Accessory Dwelling Unit (ADU) Permit in Glendale, Arizona

An Accessory Dwelling Unit (ADU) is a secondary living unit on the same lot as a single-family detached dwelling, with a kitchenette or kitchen, bathroom, and sleeping area. Glendale permits one attached ADU and one detached ADU per single-family lot (or up to two detached ADUs on lots one acre or more if one is deed-restricted as affordable housing). ADUs must not exceed 1,000 square feet. A Zoning Clearance Letter from the Planning Division is required before submitting construction documents. All ADUs must have separate utility meters (including a separate city water meter from the main dwelling).

Verified 2026-06-29 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Zoning Clearance Letter (Planning Division)Contact Planning Division at 623-930-2800 for current fee; rough estimate table in the ADU document lists $144.00ADU Requirements document (revised 9/8/2025) rough fee estimate table shows Zoning Clearance Letter (ZCL) at $144.00. This is a rough estimate; confirm current fee with the Planning Division.
Building Safety Plan Review (per ADU rough estimate)Approximately $1,052.90 for a 1,000 sq ft detached or attached ADU (rough estimate only)ADU Requirements document (revised 9/8/2025) rough fee estimate table. This is an estimate; actual fee is based on Table 3A valuation.
Building permit — valuation-based (Table 3A)Based on construction valuation per Table 3A (e.g. for a $100,000–$500,000 ADU: $1,257.16 for first $100,000 plus $7.07 per additional $1,000)City of Glendale Fee Schedule, Table 3A (effective May 10, 2019). Actual ADU permit fee based on the construction valuation determined by the Building Official.
Water & Sewer impact fees (detached ADU)Single Family (one unit per structure) Building, Water & Sewer impact fees; see current Impact Fee ScheduleADU Requirements document (revised 9/8/2025). Impact Fee Schedule is published separately (see Impact Fee Schedule PDF, revised 6/3/2026).

Review timeline

~1525 business days

Typical estimate — confirm current times with the Glendale building department

Inspection process

  1. 1

    Foundation / Footing (detached ADU)

    Before concrete is poured for the ADU's footings

  2. 2

    Rough Framing and Trades

    After rough framing, rough electrical, plumbing, and mechanical complete; before insulation and drywall

  3. 3

    Final

    When all work is complete per approved plans and Zoning Clearance Letter requirements

Tips

Frequently asked questions

Can I build an ADU in Glendale?
Yes. Glendale permits up to one attached and one detached ADU per single-family lot. ADUs must not exceed 1,000 square feet. A Zoning Clearance Letter from the Planning Division is required before submitting construction plans. All ADUs must have separate utility meters. Source: Glendale ADU Requirements and Updates document (revised 9/8/2025, based on UDC Section 35.3.204 as amended December 10, 2024).

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Glendale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Glendale

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.