Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Campbell County, Wyoming.

Verified 2026-07-01 · Source

How to schedule

Inspections are requested through the building department below.

Address
500 S. Gillette Ave., Suite 1500, Gillette, WY 82716
Phone
(307) 682-1970
Office hours
Mon–Fri, 8:00 a.m.–5:00 p.m.

Published scheduling rules

  • Call (307) 682-1970 at least 24 hours in advance to schedule inspections; appointments are honored on a first-come, first-served basis. (Residential Building Permit (New Construction))
  • Construction inspections are scheduled directly with the Fire Department (307-682-5319) with a minimum of 48 hours advance notice (Fire Sprinkler & Fire Alarm System Permit)

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Footing

    Before concrete pour

  2. 2

    Stemwall

    Foundation stemwall inspection

  3. 3

    Service Utility Lines

    Water, gas, sewer service connections

  4. 4

    Rough-In (framing, electric, plumbing, HVAC)

    After framing and MEP rough-in, before drywall

  5. 5

    Drywall

    Before finishing

  6. 6

    Small Wastewater System (Septic/Leach field)

    Tank, pipe, chambers, and rock left exposed for inspection

  7. 7

    Final

    All work complete; required for Certificate of Occupancy

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Foundation

    For new-construction detached or attached ADUs

  2. 2

    Framing

    Structural framing, fire/sound separation if attached

  3. 3

    MEP Rough-In

    Mechanical, electrical, plumbing rough-in

  4. 4

    Final

    All work complete, ready for occupancy

Applies to: Commercial Building Permit / Tenant Improvement

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing/Structural

    Structural, fire-resistant construction verification

  3. 3

    MEP Rough-In

    Electrical, plumbing, mechanical, fire protection rough-in

  4. 4

    Final

    All work complete, ready for Certificate of Occupancy

Applies to: Fire Sprinkler & Fire Alarm System Permit

  1. 1

    Sprinkler Rough-In

    Underground/rough piping inspection before concealment, per Fire Department construction inspection types

  2. 2

    Sprinkler Hydrostatic Test

    Hydrostatic pressure test of the completed sprinkler system

  3. 3

    Fire Alarm Acceptance

    Final acceptance test of the installed fire alarm system

  4. 4

    Knox Box Mounting/Key

    Verification of Knox Box key-box installation and Fire Department key deposit, required for new commercial occupancies before occupancy is granted

Applies to: Deck Permit

  1. 1

    Footers

    Before concrete is poured

  2. 2

    Framing

    Required only when the deck is close to the ground, making floor joist/beam/post inspection otherwise impossible after decking is installed

  3. 3

    Final

    All framing installed and deck completed

Applies to: Plumbing Permit

  1. 1

    Underground/Under-slab

    Before concrete pour or backfill — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After piping installed, before walls closed

  3. 3

    Final

    All fixtures connected, no leaks

Applies to: Residential Addition / Remodel Permit

  1. 1

    Footing/Foundation (if new footings)

    Before concrete pour

  2. 2

    Rough-In (framing, electric, plumbing, HVAC)

    Before walls closed

  3. 3

    Final

    All work complete per approved plans

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring and boxes installed before walls closed

  2. 2

    Final

    All devices installed, system energized

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    Wiring/conduit for the EV charger circuit installed before walls closed, if applicable

  2. 2

    Final

    Charger circuit/equipment installed, breaker sized correctly, system energized

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In/Equipment

    Equipment installation and ductwork before walls closed

  2. 2

    Final

    Equipment operational, venting/combustion air verified

Applies to: Solar PV Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement

  2. 2

    Final

    Racking/structural and electrical interconnection verified

Re-inspection fees

Commercial Building Permit / Tenant ImprovementCommercial Building Inspection — re-inspection · Chapter 4 Section 1.8.C — the first two inspections for each portion of work are free; each additional re-inspection for incorrectly performed work is $60, payable in person before scheduling
$60.00 per re-inspection

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Campbell County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Unincorporated Campbell County building permits

Get alerts for Unincorporated Campbell County

We'll email you when Unincorporated Campbell County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.