Winkelman has no dedicated solar/PV permit category, application form, or fee schedule of any kind — consistent with the Town's minimal administrative structure documented in this file's residential-building-permit entry (no Building Safety Department, no online portal, permitting run entirely through the Town Clerk at Town Hall). A solar installation, if it requires a Town permit at all, would be administered ad hoc through the Town Clerk under the same 2006 International Codes/2002 NEC code-cycle citation used for other construction, and is subject to Arizona's statewide solar construction permit statute (A.R.S. § 9-468), which caps any Arizona municipality's solar permit fee at the actual cost of issuance.

Reviewed 2026-07-20 · Source

When you need this permit

  • No standalone solar/PV requirements checklist, application form, or code-cycle citation specific to solar was found published by the Town of Winkelman — applicants must contact the Town Clerk, Sylvia Kerlock, at 520-356-7854 or skerlock@townofwinkelman.com directly to determine what, if anything, is required
  • If a Town permit is required, per A.R.S. § 9-468 the fee charged may not exceed the actual cost of issuing the permit, and the Town must be able to provide an itemized cost breakdown on request
  • Winkelman's most recently documented adopted code cycle (2006 International Codes, 2002 NEC per the 2024 AZBO statewide directory) would presumably govern any electrical/structural review, though no Town ordinance confirming this specifically for solar was located
  • No Winkelman-Gila County or Winkelman-Pinal County intergovernmental agreement for building/permit services was found, so neither county's own solar permit process substitutes for a Town of Winkelman process (see this file's residential-building-permit tips)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Solar/PV Permit Fee (not publicly published)No Town of Winkelman fee schedule, valuation table, or resolution of any kind was found published, matching the identical gap documented in this file's residential-building-permit entry. Per A.R.S. § 9-468, any fee charged for a solar construction permit by an Arizona municipality may not exceed the actual cost of issuing the permit. Re-chased 2026-07-20: checked both of the Town's parallel websites (winkelmanaz.gov and the older winkelmanaz.com) — the Council Documents page on each was fetched directly; neither lists a fee schedule, valuation table, or fee resolution among Minutes, Agendas, Budgets, or Auditor's Reports. Wayback CDX search of winkelmanaz.gov found no fee/permit-related captures at all. Confirmed genuinely unpublished, not a research gap — contact Town Hall directly. Re-chased 2026-07-23 (new avenues, see residential-building-permit entry for full detail): the Town's site rebuild on WordPress was re-inventoried in full (no new Building/Permits/Fees page); a full-history Wayback CDX scan of both winkelmanaz.gov (811 captures) and winkelmanaz.com (597 captures) found no fee-schedule PDF ever published; the Town's live FY2026-2027 Official Budget shows only an aggregate 'Licenses and permits' revenue line with no permit-type breakout; the 2026 AZBO Directory and the CAG 2018 Winkelman Community Development Strategy report were both checked and contain no fee information. Still genuinely unpublished.
Not publicly published

Review timeline

Plan review
Not published — contact the department

How long did your Solar Photovoltaic (PV) Permit permit actually take in Town of Winkelman?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final (if a Town permit is issued)

    No Winkelman-specific inspection checklist or sequence for solar/PV was found published; if the Town issues a permit at all, a final inspection verifying racking, roof penetrations, and electrical connections would be the expected minimum under any I-Code-based jurisdiction, but this is not confirmed as Winkelman's actual practice

See the full Town of Winkelman inspection guide — scheduling & re-inspection fees →

Tips

  • Winkelman is the smallest incorporated town in Arizona and has no dedicated Building Safety Department, no online permitting portal, and no published fee schedule for any permit type — solar/PV is no exception. Call the Town Clerk (520-356-7854) before assuming any process resembles a larger city's.
  • Even absent a published Town fee schedule, Arizona's statewide A.R.S. § 9-468 still caps whatever fee the Town charges for a solar construction permit at the actual cost of issuance — ask for an itemized cost breakdown if a quoted fee seems arbitrary.

Frequently asked questions

Town of Winkelman requires a solar photovoltaic (pv) permit for: No standalone solar/PV requirements checklist, application form, or code-cycle citation specific to solar was found published by the Town of Winkelman — applicants must contact the Town Clerk, Sylvia Kerlock, at 520-356-7854 or skerlock@townofwinkelman.com directly to determine what, if anything, is required; If a Town permit is required, per A.R.S. § 9-468 the fee charged may not exceed the actual cost of issuing the permit, and the Town must be able to provide an itemized cost breakdown on request; Winkelman's most recently documented adopted code cycle (2006 International Codes, 2002 NEC per the 2024 AZBO statewide directory) would presumably govern any electrical/structural review, though no Town ordinance confirming this specifically for solar was located; No Winkelman-Gila County or Winkelman-Pinal County intergovernmental agreement for building/permit services was found, so neither county's own solar permit process substitutes for a Town of Winkelman process (see this file's residential-building-permit tips). If your project isn't listed, confirm with Town of Winkelman Town Hall (Office of the Town Clerk) — no separate Building Department exists at 520-356-7854 before starting work.

In Town of Winkelman, the published Solar/PV Permit Fee (not publicly published) is: Not publicly published. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Town of Winkelman does not publish a plan-review timeline for this permit. Contact Town of Winkelman Town Hall (Office of the Town Clerk) — no separate Building Department exists at 520-356-7854 for current turnaround.

You'll need: No published solar-specific application form. See the required-documents checklist on this page for details on each.

