Sign Permit — Glendale, Arizona · Requirements sheet
Verified 2026-07-23 · Source: https://www.glendaleaz.gov/files/assets/city/v/1/transportation/documents/sign-requirements-guidelines.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Glendale, Arizona
A sign permit is required for commercial signage in Glendale, including wall signs, monument/freestanding signs, and face changes. Plans are reviewed by the Building Safety Division against the sign requirements in Glendale Municipal Code Section 7.100 (Sign Ordinance). New tenants must have an approved tenant improvement permit or an issued Certificate of Occupancy before a sign permit can be issued. All submittals require landlord approval on company letterhead.
Verified 2026-07-23 · Source
When you need this permit
- Submit a completed fillable Permit Application (available on the Submit Electronic Plans page) with business tenant name, property address, description of work, applicant contact information, and total square footage and valuation of all proposed signs
- Sign Contractor's name, address, AZROC license number, and City of Glendale business license (if applicable)
- Glendale Business License Number and expiration date for the business
- One set of color plans drawn to scale (no free-hand sketches) showing elevations, dimensions, design, materials, and location of each proposed sign
- Cross-section detail plan showing connections, supports, returns, electrical details, and trim caps
- Footing detail plan and measurements for freestanding/monument signs
- Site plan with North arrow, surrounding street names, and full building view showing placement of all existing and proposed signage
- Landlord approval letter on company letterhead with a valid signature, printed name, management company name, and title (signature approvals on plans or by email alone are not accepted)
- New tenants must have an approved tenant improvement permit or an issued Certificate of Occupancy with a name change in the same occupancy before a sign permit will be issued
- All signs must comply with Glendale Municipal Code Section 7.100 (Sign Ordinance) — e.g., individual pan channel letters required for wall and monument signs (raceways/cabinets/can signs prohibited absent a Master Sign Package), roof signs and A-frame signs prohibited, no signs in the public right-of-way
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Sign Final Inspection
Final inspection of the installed sign, including structural attachment and electrical connections if illuminated
See the full Glendale inspection guide — scheduling & re-inspection fees →
Tips
- Wall signs require individual pan channel letters mounted directly to the wall — raceways, cabinets, backgrounds, and can signs are prohibited unless a Master Sign Package for the building allows otherwise.
- Monument signs require individual pan channel letters/logos directly mounted to the sign face; monument cabinet signs are not allowed, and signs must be set back at least 16 feet from any curb.
- Roof-top signs, A-frame signs, and signs painted or drawn on any surface are prohibited citywide.
- New tenants must have an approved tenant improvement permit or a Certificate of Occupancy in place before a sign permit will be issued.
- A permit is required for promotional banners, pennants, balloons, and other displays; placement is reviewed case-by-case.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Glendale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Glendale
Sign Permit in other cities
Compare sign permit fees across Arizona →
Look up this fee in a different city →