourself: RMC 15.08.050(G) requires the applicant to provide an estimated permit value at the time of application.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-09-16.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Redmond building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Redmond's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Redmond yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Redmond lands. Privacy.

    Other permits in Redmond

    Compare building permit fees across Washington

    Look up this fee in a different city →

    Embed this data card →

    Now live

    Build your Redmond project checklist

    Describe your project once and get every permit, document, and fee it triggers in Redmond — in one checklist. Free, for any city and any number of projects.

    Get started →