Town of Winkelman requires 1 inspection(s) for a solar photovoltaic (pv) permit, in order: Final (if a Town permit is issued). Schedule each through Town of Winkelman Town Hall (Office of the Town Clerk) — no separate Building Department exists (520-356-7854).

Apply through Town of Winkelman Town Hall (Office of the Town Clerk) — no separate Building Department exists at 206 Giffin Avenue, PO Box 386, Winkelman, AZ 85192. Phone: 520-356-7854, email: skerlock@townofwinkelman.com. Office hours: Winkelman is the smallest incorporated town in Arizona (2020 Census population 296) and does not operate a dedicated Building Safety/Development Services department, unlike the City of Buckeye or the City of Globe. Per the 2024 Arizona Building Officials (AZBO) statewide directory, permit/code administration is handled directly through the Town Hall by the Town Clerk, Sylvia Kerlock (skerlock@townofwinkelman.com), rather than by a named Building Official or Building Inspector position. The Town's own website (winkelmanaz.gov) is a minimal six-page site (Home, About, Town Council, Town Budget, Meeting Minutes, Contact Us) with no dedicated Building/Permits/Planning & Zoning page, no published fee schedule, and no A.R.S. § 9-835 licensing-timeframe posting found as of this review (July 2026). Office days are Monday-Thursday per third-party town-hall directories; exact public office hours are not independently published on the Town's own site. Applicants should call 520-356-7854 or email the Town Clerk directly to initiate a permit request.. Official information: https://winkelmanaz.gov/.

Town of Winkelman, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-jurisdiction (city/town/county) authority under state enabling statutes (A.R.S. § 9-802 for municipal adoption by reference). Unlike the City of Buckeye or City of Globe, the Town of Winkelman does NOT run an independent, staffed Building Safety Department with its own recently-updated code ordinance; it is administered directly out of the Town Clerk's office at Town Hall. Source: Town of Winkelman official website (winkelmanaz.gov), which has no dedicated Building/Codes page; 2024 Arizona Building Officials (AZBO) statewide directory entry for Town of Winkelman.; Per the 2024 AZBO Directory (the same statewide industry directory independently cross-checked for the neighboring City of Globe file, where it was found to be stale and superseded by a 2024 city ordinance), Winkelman's listed adopted codes are the 2006 International Codes (I-Codes) and the 2002 National Electrical Code (NEC). UNLIKE Globe, this research found NO subsequent Winkelman town ordinance, resolution, or published code-update document anywhere (Town of Winkelman website, Town of Winkelman Council Documents page, Arizona Memory Project archive, League of Arizona Cities and Towns records) that supersedes this 2006 I-Codes/2002 NEC listing. This 2006/2002 code-cycle citation should therefore be treated as the best-available but NOT independently re-confirmed-current figure — it could not be verified against a live Winkelman-specific ordinance text because no such published, hosted ordinance/code text (e.g., via Municode, CodePublishing, or the Town's own site) was found to exist for Winkelman as of July 2026. Source: 2024 Arizona Building Officials (AZBO) Directory, Town of Winkelman entry (206 Giffin Avenue, Clerk: Sylvia Kerlock). Re-checked 2026-07-23 against the newly-published 2026 AZBO Directory (azbo.us, live fetch) — the Winkelman entry is unchanged and still lists 2006 I-Codes/2002 NEC, meaning the same figure has now persisted across at least two directory editions (2024 and 2026); this makes it less likely to be a stale one-off data-entry error, but it is still an industry-directory listing, not a Winkelman-issued ordinance text, so it remains the best-available rather than an independently ordinance-confirmed figure.; No Winkelman-specific local amendments to the adopted I-Codes/NEC (climatic/geographic design criteria table, exempt-work list, fee schedule, or similar) were found published anywhere by the Town. This is consistent with a town of Winkelman's extremely small size (296 residents per the 2020 Census) and lack of a dedicated Building Safety Department, Building Official, or hosted code-of-ordinances platform.; Manufactured homes, mobile homes, and factory-built buildings are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for construction/installation standards statewide, independent of local code adoption; any Winkelman site-placement/foundation/utility-connection permit would be layered on top of the state's factory-built-structure standards, consistent with the pattern seen in every other AZ jurisdiction in this dataset. Source: A.R.S. § 41-4001 et seq.; Arizona Department of Housing, Office of Manufactured Housing.; The Town of Winkelman does maintain its own Transaction Privilege Tax (TPT) city code (City Code: WM) with the Arizona Department of Revenue, including distinct Contracting-Prime (015), Contracting-Speculative Builders (016), and Contracting-Owner Builder (037) business codes, each taxed at 3.50% — confirming Winkelman functions as an independent municipal taxing/licensing authority for construction activity even though it lacks a dedicated building department. Source: Arizona Department of Revenue, Model City Tax Code, City Profile: Winkelman (azdor.gov/model-city-tax-code/city-profile/winkelman).. Local amendments apply — see the Town of Winkelman overview page for the full list.

No dedicated solar/PV permit category, application form, or fee schedule is published by the Town of Winkelman. Permitting (if required at all) runs entirely through the Town Clerk at Town Hall on a case-by-case basis. Under Arizona's statewide A.R.S. § 9-468, any fee the Town does charge for a solar construction permit may not exceed its actual cost of issuance.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Town of Winkelman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare solar photovoltaic (pv) permit fees across Arizona

Look up this fee in a different city →

Embed this data card →

Now live

Build your Town of Winkelman project checklist

Describe your project once and get every permit, document, and fee it triggers in Town of Winkelman — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →