Residential Building Permit (New Construction, Addition, Accessory Structure) — Unincorporated Graham County, Arizona · Requirements sheet
Verified 2026-07-23 · Source: https://www.graham.az.gov/277/Planning-Zoning
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction, Addition, Accessory Structure) in Unincorporated Graham County, Arizona
Required for new single-family dwelling construction, additions, and accessory structures in the unincorporated areas of Graham County. Reviewed against the 2003 IBC/IRC family as adopted by the County (Planning and Zoning Ordinance Section 5.14), with fees calculated from a per-square-foot valuation formula (Section 5.15) run through a bracketed Total-Valuation fee table. Applications are submitted through the County's online portal.
Verified 2026-07-23 · Source
When you need this permit
- Building permit required for new single-family dwelling construction, additions, and accessory structures in unincorporated Graham County per Planning and Zoning Ordinance Section 5.6.2
- Apply through the County's online permit portal (https://grahamcounty.portal.iworq.net/portalhome/grahamcounty); upload building plans and a plot plan sketch, or the submission will be rejected
- Prior to issuance, the applicant must provide assurance that an approved septic system is in place or will be installed before occupancy (Ordinance Section 5.6.2(1))
- A sketch of the proposed construction with sufficient information to show compliance with the Land Use Ordinance must be provided
- Setbacks (unless a subdivision's CC&Rs specify otherwise): Front Yard 20 feet, Rear Yard 25 feet, each Side 10 feet; outbuildings 20 feet from main structure and 5 feet between outbuildings
- Permit is valid for one year from date of issuance to start construction; a renewal permit is handled as a new permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Set Back Inspection
When the building pad is done and concrete forms are set — BEFORE any plumbing goes in
- 2
Footings / Stem Wall / Underground Plumbing
BEFORE concrete is poured; all rebar must be visible
- 3
Sheathing & Framing
BEFORE any paper goes on the roof
- 4
Rough Electrical / Mechanical / Top-Out Plumbing / Gas Test
AFTER wiring is run and plumbing is in
- 5
Drywall Nailing
AFTER drywall is up and BEFORE any tape goes on
- 6
Final
Everything complete including outlet covers, carpet, and paint. A failed final costs a $50 re-inspection fee.
See the full Unincorporated Graham County inspection guide — scheduling & re-inspection fees →
Tips
- All permit applications and required documents (building plans, plot plan sketch, power of attorney) go through the County's iWorQ online portal — incomplete uploads are rejected outright, so assemble the full document set before starting the online submission.
- The County's own FAQ bluntly confirms 'dirt work' does not require a permit, but 'everything else does' — sheds, fences, walls, conex boxes, pools, and shops all need permits.
- Building without a permit is expensive: the County can charge up to 5X the normal permit fee for after-the-fact construction, on top of utility companies, insurance adjusters, and lenders all requiring proof of permit for their own processes.
- No inspections will be scheduled without a permit number in hand — contact the County's building inspectors directly by phone to schedule (per the County's published FAQ contact list) once your permit is issued.
- As of this review, the County's Planning and Zoning Ordinance contains two internal inconsistencies on adopted code editions: the codes-adopted list at Section 5.14.2 cites the 2002 NEC and (indirectly) the 2003 IMC, while later detail sections (5.14.8-5.14.9 and 5.14.12-5.14.13) cite the 1999 NEC and the 1997 Uniform Mechanical Code respectively. Confirm the exact edition governing your project with the Planning and Zoning Department before finalizing plans.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Graham County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Graham County
Residential Building Permit (New Construction, Addition, Accessory Structure) in other cities
Look up this fee in a different city →