EV Charger / EVSE Permit in Unincorporated Campbell County, Wyoming
Campbell County has no dedicated EV-charger/EVSE permit type or fee. Installing a Level 2 or DC fast EV charger requires a dedicated circuit or service equipment, which is administered under the county's general Electrical Permit (NFPA 70/NEC 2026 Edition, Chapter 4 Section 10) — the same permit used for any other electrical work, issued at no charge per Chapter 4 Section 1.8.E.
Verified 2026-07-20 · Source
When you need this permit
- Electrical Permit required for the EV charger's dedicated circuit/service work — required even where the associated Building Permit is exempt (e.g., rural/unplatted dwellings)
- Service disconnecting means must be installed at a readily accessible location within 50 feet, in plain view from outside the building (Chapter 4 § 10.A.1, amending NEC 230.70(A)(1)) if the install involves new/upgraded service equipment
- Installation must comply with NFPA 70 (National Electrical Code), 2026 Edition, per Chapter 4 Section 10
- County Building Division inspectors perform the electrical inspection locally (Chapter 4 § 10.B.5(a))
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Wiring/conduit for the EV charger circuit installed before walls closed, if applicable
- 2
Final
Charger circuit/equipment installed, breaker sized correctly, system energized
See the full Unincorporated Campbell County inspection guide — scheduling & re-inspection fees →
Tips
- Campbell County has no EV-charger-specific permit or fee — apply for a standard Electrical Permit (no charge) using the county's Building Permit & Zoning Certificate Application.
- An Electrical Permit for the EV charger circuit is required even for rural (unplatted) dwellings that are exempt from a Building Permit under Chapter 4 § 1.4.A.3.
- Unlike most Wyoming jurisdictions that default to the state's Chief Electrical Inspector program, Campbell County runs its own electrical inspection program at no charge — confirm this distinction before assuming the WSFM's statewide fee schedule applies.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Campbell County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Campbell County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Wyoming →
Look up this fee in a different city →