Skip to main content
PermitBase

Demolition Permit in Safford, Arizona

Required for demolition of any residential or commercial structure in Safford. 'Demolition' is one of the explicit checkbox categories on the City's unified Building Permit Application.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required before demolishing a residential or commercial structure within Safford city limits — checked under 'Demolition' on the Building Permit Application
  • Site plan required showing the structure to be demolished and its location relative to property lines and other structures
  • Valuation of work and Tax Parcel Number required on the application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit — Based on Total ValuationCity of Safford Building Permit Fee Schedule PDF; no separate flat demolition fee was found published by the City — demolition is priced from the same Total Valuation table as all other building-permit work
Building Permit Fee Schedule minimum valuation bracket ($15 minimum, valuation $1-$500) unless a higher valuation of work applies

Review timeline

Plan reviewSafford’s published plan-review target
10–20 business days

How long did your Demolition Permit permit actually take in Safford?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verifies the structure is fully removed and the site is left in a safe condition

See the full Safford inspection guide — scheduling & re-inspection fees →

Tips

  • As of July 2026, the City of Safford does not publish a demolition-specific checklist, a required-prior-clearance step (e.g., a named county air-quality/asbestos NESHAP program), or a distinct flat demolition fee on its public website or Forms page. There is no verifiable online source for these demolition-specific details — call the Building Division at 928-432-4140 directly to confirm any asbestos/utility-disconnect prerequisites and the exact fee before applying.
  • Arizona's statewide asbestos/demolition notification requirements (administered by the Arizona Department of Environmental Quality, ADEQ) generally apply regardless of city — confirm with ADEQ directly whether a NESHAP notification is required for a specific demolition project, since Safford's own site does not walk through this step.

Frequently asked questions

Safford requires a demolition permit for: Building permit required before demolishing a residential or commercial structure within Safford city limits — checked under 'Demolition' on the Building Permit Application; Site plan required showing the structure to be demolished and its location relative to property lines and other structures; Valuation of work and Tax Parcel Number required on the application. If your project isn't listed, confirm with City of Safford Planning & Community Development Department — Building Division at 928-432-4140 before starting work.

As of July 2026, the City of Safford does not publish a flat demolition fee; demolition permits are priced under the same Total Valuation-based Building Permit Fee Schedule as other building-permit work, starting at a $15 minimum bracket. Call the Building Division at 928-432-4140 to confirm pricing for a specific structure.

Safford's published plan-review target for a demolition permit is 10–20 business days.

You'll need: Building Permit Application (Residential or Commercial); Site/Plot Plan. See the required-documents checklist on this page for details on each.

Safford requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through City of Safford Planning & Community Development Department — Building Division (928-432-4140).

Apply through City of Safford Planning & Community Development Department — Building Division at 808 S. 8th Avenue, PO Box 272, Safford, AZ 85546. Phone: 928-432-4140, email: jholguin@saffordaz.gov. Office hours: Monday - Thursday, 7:00 a.m. - 6:00 p.m.; closed Fridays (City Hall 4/10 schedule). Building Permit Applications (Residential or Commercial) are submitted in person or by mail to the Planning & Community Development Department; a complete set of adopted building code books is available to view in the Building Inspector's office by appointment (call 928-432-4140 to schedule).. Official information: https://www.cityofsafford.us/148/Building-Development-Permits-Codes.

Safford, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Safford independently recognizes and administers its own construction codes through the Planning & Community Development Department / Building Division. Source: City of Safford Building / Development Permits & Codes page (cityofsafford.us/148/Building-Development-Permits-Codes).; 2015 International Building Code (IBC), as published by the International Code Council. Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; 2015 International Existing Building Code (IEBC). Source: City of Safford Building / Development Permits & Codes page.; 2015 International Residential Code (IRC). Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; 2015 International Plumbing Code (IPC). Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; 2015 International Mechanical Code (IMC). Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; 2015 International Fuel Gas Code (IFGC). Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; 2015 International Fire Code (IFC), administered as the City's fire code. Source: City of Safford Building / Development Permits & Codes page.; 2014 National Electrical Code (NEC), as published by the National Fire Protection Association (one edition behind the 2015 ICC set; also referred to as the '2014 International Electrical Code' on the City's own Residential Building Inspection Checklist, though NEC is an NFPA, not ICC, publication). Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; ADA Standards for Accessible Design (2010), Americans with Disabilities Act. Source: City of Safford Building / Development Permits & Codes page (links directly to ada.gov/regs2010/2010ADAStandards).; Swimming Pool Safety Code, A.R.S. § 36-1681 (Arizona state statute governing residential swimming pool enclosures/barriers), adopted/cross-referenced by the City. Source: City of Safford Building / Development Permits & Codes page (links directly to azleg.gov ARS 36-1681).; As of July 2026, the City of Safford's own public-facing codes page still lists the 2015 ICC family / 2014 NEC as current, with no published edition-update ordinance found on the City's website, Forms page, or Wayback Machine snapshots as of this review — unlike many Phoenix-metro cities that have since moved to 2018/2021/2024 ICC cycles, Safford's own published materials indicate the 2015/2014 cycle remains in effect. Call the Building Division at 928-432-4140 to confirm before relying on this for a specific project if code-cycle precision is critical.; Effective July 1, 2026, the City of Safford must offer a Standard Preapproved Housing Design Plan Program for single-family homes (800-2,000 sq ft, minimum 3 designs with minimum 3 elevation options each), reviewed through an administrative, non-discretionary process, per the statewide mandate A.R.S. § 9-461.20. This is a design-preapproval pathway layered on top of — not a replacement for — the standard Building Permit Application/review process described in this record. Source: City of Safford Press Release, 'State-Mandated Preapproved Housing Design Plan Program' (cityofsafford.us/m/newsflash/home/detail/780).. Local amendments apply — see the Safford overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Safford building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.