Unincorporated Graham County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Graham County, Arizona.

Verified 2026-07-23 · Source

How to schedule

Inspections are requested through the building department below.

Address
921 Thatcher Boulevard, 2nd Floor, Safford, AZ 85546
Phone
928-428-0410
Office hours
Monday - Thursday, 7:00 a.m. - 6:00 p.m. (per the County's Department Directory listing for Planning & Zoning at 921 Thatcher Boulevard). No public-facing department email address was found published on the County's Planning & Zoning page, Permits & Hearing Forms page, or FAQ pages as of the last verification; contact by phone at 928-428-0410 or in person.

Inspection sequence

Applies to: Commercial Building Permit (New Construction, Addition, Tenant Improvement)

  1. 1

    Set Back Inspection

    When the building pad is done and concrete forms are set — BEFORE any plumbing goes in (County's published six-stage sequence; the guidance sheet is written for new residential construction but is the County's only published inspection sequence and is cross-applicable to the same trades on commercial work)

  2. 2

    Footings / Stem Wall / Underground Plumbing

    BEFORE concrete is poured; all rebar must be visible

  3. 3

    Sheathing & Framing

    BEFORE any paper goes on the roof

  4. 4

    Rough Electrical / Mechanical / Top-Out Plumbing / Gas Test

    AFTER wiring is run and plumbing is in

  5. 5

    Drywall Nailing

    AFTER drywall is up and BEFORE any tape goes on

  6. 6

    Final / Certificate of Occupancy

    Everything complete; a failed final costs a $50 re-inspection fee. For commercial occupancy the Zoning Official issues a Certificate of Occupancy after inspection, and fire apparatus access (per the adopted 2003 IFC) and any required drainage improvements must be complete before the C of O is issued (Ordinance Sections 5.6.2(1), 5.13.7)

Applies to: Residential Building Permit (New Construction, Addition, Accessory Structure)

  1. 1

    Set Back Inspection

    When the building pad is done and concrete forms are set — BEFORE any plumbing goes in

  2. 2

    Footings / Stem Wall / Underground Plumbing

    BEFORE concrete is poured; all rebar must be visible

  3. 3

    Sheathing & Framing

    BEFORE any paper goes on the roof

  4. 4

    Rough Electrical / Mechanical / Top-Out Plumbing / Gas Test

    AFTER wiring is run and plumbing is in

  5. 5

    Drywall Nailing

    AFTER drywall is up and BEFORE any tape goes on

  6. 6

    Final

    Everything complete including outlet covers, carpet, and paint. A failed final costs a $50 re-inspection fee.

Applies to: Change of Use / Change of Occupancy Permit

  1. 1

    Zoning conformity inspection

    The Zoning Official inspects before issuing a Certificate of Occupancy, establishing that the use of the property conforms with the Zoning Ordinance and that all safety and health provisions are met (Section 5.6.2(1))

  2. 2

    Fire apparatus access verification

    Physical access as shown on the legal survey or approved site plan must be complete and satisfy the fire apparatus access requirements of the International Fire Code adopted by Graham County before a Certificate of Occupancy issues

  3. 3

    Drainage improvement inspection

    Required drainage improvements must be completed, inspected and approved and easements recorded, per the approved Drainage Plan, before a Certificate of Occupancy can be requested

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Combined with the mechanical/plumbing top-out and gas test inspection stage — AFTER wiring is run, before wall cover

  2. 2

    Final

    All electrical work complete and operational; part of the combined Final Inspection stage

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough Electrical

    Combined with the mechanical/plumbing top-out and gas test inspection stage — AFTER wiring is run, before wall cover

  2. 2

    Final

    EVSE equipment installed and operational; part of the combined Final Inspection stage

Applies to: Fire Sprinkler / Fire Alarm Permit (Fire Protection System)

  1. 1

    Rough / concealed fire protection piping and wiring

    Fire protection system components inspected before concealment as part of the County's building inspection sequence; Graham County employs its own building inspectors

  2. 2

    Final / Certificate of Occupancy

    Before a Certificate of Occupancy issues, physical access must be complete and satisfy the fire apparatus access requirements of the International Fire Code adopted by Graham County

Applies to: Manufactured / Mobile Home Installation Permit

  1. 1

    Foundation / Tie-Down

    Verifies foundation, blocking, and tie-down/anchoring system before utility connection

  2. 2

    Final

    Utility connections, skirting, and site conditions verified for occupancy

Applies to: Pool / Spa Permit

  1. 1

    Footings / Steel (Pre-Gunite)

    Verify rebar and pool shell reinforcement before gunite/shotcrete or concrete placement; part of the combined Footings/Stem Wall/Underground Plumbing inspection stage

  2. 2

    Final

    Pool/spa complete and filled; barrier/enclosure fully installed and verified against A.R.S. § 36-1681 and the County's 5-foot fence-height and self-latching-gate standards

Applies to: Solar PV Permit

  1. 1

    Rough Electrical

    PV wiring, combiner, and disconnect inspected before wall/roof cover, combined with the mechanical/plumbing top-out inspection stage per the County's standard inspection sequence

  2. 2

    Final

    Array mounting, bonding/grounding, and point of interconnection complete and operational

Re-inspection fees

Residential Building Permit (New Construction, Addition, Accessory Structure)Re-inspection of skipped inspections / building without a permit (late fee) · Graham County Fee Schedule (PDF, rev. 08/02/2022); confirmed by Graham County FAQ ('What happens if I build without a permit?')
$50.00 + two (2) business days for a skipped-inspection re-inspect; up to five (5) times the normal permit fee for construction without a permit
Commercial Building Permit (New Construction, Addition, Tenant Improvement)Re-inspection of skipped inspections / building without a permit (late fee) · Graham County Fee Schedule (PDF, rev. 08/02/2022).
$50.00 + two (2) business days for a skipped-inspection re-inspect; up to five (5) times the normal permit fee for construction without a permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Graham County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Unincorporated Graham County building permits

Get alerts for Unincorporated Graham County

We'll email you when Unincorporated Graham County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.