Roofing Permit (Reroof) in Unincorporated Campbell County, Wyoming

Roof replacement/reroofing on a residential structure in unincorporated Campbell County falls under the county's general Building Permit framework (2024 IRC, Chapter 4 Section 4). Campbell County has no separate published reroof-specific fee or permit type distinct from the general 'All Other Permits: No fees' rule — reroofing is charged under that same no-fee provision unless it triggers a Commercial Building Permit.

Verified 2026-07-01 · Source

When you need this permit

  • Reroofing of a dwelling located inside a platted subdivision requires a Building Permit under the general Chapter 4 framework; a rural (unplatted) dwelling's reroof falls under the same rural-dwelling Building Permit exemption (Chapter 4 § 1.4.A.3) as new construction
  • Roof design must meet Chapter 4 Section 1.6 snow load criteria: 35 psf (roofs ≤1:12 pitch) or 30 psf (roofs >1:12 pitch), no reductions, plus required ice barrier underlayment

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Reroof — no separate flat feeReroofing has no separately published fee line; it is covered by Chapter 4 Section 1.8.E 'All Other Permits: No fees,' the same general residential no-fee rule that applies to the underlying Building Permit.
No fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Campbell County building department
~1–10 business days

How long did your Roofing Permit (Reroof) permit actually take in Unincorporated Campbell County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Completed roof — flashing, underlayment, installation quality

See the full Unincorporated Campbell County inspection guide — scheduling & re-inspection fees →

Tips

  • Campbell County requires ice barrier roof underlayment (Chapter 4 § 1.6.I) — confirm compliant underlayment material and installation before final inspection.
  • Minimum roof snow load is 35 psf for low-slope roofs (≤1:12 pitch) with NO reductions permitted — this is a notable local amendment that supersedes the standard IRC/IBC table.

Frequently asked questions

If the dwelling is in a platted subdivision, yes, under the general Building Permit framework (no fee). If the dwelling is a one- or two-family home outside a platted subdivision, the Building Permit itself is exempt per Chapter 4 § 1.4.A.3.

In Unincorporated Campbell County, the published Reroof — no separate flat fee is: No fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a roofing permit (reroof) in Unincorporated Campbell County typically runs 1–10 business days. This is an estimate, not a published figure — confirm current review times with Campbell County Department of Public Works — Building, Planning & Zoning Division at (307) 682-1970.

You'll need: Building Permit & Zoning Certificate Application. See the required-documents checklist on this page for details on each.

Unincorporated Campbell County requires 1 inspection(s) for a roofing permit (reroof), in order: Final. Schedule each through Campbell County Department of Public Works — Building, Planning & Zoning Division ((307) 682-1970).

Apply through Campbell County Department of Public Works — Building, Planning & Zoning Division at 500 S. Gillette Ave., Suite 1500, Gillette, WY 82716. Phone: (307) 682-1970, email: septic@campbellcountywy.gov (Small Wastewater System applications); planning@campbellcountywy.gov (Planning & Zoning); general Public Works (307) 685-8061. Office hours: Mon–Fri, 8:00 a.m.–5:00 p.m.. Official information: https://www.ccgov.net/286/Building-Division.

Unincorporated Campbell County, Wyoming has adopted: 2024 International Building Code (IBC) — including Appendices C and J, adopted by Campbell County Chapter 4 Rules Regulating Construction, Section 3 (Amended June 2026); 2024 International Residential Code (IRC) — including Appendices A, B, C and E, adopted Chapter 4 Section 4 (Amended June 2026); 2024 International Mechanical Code (IMC) — including Appendix A, adopted Chapter 4 Section 5; 2024 International Plumbing Code (IPC) — including Appendices A and B, adopted Chapter 4 Section 6 — NOTE: Campbell County uses the IPC, not the Uniform Plumbing Code; 2024 International Fuel Gas Code (IFGC) — all appendices, adopted Chapter 4 Section 7; 2024 International Fire Code (IFC), adopted Chapter 4 Section 8 (enforced by Campbell County Fire Department for Fire Code permits); 2024 International Existing Building Code (IEBC), adopted Chapter 4 Section 9; National Electrical Code (NFPA 70), 2026 Edition — including Informative Annex H, adopted Chapter 4 Section 10; Liquefied Petroleum Gas Code (NFPA 58), 2020 Edition, adopted Chapter 4 Section 11; Wyoming DEQ Water Quality Rules and Regulations Chapter 25 (Septic Tanks, Soil Absorption Systems, and Other Small Wastewater Systems) — adopted as Chapter 4 Appendix 1, administered by Campbell County under delegated authority from Wyoming DEQ (W.S. 35-11-304). Local amendments apply — see the Unincorporated Campbell County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Campbell County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.