Solar PV Permit — Unincorporated Campbell County, Wyoming · Requirements sheet
Verified 2026-07-01 · Source: https://www.ccgov.net/286/Building-Division
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar PV Permit in Unincorporated Campbell County, Wyoming
Rooftop or ground-mounted solar photovoltaic system installation in unincorporated Campbell County is permitted under the general Building Permit (structural/racking) and Electrical Permit (interconnection) framework — there is no dedicated 'Solar PV' permit type or fee schedule published separately by Campbell County; the county's general Chapter 4 permit types (Building, Electrical) and no-fee provision apply.
Verified 2026-07-01 · Source
When you need this permit
- Structural/racking attachment to a residential roof is reviewed under the Building Permit (2024 IRC) framework where a Building Permit applies (platted subdivision) — Chapter 4 § 1.4.A.3's rural-dwelling exemption logic extends to the structural aspect for rural dwellings, but the interconnection work still requires an Electrical Permit
- Electrical interconnection, wiring, and disconnects require an Electrical Permit under NFPA 70 (NEC) 2026 Edition, Chapter 4 Section 10
- Structural design must comply with Chapter 4 Section 1.6 snow load (35/30 psf) and wind speed (100–120 mph by risk category) criteria for the roof-mounted array
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement
- 2
Final
Racking/structural and electrical interconnection verified
See the full Unincorporated Campbell County inspection guide — scheduling & re-inspection fees →
Tips
- Campbell County has no dedicated solar permit type or fee schedule published on its Building Division page — treat a residential rooftop solar install as a combined Building Permit (structural) + Electrical Permit application, both no-fee.
- Structural calculations should reference Chapter 4's local snow load (35/30 psf) and wind speed criteria rather than default IRC/ASCE 7 map values.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Campbell County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Campbell County
Solar PV Permit in other cities
Compare solar pv permit fees across Wyoming →
Look up this fee in a different city →
Now live
Build your Unincorporated Campbell County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Campbell County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →