EV Charger / EVSE Permit (Electrical Permit) in Safford, Arizona

Installing a Level 2 (240V) or other electric vehicle charging station in Safford requires an Electrical Permit through the City's unified Building Permit Application, with the 'Electrical' trade box checked. The City does not publish a stand-alone EV-charger fee line — as with all electrical work, the permit is priced from the same Total Valuation-based Building Permit Fee Schedule used for building permits generally, plus the flat $5.00 per-utility add-on noted on that schedule.

Verified 2026-07-20 · Source

When you need this permit

  • Building Permit Application (Residential or Commercial) filed with the City of Safford Planning & Community Development Department, Building Division, with 'Electrical' checked under Permit Type
  • Electrical plans showing the new circuit/panel work, sub-panel location (if applicable), and ampacity of main service, per the same submittal standard used for other electrical work under the Residential Building Inspection Checklist
  • Governed by the 2014 National Electrical Code as recognized by the City of Safford
  • If the charger installation also requires a service/panel upgrade, that scope is covered under the same Electrical Permit, valued and fee-calculated together with the charger circuit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

EV Charger Circuit — Based on Total Valuation, plus utility add-onCity of Safford Building Permit Fee Schedule PDF: 'Each utility add an additional $5.00, i.e. mechanical, electrical, sewer and plumbing.' No dedicated EV-charger/EVSE fee line exists; the same valuation-based schedule already documented for this file's electrical-permit and solar-pv-permit entries applies.
Building Permit Fee Schedule valuation bracket for the work performed (starting at $15 for valuation $1-$500), PLUS $5.00 utility add-on

Review timeline

Plan reviewSafford’s published plan-review target
10–20 business days

How long did your EV Charger / EVSE Permit (Electrical Permit) permit actually take in Safford?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Devices installed, circuit/panel labeled, GFCI/AFCI and NEC protections verified per the 2014 NEC and City's common electrical code requirements

See the full Safford inspection guide — scheduling & re-inspection fees →

Tips

  • There is no EV-charger-specific permit or fee line in Safford — a home charger install is filed as a standard Electrical Permit priced from the same Total Valuation table used for all building-permit work, plus the flat $5 per-utility add-on.
  • As of July 2026, Safford does not publish a stand-alone, itemized electrical fee table for specific scopes like EV chargers or panel upgrades — call the Building Division at 928-432-4140 to confirm pricing for a specific project.

Frequently asked questions

Yes. EV charger installation is electrical work, so it requires a City of Safford Electrical Permit (part of the unified Building Permit Application, with 'Electrical' checked). There is no dedicated EV-charger fee line; it is priced under the same Total Valuation-based Building Permit Fee Schedule as other electrical work, plus a $5.00 utility add-on.

In Safford, the published EV Charger Circuit — Based on Total Valuation, plus utility add-on is: Building Permit Fee Schedule valuation bracket for the work performed (starting at $15 for valuation $1-$500), PLUS $5.00 utility add-on. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Safford's published plan-review target for an ev charger / evse permit (electrical permit) is 10–20 business days.

You'll need: Building Permit Application (Residential or Commercial); Electrical Plans. See the required-documents checklist on this page for details on each.

Safford requires 1 inspection(s) for an ev charger / evse permit (electrical permit), in order: Final. Schedule each through City of Safford Planning & Community Development Department — Building Division (928-432-4140).

Apply through City of Safford Planning & Community Development Department — Building Division at 808 S. 8th Avenue, PO Box 272, Safford, AZ 85546. Phone: 928-432-4140, email: jholguin@saffordaz.gov. Office hours: Monday - Thursday, 7:00 a.m. - 6:00 p.m.; closed Fridays (City Hall 4/10 schedule). Building Permit Applications (Residential or Commercial) are submitted in person or by mail to the Planning & Community Development Department; a complete set of adopted building code books is available to view in the Building Inspector's office by appointment (call 928-432-4140 to schedule).. Official information: https://www.cityofsafford.us/148/Building-Development-Permits-Codes.

Safford, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Safford independently recognizes and administers its own construction codes through the Planning & Community Development Department / Building Division. Source: City of Safford Building / Development Permits & Codes page (cityofsafford.us/148/Building-Development-Permits-Codes).; 2015 International Building Code (IBC), as published by the International Code Council. Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; 2015 International Existing Building Code (IEBC). Source: City of Safford Building / Development Permits & Codes page.; 2015 International Residential Code (IRC). Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; 2015 International Plumbing Code (IPC). Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; 2015 International Mechanical Code (IMC). Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; 2015 International Fuel Gas Code (IFGC). Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; 2015 International Fire Code (IFC), administered as the City's fire code. Source: City of Safford Building / Development Permits & Codes page.; 2014 National Electrical Code (NEC), as published by the National Fire Protection Association (one edition behind the 2015 ICC set; also referred to as the '2014 International Electrical Code' on the City's own Residential Building Inspection Checklist, though NEC is an NFPA, not ICC, publication). Source: City of Safford Building / Development Permits & Codes page; City of Safford Residential Building Inspection Checklist.; ADA Standards for Accessible Design (2010), Americans with Disabilities Act. Source: City of Safford Building / Development Permits & Codes page (links directly to ada.gov/regs2010/2010ADAStandards).; Swimming Pool Safety Code, A.R.S. § 36-1681 (Arizona state statute governing residential swimming pool enclosures/barriers), adopted/cross-referenced by the City. Source: City of Safford Building / Development Permits & Codes page (links directly to azleg.gov ARS 36-1681).; As of July 2026, the City of Safford's own public-facing codes page still lists the 2015 ICC family / 2014 NEC as current, with no published edition-update ordinance found on the City's website, Forms page, or Wayback Machine snapshots as of this review — unlike many Phoenix-metro cities that have since moved to 2018/2021/2024 ICC cycles, Safford's own published materials indicate the 2015/2014 cycle remains in effect. Call the Building Division at 928-432-4140 to confirm before relying on this for a specific project if code-cycle precision is critical.; Effective July 1, 2026, the City of Safford must offer a Standard Preapproved Housing Design Plan Program for single-family homes (800-2,000 sq ft, minimum 3 designs with minimum 3 elevation options each), reviewed through an administrative, non-discretionary process, per the statewide mandate A.R.S. § 9-461.20. This is a design-preapproval pathway layered on top of — not a replacement for — the standard Building Permit Application/review process described in this record. Source: City of Safford Press Release, 'State-Mandated Preapproved Housing Design Plan Program' (cityofsafford.us/m/newsflash/home/detail/780).. Local amendments apply — see the Safford overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Safford building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.