Change of Use / Change of Occupancy Permit — Unincorporated Graham County, Arizona · Requirements sheet
Reviewed 2026-08-15 · Source: https://www.graham.az.gov/DocumentCenter/View/574/County-Zoning-Ordinance-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy Permit in Unincorporated Graham County, Arizona
Required when the use of an existing structure changes in unincorporated Graham County. The Zoning Ordinance makes it unlawful to 'use' any structure without first obtaining a Building Permit or appropriate Land Use designation, and requires the Zoning Official to issue a Certificate of Occupancy establishing that the property's use conforms to the Ordinance before occupancy is permitted. Graham County publishes no dedicated change-of-use fee line.
Reviewed 2026-08-15 · Source
When you need this permit
- Zoning Ordinance Section 5.6.2 (Permit Required): 'It shall be unlawful to erect, construct, reconstruct, alter, place, or use any structure within a Land Use District covered by the Ordinance without first obtaining a Building Permit or appropriate Land Use designation from the Planning and Zoning Department.' The Inspector shall issue the permit when it appears to fully conform to the Zoning Ordinance; in any other case a permit may be withheld.
- Zoning Ordinance Section 5.6.2(1): 'The Zoning Official shall issue a Certificate of Occupancy, after inspection, establishing that the use of said property conforms with the provisions of this ordinance and to insure that all safety and health provisions are met prior to permitting the occupancy of any building or site for residential, commercial use or manufacturing purposes.'
- Certificate of Occupancy gate 1 — fire access (Zoning Ordinance Section 5.13.7(4), whose preamble frames items 1-5 as 'an example of requirements that must be met' when applying for rezoning, building permits, or improvements of any kind): 'Prior to the issuance of a Certificate of Occupancy, the physical access (as indicated on the legal survey (if required) or as indicated on the approved site plan) must be completed, and must satisfy the requirements for fire apparatus access in accordance with the International Fire Code adopted by Graham County.'
- Certificate of Occupancy gate 2 — drainage (Zoning Ordinance Section 5.13.7(5)): 'Before requesting the issuance of a Certificate of Occupancy, any required drainage improvement must be completed, inspected, and approved; and easements recorded, in accordance with the approved Drainage Plan.'
- Where the new use is a conditional use in the district rather than a use permitted by right, a Conditional Use Permit is required (Zoning Ordinance Section 5.6.2(2): 'Some land use zones allow for a Conditional Use, which may under the circumstances of a specific case be permissible, but use in general may not be permitted')
- Outdoor lighting must be brought into compliance: Zoning Ordinance Section 8.3.3 (Change of Use) provides that 'Whenever the use of any existing building, structure or premises is changed to a new use, all outdoor lighting shall be reviewed and brought into compliance with this Code before the new use commences'
- Zoning Ordinance Section 5.14.2(6) adopts the International Existing Building Code, 2003 edition, as part of the Graham County Building Code — the technical standard for a change of occupancy
- Apply through the County's iWorQ citizen portal or in person at Planning & Zoning, 921 Thatcher Boulevard, 2nd Floor, Safford
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Zoning conformity inspection
The Zoning Official inspects before issuing a Certificate of Occupancy, establishing that the use of the property conforms with the Zoning Ordinance and that all safety and health provisions are met (Section 5.6.2(1))
- 2
Fire apparatus access verification
Physical access as shown on the legal survey or approved site plan must be complete and satisfy the fire apparatus access requirements of the International Fire Code adopted by Graham County before a Certificate of Occupancy issues
- 3
Drainage improvement inspection
Required drainage improvements must be completed, inspected and approved and easements recorded, per the approved Drainage Plan, before a Certificate of Occupancy can be requested
See the full Unincorporated Graham County inspection guide — scheduling & re-inspection fees →
Tips
- In Graham County the Certificate of Occupancy is the real instrument for a change of use — Section 5.6.2(1) requires the Zoning Official to inspect and certify that the property's use conforms to the Ordinance before occupancy is permitted at all.
- Two hard gates sit in front of that CofO and both are physical, not paper: completed fire apparatus access satisfying the adopted 2003 International Fire Code, and completed, inspected and approved drainage improvements with easements recorded.
- Check whether the new use is permitted by right or is a conditional use in the district FIRST. A Conditional Use Permit application is $350.00 and runs through the Planning and Zoning Commission and Board of Supervisors — that is a hearing calendar, not a counter transaction.
- Don't forget the outdoor lighting trigger: Section 8.3.3 requires ALL outdoor lighting on the site to be reviewed and brought into compliance with the County's lighting code before the new use commences — a change of use, not a construction project, is what fires that obligation.
- There is no dedicated change-of-use application in the iWorQ portal (its five types are Building/Addition/Remodel, Solar/Electrical/Gas Only, Temporary RV, Manufactured Home, and Outbuilding). Call Planning & Zoning at 928-428-0410 for the correct intake path.
- The technical standard is the 2003 International Existing Building Code (Zoning Ordinance Section 5.14.2(6)), which is not published online — a copy is available for public inspection at Planning and Zoning, 921 Thatcher Blvd., 2nd floor, Safford.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-15.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Graham County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Graham County
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Unincorporated Graham County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Graham County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →