Roofing Permit (Reroof) in Unincorporated Campbell County, Wyoming
VerifiedRoof replacement/reroofing on a residential structure in unincorporated Campbell County falls under the county's general Building Permit framework (2024 IRC, Chapter 4 Section 4). Campbell County has no separate published reroof-specific fee or permit type distinct from the general 'All Other Permits: No fees' rule — reroofing is charged under that same no-fee provision unless it triggers a Commercial Building Permit.
Verified 2026-07-01 · Source
When you need this permit
- Reroofing of a dwelling located inside a platted subdivision requires a Building Permit under the general Chapter 4 framework; a rural (unplatted) dwelling's reroof falls under the same rural-dwelling Building Permit exemption (Chapter 4 § 1.4.A.3) as new construction
- Roof design must meet Chapter 4 Section 1.6 snow load criteria: 35 psf (roofs ≤1:12 pitch) or 30 psf (roofs >1:12 pitch), no reductions, plus required ice barrier underlayment
Required documents
- Req
Building Permit & Zoning Certificate Application
Reroofing is applied for through the same county application when a permit is required
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Reroof — no separate flat fee | No fee | Reroofing has no separately published fee line; it is covered by Chapter 4 Section 1.8.E 'All Other Permits: No fees,' the same general residential no-fee rule that applies to the underlying Building Permit. |
Review timeline
~1–10 business days
Typical estimate — confirm current times with the Unincorporated Campbell County building department
Inspection process
- 1
Final
Completed roof — flashing, underlayment, installation quality
Tips
- Campbell County requires ice barrier roof underlayment (Chapter 4 § 1.6.I) — confirm compliant underlayment material and installation before final inspection.
- Minimum roof snow load is 35 psf for low-slope roofs (≤1:12 pitch) with NO reductions permitted — this is a notable local amendment that supersedes the standard IRC/IBC table.
Frequently asked questions
- Do I need a permit to reroof in unincorporated Campbell County?
- If the dwelling is in a platted subdivision, yes, under the general Building Permit framework (no fee). If the dwelling is a one- or two-family home outside a platted subdivision, the Building Permit itself is exempt per Chapter 4 § 1.4.A.3.
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
- Campbell County Department of Public Works — Building, Planning & Zoning Division — official building department
- Campbell County Chapter 4 Rules Regulating Construction, Section 1.6 (snow load/ice barrier) and Section 1.8.E (fees)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Campbell County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Campbell County
Related guides
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.